Final Exhibit Price Schedule -COM after CRC review.xls

XLS spreadsheet 178 KB Posted

Attached to
Change of Occupancy of Military Family Housing Units at Yokota Air Base, Japan
Solicitation number
FA5209-11-R-0001
Issued by

About this file

Solicitation SF1449

View the file

Other files

File Type Posted
Please Use_Exhibit_Price_Schedule.xls XLS spreadsheet
Notice to Offerors.pdf PDF
Government Policy Letter.pdf PDF
SF1449-Solicitation 22 Dec 2010.pdf PDF
PPI List COM-Three Reference List.docx DOCX document
Performance Plan Final 22 Dec 10.pdf PDF
PP Questionnaire COM.doc DOC document
PWS Final 22 Dec 10.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Y Basic (2)

ITEM NOSUPPLIES/SERVICESEST QUANTITYUNITUNIT PRICEESTIMATED AMOUNT
BASIC PERIOD: 1 Apr 07 thru 31 Mar 08
0001Perform COM Routine Repair and Replacement:910HSG UNIT¥40,000¥36,400,000
0002Incidental Labor (Reimbursable Materials):
Architectural Work
0002AAReplace/Install blinds and shades2,438EA¥500¥1,219,000
0002ABReplace door locks with new cylinder door locks52EA¥1,500¥78,000
0002ACReplace aluminum/wood screen window with new aluminum/metal screen7EA¥800¥5,600
0002ADReplace sliding screen door with new aluminum/steel frame11EA¥1,500¥16,500
0002AEReplace/install door61EA¥2,000¥122,000
0002AFReplace sheet glass (3/5/6.8mm) / aluminum sheet173EA¥1,500¥259,500
0002AGReplace aluminum sheet bathroom/shower room4EA¥3,000¥12,000
0002AHRepair/Replace air conditioner port door, hinges, locks, latch set9EA¥6,000¥54,000
0002AJReplace kitchen countertops2EA¥8,000¥16,000
Mechanical Work
0002AKReplace faucets/faucet diverter5EA¥1,000¥5,000
0002ALReplace combination faucet for bathtub1EA¥2,000¥2,000
Electrical Work
0002AMInstall/Replace fluorescent-type lighting fixtures17EA¥1,000¥17,000
0002ANInstall/Replace interior & exterior incandescent-type lighting fixtures52EA¥1,000¥52,000
0002APInstall/Replace lighting fixtures cover or diffuser/bulb protector412EA¥700¥288,400
TOTAL ESTIMATED AMOUNT FOR CLIN 0002¥2,147,000
0003Additional Maintenance Work (Unit Price Basis):
Painting:
0003AASemi-gloss Latex w/Surface Preparation2,280,871SF¥38¥86,673,098
0003ABSemi-gloss Base Enamel w/Surface Preparation965,750SF¥40¥38,630,000
0003ACVarnish and Stain w/Surface Preparation420,818SF¥30¥12,624,540
Architectural Repair/Replacement
Floor Work:
0003ADRemove/Install 2mm thick vinyl floor tile including treads and risers10,508SF¥200¥2,101,600
0003AEReplace/Install 2mm thick vinyl sheet flooring1,000SF¥1,000¥1,000,000
0003AFReplace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor)10,110SF¥450¥4,549,500
0003AGReplace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden)11,023SF¥500¥5,511,500
0003AHReplace non-slip nosing on concrete steps w/ceramic tile (Garden)170SF¥300¥51,000
0003AJReplace non-slip nosing on stairway w/brass edged plastic nosing (Garden)78SF¥500¥39,000
0003AKReplace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom30SF¥650¥19,500
0003ALReplace 6"x 6" quarry tile70SF¥600¥42,000
0003AMReplace terrazzo floor tile w/new (30 mm thk)40SF¥800¥32,000
0003ANRepair/Replace concrete floor edge on patio124SF¥400¥49,600
Floor Maintenance
0003APFloor Maintenance (2BR/3BR)391HSG UNIT¥20,000¥7,820,000
0003AQFloor Maintenance (4BR/SOQ/GOQ Units)98HSG UNIT¥30,000¥2,940,000
0003ARPartial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ)34HSG UNIT¥7,000¥238,000
Carpet Cleaning
0003ASSteam Clean Carpets (other than SOQ/SEQ/GOQ)419HSG UNIT¥14,000¥5,866,000
0003ATSteam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ)22HSG UNIT¥40,000¥880,000
0003AURemove existing wall-to-wall carpet.195SF¥800¥156,000
0003AVReplace/Install wall-to-wall carpet24,043SY¥1,350¥32,458,050
0003AWRepair/patch of wall-to-wall carpet736SY¥500¥368,000
Wall & Ceiling Work
0003AXRemove damaged baseboard and replace with new vinyl base88,776LF¥50¥4,438,800
0003AYReplace ceiling acoustic tile135SF¥400¥54,000
0003AZRemove damaged finish lumber and replace with new finish lumber76BF¥300¥22,800
0003BAReplace ceramic wall or floor tiles (4x4, 6x6 etc.) with new6,020EA¥500¥3,010,000
0003BBRemove & replace existing plaster, fiber gypsum wall board with new190SF¥800¥152,000
0003BCRemove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints60SF¥300¥18,000
0003BDRemove & replace ceiling access door (Garden) w/new aluminum framed door3EA¥17,000¥51,000
0003BERemove damaged rough lumber and replace with new (Garden)11BF¥1,500¥16,500
0003BFRemove damaged curtain box & replace w/new paint finish curtain box (Garden)1EA¥10,000¥10,000
0003BGRemove vinyl wall covering and replace with new wall covering10,459SF¥130¥1,359,670
0003BHRemove vinyl wall covering and paint wall32SF¥180¥5,760
Door & Window Work:
0003BJRemove damaged curtain rails and replace with new s. steel rails31EA¥2,500¥77,500
0003BKMaintenance of Windows & Door Glass 2 BR/3 BR Units792HSG UNIT¥6,000¥4,752,000
0003BLMaintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ118HSG UNIT¥10,000¥1,180,000
0003BMMaintenance of Windows & Door Glass GOQ1HSG UNIT¥30,000¥30,000
0003BNReplace aluminum window railing, incl. bolts & hardware (Garden)4EA¥8,000¥32,000
0003BPRemove damaged window/door trims & replace with new wood trims4EA¥1,000¥4,000
¥0
0003BQRepair wooden A/C port door including plywood cover and weather stripping526EA¥1,000¥526,000
Cabinet Work
0003BRReplace damaged cabinet bottom and back65SF¥800¥52,000
0003BSReplace damaged plastic laminated sheets17,168SF¥500¥8,584,000
0003BTReplace damaged cabinet shelf45LF¥800¥36,000
Mechanical Maintenance, Repair & Replacement
0003BURecoat bathtub with ceramic finish44EA¥170,000¥7,480,000
0003BVReplace commode/water closet with new16EA¥30,000¥480,000
0003BWReplace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min1EA¥20,000¥20,000
0003BXReplace bathroom ceiling exhaust fan 115V19EA¥20,000¥380,000
0003BYReplace kitchen range hood with Government-Furnished* hood34EA¥5,000¥170,000
0003BZReplace lavatory including faucets, "P" trap, shop valves & brackets46EA¥18,000¥828,000
0003CARemove and replace damaged medicine cabinet w/new and built-in lamp91EA¥27,000¥2,457,000
0003CBRemove and replace damaged medicine cabinet with new (no built-in lamp)4EA¥25,000¥100,000
0003CCReplace "P" trap for lavatory or sink276EA¥6,500¥1,794,000
0003CDReplace water tank for water closet1EA¥25,000¥25,000
0003CEReplace water tank lid4EA¥10,000¥40,000
Electric Maintenance, Repair & Replacement:
Conduit & Wiring and Installation Work:
0003CFReplace rigid conduit (19mm, 25mm)1LM¥500¥500
0003CGReplace flexible conduit (17mm)1LM¥500¥500
0003CHReplace wire IV, #12 AWG.4LM¥300¥1,200
0003CJReplace cable (CVV), 2C #16 AWG1LM¥500¥500
0003CKReplace cable (VVF), 2C & 3C #12 AWG with fittings1LM¥400¥400
Wiring Device Installation Work:
0003CLInstall/Replace switch box with cover4EA¥800¥3,200
0003CMChange tumbler switch control circuits of the ceiling lights in dining & living rooms4EA¥500¥2,000
Other Electric Work:
0003CNInspect/Check panel board to include megger test and report30EA¥3,000¥90,000
0003CPMeasure ground resistance of the grounding system, & reports30EA¥3,000¥90,000
0003CQInstallation of Occupant Name Tag300EA¥4,500¥1,350,000
0003CRInstall Government-furnished Window AC Unit 8,000 BTU240EA¥2,000¥480,000
0003CSInstall Government-furnished Window AC Unit 18,000 BTU120EA¥3,000¥360,000
0003CTRemove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking45EA¥5,000¥225,000
0003CURemove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking27EA¥5,000¥135,000
TOTAL ESTIMATED AMOUNT FOR CLIN 0003¥242,973,718
0004Cleaning Work
0004AAPerform COM Basic Cleaning (2/3 Bedroom Units)546HSG UNIT¥30,000¥16,380,000
0004ABPerform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units)102HSG UNIT¥35,000¥3,570,000
0004ACPerform COM Bathroom Cleaning (2/3 Bedroom Units)546HSG UNIT¥7,000¥3,822,000
0004ADPerform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units)102HSG UNIT¥13,000¥1,326,000
0004AEPerform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ)648HSG UNIT¥9,000¥5,832,000
0004AFPerform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ)648HSG UNIT¥9,000¥5,832,000
0004AGPerform Full Cleaning GOQs1EA¥160,000¥160,000
0004AHPerform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ)169HSG UNIT¥6,000¥1,014,000
0004AJPerform Yard Maintenance (2/3/4 Bedroom Units/SEQ/SOQ)1,049HSG UNIT¥8,000¥8,392,000
Vacant Units and Local Move Cleaning
0004AKVacant Unit Cleaning with Routine Maintenance (2/3/BR)6HSG UNIT¥60,000¥360,000
0004ALVacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ)6HSG UNIT¥70,000¥420,000
0004AMVacant Unit Cleaning without Routine Maintenance (2/3/BR)6HSG UNIT¥30,000¥180,000
0004ANVacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ)6HSG UNIT¥40,000¥240,000
0004APPerform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ)128HSG UNIT¥9,000¥1,152,000
0004AQPerform Local move COM Cleaning (2/3 Bedroom Units)215HSG UNIT¥30,000¥6,450,000
0004ARPerform Local move COM Bathroom Cleaning (2/3 Bedroom Units)228HSG UNIT¥7,000¥1,596,000
0004ASPerform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units)9HSG UNIT¥35,000¥315,000
0004ATPerform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units)18HSG UNIT¥13,000¥234,000
0004AUPerform Local move COM Cleaning for GOQ4HSG UNIT¥16,000¥64,000
TOTAL ESTIMATED AMOUNT FOR CLIN 0004¥57,339,000
TOTAL ESTIMATED AMOUNT FOR BASIC PERIOD:¥¥338,859,718

&C&"Times New Roman,Regular"&12&UEXHIBIT A, PRICING SCHEDULE &R&"Times New Roman,Regular"Contract No. FA5209-07-D-0011 Attachment No. 1

EXHIBIT A

ITEM NOSUPPLIES/SERVICESEST QUANTITYUNITUNIT PRICEESTIMATED AMOUNT
Basic Year: 1 Apr 11 thru 31 Mar 12
A001Perform COM Routine Repair and Replacement:645HSG UNIT¥0
A002Incidental Labor (Reimbursable Materials):
Architectural Work
A002AAReplace/Install blinds and shades600EA¥0
A002ABReplace door locks with new cylinder door locks35EA¥0
A002ACReplace aluminum/wood screen window with new aluminum/metal screen2EA¥0
A002ADReplace sliding screen door with new aluminum/steel frame89EA¥0
A002AEReplace/install door5EA¥0
A002AFReplace sheet glass (3/5/6.8mm) / aluminum sheet42EA¥0
A002AGReplace aluminum sheet bathroom/shower room2EA¥0
A002AHRepair/Replace air conditioner port door, hinges, locks, latch set2EA¥0
A002AJReplace kitchen countertops2EA¥0
Mechanical Work
A002AKReplace faucets/faucet diverter26EA¥0
A002ALReplace combination faucet for bathtub2EA¥0
Electrical Work
A002AMInstall/Replace fluorescent-type lighting fixtures34EA¥0
A002ANInstall/Replace interior & exterior incandescent-type lighting fixtures23EA¥0
A002APInstall/Replace lighting fixtures cover or diffuser/bulb protector199EA¥0
TOTAL ESTIMATED AMOUNT FOR CLIN A002¥0
A003Additional Maintenance Work (Unit Price Basis):
Painting:
A003AASemi-gloss Latex w/Surface Preparation1,601,206SF¥0
A003ABSemi-gloss Base Enamel w/Surface Preparation668,630SF¥0
A003ACVarnish and Stain w/Surface Preparation119,027SF¥0
Architectural Repair/Replacement
Floor Work:
A003ADRemove/Install 2mm thick vinyl floor tile including treads and risers6,167SF¥0
A003AEReplace/Install 2mm thick vinyl sheet flooring364SF¥0
A003AFReplace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor)8,371SF¥0
A003AGReplace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden)6,513SF¥0
A003AHReplace non-slip nosing on concrete steps w/ceramic tile (Garden)364SF¥0
A003AJReplace non-slip nosing on stairway w/brass edged plastic nosing (Garden)20SF¥0
A003AKReplace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom80SF¥0
A003ALReplace 6"x 6" quarry tile46SF¥0
A003AMReplace terrazzo floor tile w/new (30 mm thk)2SF¥0
A003ANRepair/Replace concrete floor edge on patio33SF¥0
Floor Maintenance (Wax Finish)
A003APFloor Maintenance (2BR/3BR)33HSG UNIT¥0
A003AQFloor Maintenance (4BR/SOQ/GOQ Units)16HSG UNIT¥0
A003ARPartial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ)619HSG UNIT¥0
Carpet Cleaning
A003ASSteam Clean Carpets (other than SOQ/SEQ/GOQ)325HSG UNIT¥0
A003ATSteam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ)14HSG UNIT¥0
A003AURemove existing wall-to-wall carpet.63SF¥0
A003AVReplace/Install wall-to-wall carpet24,045SY¥0
A003AWRepair/patch of wall-to-wall carpet189SY¥0
Wall & Ceiling Work
A003AXRemove damaged baseboard and replace with new vinyl base2,752LF¥0
A003AYReplace ceiling acoustic tile41SF¥0
A003AZRemove damaged finish lumber and replace with new finish lumber36BF¥0
A003BAReplace ceramic wall or floor tiles (4x4, 6x6 etc.) with new8,108EA¥0
A003BBRemove & replace existing plaster, fiber gypsum wall board with new92SF¥0
A003BCRemove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints1,216SF¥0
A003BDRemove & replace ceiling access door (Garden) w/new aluminum framed door1EA¥0
A003BERemove damaged rough lumber and replace with new (Garden)15BF¥0
A003BFRemove damaged curtain box & replace w/new paint finish curtain box (Garden)1EA¥0
A003BGRemove vinyl wall covering and replace with new wall covering348SF¥0
A003BHRemove vinyl wall covering and paint wall10,115SF¥0
Door & Window Work:
A003BJRemove damaged curtain rails and replace with new steel rails8EA¥0
A003BKMaintenance of Windows & Door Glass 2 BR/3 BR Units542HSG UNIT¥0
A003BLMaintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ74HSG UNIT¥0
A003BMMaintenance of Windows & Door Glass GOQ2HSG UNIT¥0
A003BNReplace aluminum window railing, incl. bolts & hardware (Garden)1EA¥0
A003BPRemove damaged window/door trims & replace with new wood trims1EA¥0
A003BQRepair wooden A/C port door including plywood cover and weather stripping1EA¥0
Cabinet Work
A003BRReplace damaged cabinet bottom and back25SF¥0
A003BSReplace damaged plastic laminated sheets1,589SF¥0
A003BTReplace damaged cabinet shelf12LF¥0
Mechanical Maintenance, Repair & Replacement
A003BURecoat bathtub with ceramic finish236EA¥0
A003BVReplace commode/water closet with new12EA¥0
A003BWReplace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min1EA¥0
A003BXReplace bathroom ceiling exhaust fan 115V5EA¥0
A003BYReplace kitchen range hood with Government-Furnished* hood1EA¥0
A003BZReplace lavatory including faucets, "P" trap, shop valves & brackets22EA¥0
A003CARemove and replace damaged medicine cabinet w/new and built-in lamp19EA¥0
A003CBRemove and replace damaged medicine cabinet with new (no built-in lamp)7EA¥0
A003CCReplace "P" trap for lavatory or sink104EA¥0
A003CDReplace water tank for water closet1EA¥0
A003CEReplace water tank lid1EA¥0
Electric Maintenance, Repair & Replacement:
Conduit & Wiring and Installation Work:
A003CFReplace rigid conduit (19mm, 25mm)1LM¥0
A003CGReplace flexible conduit (17mm)1LM¥0
A003CHReplace wire IV, #12 AWG.1LM¥0
A003CJReplace cable (CVV), 2C #16 AWG1LM¥0
A003CKReplace cable (VVF), 2C & 3C #12 AWG with fittings1LM¥0
Wiring Device Installation Work:
A003CLInstall/Replace switch box with cover1EA¥0
A003CMChange tumbler switch control circuits of the ceiling lights in dining & living rooms1EA¥0
Other Electric Work:
A003CNInspect/Check panel board to include megger test and report1EA¥0
A003CPMeasure ground resistance of the grounding system and report1EA¥0
A003CQInstallation of Occupant Name Tag591EA¥0
A003CRInstall Government-furnished Window AC Unit 8,000 BTU1EA¥0
A003CSInstall Government-furnished Window AC Unit 18,000 BTU1EA¥0
A003CTRemove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking119EA¥0
A003CURemove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking3EA¥0
TOTAL ESTIMATED AMOUNT FOR CLIN A003¥0
A004Cleaning Work
A004AAPerform COM Basic Cleaning (2/3 Bedroom Units)381HSG UNIT¥0
A004ABPerform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units)62HSG UNIT¥0
A004ACPerform COM Bathroom Cleaning (2/3 Bedroom Units)381HSG UNIT¥0
A004ADPerform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units)62HSG UNIT¥0
A004AEPerform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ)442HSG UNIT¥0
A004AFPerform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ)442HSG UNIT¥0
A004AGPerform Full Cleaning GOQs2EA¥0
A004AHPerform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ)32HSG UNIT¥0
A004AJPerform Yard Maintenance (2/3/4 Bedroom nits/SEQ/SOQ)337HSG UNIT¥0
Vacant Units and Local Move Cleaning
A004AKVacant Unit Cleaning with Routine Maintenance (2/3/BR)97HSG UNIT¥0
A004ALVacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ)43HSG UNIT¥0
A004AMVacant Unit Cleaning without Routine Maintenance (2/3/BR)128HSG UNIT¥0
A004ANVacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ)22HSG UNIT¥0
A004APPerform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ)75HSG UNIT¥0
A004AQPerform Local move COM Cleaning (2/3 Bedroom Units)70HSG UNIT¥0
A004ARPerform Local move COM Bathroom Cleaning (2/3 Bedroom Units)78HSG UNIT¥0
A004ASPerform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units)3HSG UNIT¥0
A004ATPerform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units)8HSG UNIT¥0
A004AUPerform Local move COM Cleaning for GOQ1HSG UNIT¥0
TOTAL ESTIMATED AMOUNT FOR CLIN A004¥0
TOTAL ESTIMATED AMOUNT FOR BASIC PERIOD:¥0

&C&"Times New Roman,Bold"&12&UEXHIBIT A, PRICING SCHEDULE &R&"Times New Roman,Regular"RFP No. FA5209-11-R-0001 Attachment No. 1

EXHIBIT B

ITEM NOSUPPLIES/SERVICESEST
QUANTITYUNITUNIT PRICEESTIMATED AMOUNT
Option 1: 1 Apr 12 thru 31 Mar 13
B001Perform COM Routine Repair and Replacement:645HSG UNIT¥0
B002Incidental Labor (Reimbursable Materials):
Architectural Work
B002AAReplace/Install blinds and shades600EA¥0
B002ABReplace door locks with new cylinder door locks35EA¥0
B002ACReplace aluminum/wood screen window with new aluminum/metal screen2EA¥0
B002ADReplace sliding screen door with new aluminum/steel frame89EA¥0
B002AEReplace/install door5EA¥0
B002AFReplace sheet glass (3/5/6.8mm) / aluminum sheet42EA¥0
B002AGReplace aluminum sheet bathroom/shower room2EA¥0
B002AHRepair/Replace air conditioner port door, hinges, locks, latch set2EA¥0
B002AJReplace kitchen countertops2EA¥0
Mechanical Work
B002AKReplace faucets/faucet diverter26EA¥0
B002ALReplace combination faucet for bathtub2EA¥0
Electrical Work
B002AMInstall/Replace fluorescent-type lighting fixtures34EA¥0
B002ANInstall/Replace interior & exterior incandescent-type lighting fixtures23EA¥0
B002APInstall/Replace lighting fixtures cover or diffuser/bulb protector199EA¥0
TOTAL ESTIMATED AMOUNT FOR CLIN B002¥0
B003Additional Maintenance Work (Unit Price Basis):
Painting:
B003AASemi-gloss Latex w/Surface Preparation1,601,206SF¥0
B003ABSemi-gloss Base Enamel w/Surface Preparation668,630SF¥0
B003ACVarnish and Stain w/Surface Preparation119,027SF¥0
Architectural Repair/Replacement
Floor Work:
B003ADRemove/Install 2mm thick vinyl floor tile including treads and risers6,167SF¥0
B003AEReplace/Install 2mm thick vinyl sheet flooring364SF¥0
B003AFReplace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor)8,371SF¥0
B003AGReplace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden)6,513SF¥0
B003AHReplace non-slip nosing on concrete steps w/ceramic tile (Garden)20SF¥0
B003AJReplace non-slip nosing on stairway w/brass edged plastic nosing (Garden)
B003AKReplace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom80SF¥0
B003ALReplace 6"x 6" quarry tile46SF¥0
B003AMReplace terrazzo floor tile w/new (30 mm thk)2SF¥0
B003ANRepair/Replace concrete floor edge on patio33SF¥0
Floor Maintenance (Wax Finish)
B003APFloor Maintenance (2BR/3BR)33HSG UNIT¥0
B003AQFloor Maintenance (4BR/SOQ/GOQ Units)16HSG UNIT¥0
B003ARPartial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ)619HSG UNIT¥0
Carpet Cleaning
B003ASSteam Clean Carpets (other than SOQ/SEQ/GOQ)325HSG UNIT¥0
B003ATSteam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ)14HSG UNIT¥0
B003AURemove existing wall-to-wall carpet.63SF¥0
B003AVReplace/Install wall-to-wall carpet24,045SY¥0
B003AWRepair/patch of wall-to-wall carpet189SY¥0
Wall & Ceiling Work
B003AXRemove damaged baseboard and replace with new vinyl base2,752LF¥0
B003AYReplace ceiling acoustic tile41SF¥0
B003AZRemove damaged finish lumber and replace with new finish lumber36BF¥0
B003BAReplace ceramic wall or floor tiles (4x4, 6x6 etc.) with new8,108EA¥0
B003BBRemove & replace existing plaster, fiber gypsum wall board with new92SF¥0
B003BCRemove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints1,216SF¥0
B003BDRemove & replace ceiling access door (Garden) w/new aluminum framed door1EA¥0
B003BERemove damaged rough lumber and replace with new (Garden)15BF¥0
B003BFRemove damaged curtain box & replace w/new paint finish curtain box (Garden)1EA¥0
B003BGRemove vinyl wall covering and replace with new wall covering348SF¥0
B003BHRemove vinyl wall covering and paint wall10,115SF¥0
Door & Window Work:
B003BJRemove damaged curtain rails and replace with new steel rails8EA¥0
B003BKMaintenance of Windows & Door Glass 2 BR/3 BR Units542HSG UNIT¥0
B003BLMaintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ74HSG UNIT¥0
B003BMMaintenance of Windows & Door Glass GOQ2HSG UNIT¥0
B003BNReplace aluminum window railing, incl. bolts & hardware (Garden)1EA¥0
B003BPRemove damaged window/door trims & replace with new wood trims1EA¥0
B003BQRemove wood A/C port door including plywood cover and weather stripping1EA¥0
Cabinet Work
B003BRReplace damaged cabinet bottom and back25SF¥0
B003BSReplace damaged plastic laminated sheets1,589SF¥0
B003BTReplace damaged cabinet shelf12LF¥0
Mechanical Maintenance, Repair & Replacement
B003BURecoat bathtub with ceramic finish236EA¥0
B003BVReplace commode/water closet with new12EA¥0
B003BWReplace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min1EA¥0
B003BXReplace bathroom ceiling exhaust fan 115V5EA¥0
B003BYReplace kitchen range hood with Government-Furnished* hood1EA¥0
B003BZReplace lavatory including faucets, "P" trap, shop valves & brackets22EA¥0
B003CARemove and replace damaged medicine cabinet w/new and built-in lamp19EA¥0
B003CBRemove and replace damaged medicine cabinet with new (no built-in lamp)7EA¥0
B003CCReplace "P" trap for lavatory or sink104EA¥0
B003CDReplace water tank for water closet1EA¥0
B003CEReplace water tank lid1EA¥0
Electric Maintenance, Repair & Replacement:
Conduit & Wiring and Installation Work:
B003CFReplace rigid conduit (19mm, 25mm)1LM¥0
B003CGReplace flexible conduit (17mm)1LM¥0
B003CHReplace wire IV, #12 AWG.1LM¥0
B003CJReplace cable (CVV), 2C #16 AWG1LM¥0
B003CKReplace cable (VVF), 2C & 3C #12 AWG with fittings1LM¥0
Wiring Device Installation Work:
B003CLInstall/Replace switch box with cover1EA¥0
B003CMChange tumbler switch control circuits of the ceiling lights in dining & living rooms1EA¥0
Other Electric Work:
B003CNInspect/Check panel board to include megger test and report1EA¥0
B003CPMeasure ground resistance of the grounding system and report1EA¥0
B003CQInstallation of Occupant Name Tag591EA¥0
B003CRInstall Government-furnished Window AC Unit 8,000 BTU1EA¥0
B003CSInstall Government-furnished Window AC Unit 18,000 BTU1EA¥0
B003CTRemove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking119EA¥0
B003CURemove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking3EA¥0
TOTAL ESTIMATED AMOUNT FOR CLIN B003¥0
B004Cleaning Work
B004AAPerform COM Basic Cleaning (2/3 Bedroom Units)381HSG UNIT¥0
B004ABPerform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units)62HSG UNIT¥0
B004ACPerform COM Bathroom Cleaning (2/3 Bedroom Units)381HSG UNIT¥0
B004ADPerform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units)62HSG UNIT¥0
B004AEPerform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ)442HSG UNIT¥0
B004AFPerform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ)442HSG UNIT¥0
B004AGPerform Full Cleaning GOQs2EA¥0
B004AHPerform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ)32HSG UNIT¥0
B004AJPerform Yard Maintenance (2/3/4 Bedroom Units/SEQ/SOQ)337HSG UNIT¥0
Vacant Units and Local Move Cleaning
B004AKVacant Unit Cleaning with Routine Maintenance (2/3/BR)97HSG UNIT¥0
B004ALVacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ)43HSG UNIT¥0
B004AMVacant Unit Cleaning without Routine Maintenance (2/3/BR)128HSG UNIT¥0
B004ANVacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ)22HSG UNIT¥0
B004APPerform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ)75HSG UNIT¥0
B004AQPerform Local move COM Cleaning (2/3 Bedroom Units)70HSG UNIT¥0
B004ARPerform Local move COM Bathroom Cleaning (2/3 Bedroom Units)78HSG UNIT¥0
B004ASPerform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units)3HSG UNIT¥0
B004ATPerform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units)8HSG UNIT¥0
B004AUPerform Local move COM Cleaning for GOQ1HSG UNIT¥0
TOTAL ESTIMATED AMOUNT FOR CLIN B004¥0
TOTAL ESTIMATED AMOUNT FOR OPTION ONE PERIOD:¥0

&C&"Times New Roman,Bold"&12&UEXHIBIT B, PRICING SCHEDULE &R&"Times New Roman,Regular"RFP No. FA5209-11-R-0001

EXHIBIT C

ITEM NOSUPPLIES/SERVICESEST QUANTITYUNITUNIT PRICEESTIMATED AMOUNT
Option 2: 1 Apr 13 thru 31 Mar 14
C001Perform COM Routine Repair and Replacement:645HSG UNIT¥0
C002Incidental Labor (Reimbursable Materials):
Architectural Work
C002AAReplace/Install blinds and shades600EA¥0
C002ABReplace door locks with new cylinder door locks35EA¥0
C002ACReplace aluminum/wood screen window with new aluminum/metal screen2EA¥0
C002ADReplace sliding screen door with new aluminum/steel frame89EA¥0
C002AEReplace/install door5EA¥0
C002AFReplace sheet glass (3/5/6.8mm) / aluminum sheet42EA¥0
C002AGReplace aluminum sheet bathroom/shower room2EA¥0
C002AHRepair/Replace air conditioner port door, hinges, locks, latch set2EA¥0
C002AJReplace kitchen countertops2EA¥0
Mechanical Work
C002AKReplace faucets/faucet diverter26EA¥0
C002ALReplace combination faucet for bathtub2EA¥0
Electrical Work
C002AMInstall/Replace fluorescent-type lighting fixtures34EA¥0
C002ANInstall/Replace interior & exterior incandescent-type lighting fixtures23EA¥0
C002APInstall/Replace lighting fixtures cover or diffuser/bulb protector199EA¥0
TOTAL ESTIMATED AMOUNT FOR CLIN C002¥0
C003Additional Maintenance Work (Unit Price Basis):
Painting:
C003AASemi-gloss Latex w/Surface Preparation1,601,206SF¥0
C003ABSemi-gloss Base Enamel w/Surface Preparation668,630SF¥0
C003ACVarnish and Stain w/Surface Preparation119,027SF¥0
Architectural Repair/Replacement
Floor Work:
C003ADRemove/Install 2mm thick vinyl floor tile including treads and risers6,167SF¥0
C003AEReplace/Install 2mm thick vinyl sheet flooring364SF¥0
C003AFReplace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor)8,371SF¥0
C003AGReplace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden)6,513SF¥0
C003AHReplace non-slip nosing on concrete steps w/ceramic tile (Garden)364SF¥0
C003AJReplace non-slip nosing on stairway w/brass edged plastic nosing (Garden)20SF¥0
C003AKReplace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom80SF¥0
C003ALReplace 6"x 6" quarry tile46SF¥0
C003AMReplace terrazzo floor tile w/new (30 mm thk)2SF¥0
C003ANRepair/Replace concrete floor edge on patio33SF¥0
Floor Maintenance (Wax Finish)
C003APFloor Maintenance (2BR/3BR)33HSG UNIT¥0
C003AQFloor Maintenance (4BR/SOQ/GOQ Units)16HSG UNIT¥0
C003ARPartial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ)619HSG UNIT¥0
Carpet Cleaning
C003ASSteam Clean Carpets (other than SOQ/SEQ/GOQ)325HSG UNIT¥0
C003ATSteam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ)14HSG UNIT¥0
C003AURemove existing wall-to-wall carpet.63SF¥0
C003AVReplace/Install wall-to-wall carpet24,045SY¥0
C003AWRepair/patch of wall-to-wall carpet189SY¥0
Wall & Ceiling Work
C003AXRemove damaged baseboard and replace with new vinyl base2,752LF¥0
C003AYReplace ceiling acoustic tile41SF¥0
C003AZRemove damaged finish lumber and replace with new finish lumber36BF¥0
C003BAReplace ceramic wall or floor tiles (4x4, 6x6 etc.) with new8,108EA¥0
C003BBRemove & replace existing plaster, fiber gypsum wall board with new92SF¥0
C003BCRemove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints1,216SF¥0
C003BDRemove & replace ceiling access door (Garden) w/new aluminum framed door1EA¥0
C003BERemove damaged rough lumber and replace with new (Garden)15BF¥0
C003BFRemove damaged curtain box & replace w/new paint finish curtain box (Garden)1EA¥0
C003BGRemove vinyl wall covering and replace with new wall covering348SF¥0
C003BHRemove vinyl wall covering and paint wall10,115SF¥0
Door & Window Work:
C003BJRemove damaged curtain rails and replace with new steel rails8EA¥0
C003BKMaintenance of Windows & Door Glass 2 BR/3 BR Units542HSG UNIT¥0
C003BLMaintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ74HSG UNIT¥0
C003BMMaintenance of Windows & Door Glass GOQ2HSG UNIT¥0
C003BNReplace aluminum window railing, incl. bolts & hardware (Garden)1EA¥0
C003BPRemove damaged window/door trims & replace with new wood trims1EA¥0
C003BQRepair wooden A/C port door including plywood cover and weather stripping1EA¥0
Cabinet Work
C003BRReplace damaged cabinet bottom and back25SF¥0
C003BSReplace damaged plastic laminated sheets1,589SF¥0
C003BTReplace damaged cabinet shelf12LF¥0
Mechanical Maintenance, Repair & Replacement
C003BURecoat bathtub with ceramic finish236EA¥0
C003BVReplace commode/water closet with new12EA¥0
C003BWReplace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min1EA¥0
C003BXReplace bathroom ceiling exhaust fan 115V5EA¥0
C003BYReplace kitchen range hood with Government-Furnished* hood1EA¥0
C003BZReplace lavatory including faucets, "P" trap, shop valves & brackets22EA¥0
C003CARemove and replace damaged medicine cabinet w/new and built-in lamp19EA¥0
C003CBRemove and replace damaged medicine cabinet with new (no built-in lamp)7EA¥0
C003CCReplace "P" trap for lavatory or sink104EA¥0
C003CDReplace water tank for water closet1EA¥0
C003CEReplace water tank lid1EA¥0
Electric Maintenance, Repair & Replacement:
Conduit & Wiring and Installation Work:
C003CFReplace rigid conduit (19mm, 25mm)1LM¥0
C003CGReplace flexible conduit (17mm)1LM¥0
C003CHReplace wire IV, #12 AWG.1LM¥0
C003CJReplace cable (CVV), 2C #16 AWG1LM¥0
C003CKReplace cable (VVF), 2C & 3C #12 AWG with fittings1LM¥0
Wiring Device Installation Work:
C003CLInstall/Replace switch box with cover1EA¥0
C003CMChange tumbler switch control circuits of the ceiling lights in dining & living rooms1EA¥0
Other Electric Work:
C003CNInspect/Check panel board to include megger test and report1EA¥0
C003CPMeasure ground resistance of the grounding system and report1EA¥0
C003CQInstallation of Occupant Name Tag591EA¥0
C003CRInstall Government-furnished Window AC Unit 8,000 BTU1EA¥0
C003CSInstall Government-furnished Window AC Unit 18,000 BTU1EA¥0
C003CTRemove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking119EA¥0
C003CURemove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking3EA¥0
TOTAL ESTIMATED AMOUNT FOR CLIN C003¥0
C004Cleaning Work
C004AAPerform COM Basic Cleaning (2/3 Bedroom Units)381HSG UNIT¥0
C004ABPerform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units)62HSG UNIT¥0
C004ACPerform COM Bathroom Cleaning (2/3 Bedroom Units)381HSG UNIT¥0
C004ADPerform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units)62HSG UNIT¥0
C004AEPerform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ)442HSG UNIT¥0
C004AFPerform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ)442HSG UNIT¥0
C004AGPerform Full Cleaning GOQs2EA¥0
C004AHPerform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ)32HSG UNIT¥0
C004AJPerform Yard Maintenance (2/3/4 Bedroom Units/SEQ/SOQ)337HSG UNIT¥0
Vacant Units and Local Move Cleaning
C004AKVacant Unit Cleaning with Routine Maintenance (2/3/BR)97HSG UNIT¥0
C004ALVacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ)43HSG UNIT¥0
C004AMVacant Unit Cleaning without Routine Maintenance (2/3/BR)128HSG UNIT¥0
C004ANVacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ)22HSG UNIT¥0
C004APPerform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ)75HSG UNIT¥0
C004AQPerform Local move COM Cleaning (2/3 Bedroom Units)70HSG UNIT¥0
C004ARPerform Local move COM Bathroom Cleaning (2/3 Bedroom Units)78HSG UNIT¥0
C004ASPerform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units)3HSG UNIT¥0
C004ATPerform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units)8HSG UNIT¥0
C004AUPerform Local move COM Cleaning for GOQ1HSG UNIT¥0
TOTAL ESTIMATED AMOUNT FOR CLIN C004¥0
TOTAL ESTIMATED AMOUNT FOR OPTION TWO PERIOD:¥0

&C&"Times New Roman,Bold"&12&UEXHIBIT C, PRICING SCHEDULE &R&"Times New Roman,Regular"RFP No. FA5209-11-R-0001

EXHIBIT D

ITEM NOSUPPLIES/SERVICESEST QUANTITYUNITUNIT PRICEESTIMATED AMOUNT
Option 3: 1 Apr 14 thru 31 Mar 15
D001Perform COM Routine Repair and Replacement:645HSG UNIT¥0
D002Incidental Labor (Reimbursable Materials):
Architectural Work
D002AAReplace/Install blinds and shades600EA¥0
D002ABReplace door locks with new cylinder door locks35EA¥0
D002ACReplace aluminum/wood screen window with new aluminum/metal screen2EA¥0
D002ADReplace sliding screen door with new aluminum/steel frame89EA¥0
D002AEReplace/install door5EA¥0
D002AFReplace sheet glass (3/5/6.8mm) / aluminum sheet42EA¥0
D002AGReplace aluminum sheet bathroom/shower room2EA¥0
D002AHRepair/Replace air conditioner port door, hinges, locks, latch set2EA¥0
D002AJReplace kitchen countertops2EA¥0
Mechanical Work
D002AKReplace faucets/faucet diverter26EA¥0
D002ALReplace combination faucet for bathtub2EA¥0
Electrical Work
D002AMInstall/Replace fluorescent-type lighting fixtures34EA¥0
D002ANInstall/Replace interior & exterior incandescent-type lighting fixtures23EA¥0
D002APInstall/Replace lighting fixtures cover or diffuser/bulb protector199EA¥0
TOTAL ESTIMATED AMOUNT FOR CLIN D002¥0
D003Additional Maintenance Work (Unit Price Basis):
Painting:
D003AASemi-gloss Latex w/Surface Preparation1,601,206SF¥0
D003ABSemi-gloss Base Enamel w/Surface Preparation668,630SF¥0
D003ACVarnish and Stain w/Surface Preparation119,027SF¥0
Architectural Repair/Replacement
Floor Work:
D003ADRemove/Install 2mm thick vinyl floor tile including treads and risers6,167SF¥0
D003AEReplace/Install 2mm thick vinyl sheet flooring364SF¥0
D003AFReplace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor)8,371SF¥0
D003AGReplace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden)6,513SF¥0
D003AHReplace non-slip nosing on concrete steps w/ceramic tile (Garden)364SF¥0
D003AJReplace non-slip nosing on stairway w/brass edged plastic nosing (Garden)20SF¥0
D003AKReplace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom80SF¥0
D003ALReplace 6"x 6" quarry tile46SF¥0
D003AMReplace terrazzo floor tile w/new (30 mm thk)2SF¥0
D003ANRepair/Replace concrete floor edge on patio33SF¥0
Floor Maintenance (Wax Finish)
D003APFloor Maintenance (2BR/3BR)33HSG UNIT¥0
D003AQFloor Maintenance (4BR/SOQ/GOQ Units)16HSG UNIT¥0
D003ARPartial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ)619HSG UNIT¥0
Carpet Cleaning
D003ASSteam Clean Carpets (other than SOQ/SEQ/GOQ)325HSG UNIT¥0
D003ATSteam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ)14HSG UNIT¥0
D003AURemove existing wall-to-wall carpet.63SF¥0
D003AVReplace/Install wall-to-wall carpet24,045SY¥0
D003AWRepair/patch of wall-to-wall carpet189SY¥0
Wall & Ceiling Work
D003AXRemove damaged baseboard and replace with new vinyl base2,752LF¥0
D003AYReplace ceiling acoustic tile41SF¥0
D003AZRemove damaged finish lumber and replace with new finish lumber36BF¥0
D003BAReplace ceramic wall or floor tiles (4x4, 6x6 etc.) with new8,108EA¥0
D003BBRemove & replace existing plaster, fiber gypsum wall board with new92SF¥0
D003BCRemove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints1,216SF¥0
D003BDRemove & replace ceiling access door (Garden) w/new aluminum framed door1EA¥0
D003BERemove damaged rough lumber and replace with new (Garden)15BF¥0
D003BFRemove damaged curtain box & replace w/new paint finish curtain box (Garden)1EA¥0
D003BGRemove vinyl wall covering and replace with new wall covering348SF¥0
D003BHRemove vinyl wall covering and paint wall10,115SF¥0
Door & Window Work:
D003BJRemove damaged curtain rails and replace with new steel rails8EA¥0
D003BKMaintenance of Windows & Door Glass 2 BR/3 BR Units542HSG UNIT¥0
D003BLMaintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ74HSG UNIT¥0
D003BMMaintenance of Windows & Door Glass GOQ2HSG UNIT¥0
D003BNReplace aluminum window railing, incl. bolts & hardware (Garden)1EA¥0
D003BPRemove damaged window/door trims & replace with new wood trims1EA¥0
D003BQRepair wooden A/C port door including plywood cover and weather stripping1EA¥0
Cabinet Work
D003BRReplace damaged cabinet bottom and back25SF¥0
D003BSReplace damaged plastic laminated sheets1,589SF¥0
D003BTReplace damaged cabinet shelf12LF¥0
Mechanical Maintenance, Repair & Replacement
D003BURecoat bathtub with ceramic finish236EA¥0
D003BVReplace commode/water closet with new12EA¥0
D003BWReplace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min1EA¥0
D003BXReplace bathroom ceiling exhaust fan 115V5EA¥0
D003BYReplace kitchen range hood with Government-Furnished* hood1EA¥0
D003BZReplace lavatory including faucets, "P" trap, shop valves & brackets22EA¥0
D003CARemove and replace damaged medicine cabinet w/new and built-in lamp19EA¥0
D003CBRemove and replace damaged medicine cabinet with new (no built-in lamp)7EA¥0
D003CCReplace "P" trap for lavatory or sink104EA¥0
D003CDReplace water tank for water closet1EA¥0
D003CEReplace water tank lid1EA¥0
Electric Maintenance, Repair & Replacement:
Conduit & Wiring and Installation Work:
D003CFReplace rigid conduit (19mm, 25mm)1LM¥0
D003CGReplace flexible conduit (17mm)1LM¥0
D003CHReplace wire IV, #12 AWG.1LM¥0
D003CJReplace cable (CVV), 2C #16 AWG1LM¥0
D003CKReplace cable (VVF), 2C & 3C #12 AWG with fittings1LM¥0
Wiring Device Installation Work:
D003CLInstall/Replace switch box with cover1EA¥0
D003CMChange tumbler switch control circuits of the ceiling lights in dining & living rooms1EA¥0
Other Electric Work:
D003CNInspect/Check panel board to include megger test and report1EA¥0
D003CPMeasure ground resistance of the grounding system, & reports1EA¥0
D003CQInstallation of Occupant Name Tag591EA¥0
D003CRInstall Government-furnished Window AC Unit 8,000 BTU1EA¥0
D003CSInstall Government-furnished Window AC Unit 18,000 BTU1EA¥0
D003CTRemove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking119EA¥0
D003CURemove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking3EA¥0
TOTAL ESTIMATED AMOUNT FOR CLIN D003¥0
D004Cleaning Work
D004AAPerform COM Basic Cleaning (2/3 Bedroom Units)381HSG UNIT¥0
D004ABPerform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units)62HSG UNIT¥0
D004ACPerform COM Bathroom Cleaning (2/3 Bedroom Units)381HSG UNIT¥0
D004ADPerform COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units)62HSG UNIT¥0
D004AEPerform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ)442HSG UNIT¥0
D004AFPerform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ)442HSG UNIT¥0
D004AGPerform Full Cleaning GOQs2EA¥0
D004AHPerform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ)32HSG UNIT¥0
D004AJPerform Yard Maintenance (2/3/4 Bedroom Units/SEQ/SOQ)337HSG UNIT¥0
Vacant Units and Local Move Cleaning
D004AKVacant Unit Cleaning with Routine Maintenance (2/3/BR)97HSG UNIT¥0
D004ALVacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ)43HSG UNIT¥0
D004AMVacant Unit Cleaning without Routine Maintenance (2/3/BR)128HSG UNIT¥0
D004ANVacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ)22HSG UNIT¥0
D004APPerform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ)75HSG UNIT¥0
D004AQPerform Local move COM Cleaning (2/3 Bedroom Units)70HSG UNIT¥0
D004ARPerform Local move COM Bathroom Cleaning (2/3 Bedroom Units)78HSG UNIT¥0
D004ASPerform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units)3HSG UNIT¥0
D004ATPerform Local move COM Bathroom Cleaning (4 Bedroom, SEQ/SOQ Units)8HSG UNIT¥0
D004AUPerform Local move COM Cleaning for GOQ1HSG UNIT¥0
TOTAL ESTIMATED AMOUNT FOR CLIN D004¥0
TOTAL ESTIMATED AMOUNT FOR OPTION THREE PERIOD:¥0

&C&"Times New Roman,Bold"&12&UEXHIBIT D, PRICING SCHEDULE &R&"Times New Roman,Regular"RFP No. FA5209-11-R-0001

EXHIBIT E

ITEM NOSUPPLIES/SERVICESEST QUANTITYUNITUNIT PRICEESTIMATED AMOUNT
Option 4: 1 Apr 15 thru 31 Mar 16
E001Perform COM Routine Repair and Replacement:645HSG UNIT¥0
E002Incidental Labor (Reimbursable Materials):
Architectural Work
E002AAReplace/Install blinds and shades600EA¥0
E002ABReplace door locks with new cylinder door locks35EA¥0
E002ACReplace aluminum/wood screen window with new aluminum/metal screen2EA¥0
E002ADReplace sliding screen door with new aluminum/steel frame89EA¥0
E002AEReplace/install door5EA¥0
E002AFReplace sheet glass (3/5/6.8mm) / aluminum sheet42EA¥0
E002AGReplace aluminum sheet bathroom/shower room2EA¥0
E002AHRepair/Replace air conditioner port door, hinges, locks, latch set2EA¥0
E002AJReplace kitchen countertops2EA¥0
Mechanical Work
E002AKReplace faucets/faucet diverter26EA¥0
E002ALReplace combination faucet for bathtub2EA¥0
Electrical Work
E002AMInstall/Replace fluorescent-type lighting fixtures34EA¥0
E002ANInstall/Replace interior & exterior incandescent-type lighting fixtures23EA¥0
E002APInstall/Replace lighting fixtures cover or diffuser/bulb protector199EA¥0
TOTAL ESTIMATED AMOUNT FOR CLIN E002¥0
E003Additional Maintenance Work (Unit Price Basis):
Painting:
E003AASemi-gloss Latex w/Surface Preparation1,601,206SF¥0
E003ABSemi-gloss Base Enamel w/Surface Preparation668,630SF¥0
E003ACVarnish and Stain w/Surface Preparation119,027SF¥0
Architectural Repair/Replacement
Floor Work:
E003ADRemove/Install 2mm thick vinyl floor tile including treads and risers6,167SF¥0
E003AEReplace/Install 2mm thick vinyl sheet flooring364SF¥0
E003AFReplace/Install 2.3mm thick vinyl sheet flooring (includes bathroom floor)8,371SF¥0
E003AGReplace vinyl sheet flooring w/2.0mm thick non-cushioned (Garden)6,513SF¥0
E003AHReplace non-slip nosing on concrete steps w/ceramic tile (Garden)364SF¥0
E003AJReplace non-slip nosing on stairway w/brass edged plastic nosing (Garden)20SF¥0
E003AKReplace damaged ceramic/mosaic floor tile w/new non-slip tiles in bathroom80SF¥0
E003ALReplace 6"x 6" quarry tile46SF¥0
E003AMReplace terrazzo floor tile w/new (30 mm thk)2SF¥0
E003ANRepair/Replace concrete floor edge on patio33SF¥0
Floor Maintenance (Wax Finish)
E003APFloor Maintenance (2BR/3BR)33HSG UNIT¥0
E003AQFloor Maintenance (4BR/SOQ/GOQ Units)16HSG UNIT¥0
E003ARPartial floor maintenance (2/3/4 BR/SOQ/SEQ/GOQ)619HSG UNIT¥0
Carpet Cleaning
E003ASSteam Clean Carpets (other than SOQ/SEQ/GOQ)325HSG UNIT¥0
E003ATSteam Clean Carpets with Partial Floor Maintenance (SOQ/SEQ/GOQ)14HSG UNIT¥0
E003AURemove existing wall-to-wall carpet.63SF¥0
E003AVReplace/Install wall-to-wall carpet24,045SY¥0
E003AWRepair/patch of wall-to-wall carpet189SY¥0
Wall & Ceiling Work
E003AXRemove damaged baseboard and replace with new vinyl base2,752LF¥0
E003AYReplace ceiling acoustic tile41SF¥0
E003AZRemove damaged finish lumber and replace with new finish lumber36BF¥0
E003BAReplace ceramic wall or floor tiles (4x4, 6x6 etc.) with new8,108EA¥0
E003BBRemove & replace existing plaster, fiber gypsum wall board with new92SF¥0
E003BCRemove & replace celotex/plywood/ plaster wall and ceiling with 5/8" gypsum wallboard with tape joints1,216SF¥0
E003BDRemove & replace ceiling access door (Garden) w/new aluminum framed door1EA¥0
E003BERemove damaged rough lumber and replace with new (Garden)15BF¥0
E003BFRemove damaged curtain box & replace w/new paint finish curtain box (Garden)1EA¥0
E003BGRemove vinyl wall covering and replace with new wall covering348SF¥0
E003BHRemove vinyl wall covering and paint wall10,115SF¥0
Door & Window Work:
E003BJRemove damaged curtain rails and replace with new steel rails8EA¥0
E003BKMaintenance of Windows & Door Glass 2 BR/3 BR Units542HSG UNIT¥0
E003BLMaintenance of Windows & Door Glass 4 BR Units/SOQ/SEQ74HSG UNIT¥0
E003BMMaintenance of Windows & Door Glass GOQ2HSG UNIT¥0
E003BNReplace aluminum window railing, incl. bolts & hardware (Garden)1EA¥0
E003BPRemove damaged window/door trims & replace with new wood trims1EA¥0
E003BQRepair wooden A/C port door including plywood cover and weather stripping1EA¥0
Cabinet Work
E003BRReplace damaged cabinet bottom and back25SF¥0
E003BSReplace damaged plastic laminated sheets1,589SF¥0
E003BTReplace damaged cabinet shelf12LF¥0
Mechanical Maintenance, Repair & Replacement
E003BURecoat bathtub with ceramic finish236EA¥0
E003BVReplace commode/water closet with new12EA¥0
E003BWReplace kitchen exhaust fan, 100V & 115V, 10m3/min and 12m3/min1EA¥0
E003BXReplace bathroom ceiling exhaust fan 115V5EA¥0
E003BYReplace kitchen range hood with Government-Furnished* hood1EA¥0
E003BZReplace lavatory including faucets, "P" trap, shop valves & brackets22EA¥0
E003CARemove and replace damaged medicine cabinet w/new and built-in lamp19EA¥0
E003CBRemove and replace damaged medicine cabinet with new (no built-in lamp)7EA¥0
E003CCReplace "P" trap for lavatory or sink104EA¥0
E003CDReplace water tank for water closet1EA¥0
E003CEReplace water tank lid1EA¥0
Electric Maintenance, Repair & Replacement:
Conduit & Wiring and Installation Work:
E003CFReplace rigid conduit (19mm, 25mm)1LM¥0
E003CGReplace flexible conduit (17mm)1LM¥0
E003CHReplace wire IV, #12 AWG.1LM¥0
E003CJReplace cable (CVV), 2C #16 AWG1LM¥0
E003CKReplace cable (VVF), 2C & 3C #12 AWG with fittings1LM¥0
Wiring Device Installation Work:
E003CLInstall/Replace switch box with cover1EA¥0
E003CMChange tumbler switch control circuits of the ceiling lights in dining & living rooms1EA¥0
Other Electric Work:
E003CNInspect/Check panel board to include megger test and report1EA¥0
E003CPMeasure ground resistance of the grounding system, & reports1EA¥0
E003CQInstallation of Occupant Name Tag591EA¥0
E003CRInstall Government-furnished Window AC Unit 8,000 BTU1EA¥0
E003CSInstall Government-furnished Window AC Unit 18,000 BTU1EA¥0
E003CTRemove/dispose of 8,000 BTU AC unit and replace/install with glass, trim and caulking119EA¥0
E003CURemove/dispose of 18,000 BTU AC unit and replace/install with glass, trim and caulking3EA¥0
TOTAL ESTIMATED AMOUNT FOR CLIN E003¥0
E004Cleaning Work
E004AAPerform COM Basic Cleaning (2/3 Bedroom Units)381HSG UNIT¥0
E004ABPerform COM Basic Cleaning (4 Bedroom, SEQ/SOQ Units)62HSG UNIT¥0
E004ACPerform COM Bathroom Cleaning (2/3 Bedroom Units)381HSG UNIT¥0
E004ADPerform COM Bathroom Cleaning(4 Bedroom, SEQ/SOQ Units)62HSG UNIT¥0
E004AEPerform Cleaning Appliances (2/3/4 BR Units/SEQ/SOQ)442HSG UNIT¥0
E004AFPerform COM Cleaning Kitchen Cabinets (2/3/4 BR Units/SE/SOQ)442HSG UNIT¥0
E004AGPerform Full Cleaning GOQs2EA¥0
E004AHPerform Balcony & Patio Cleaning (2/3/4 Bedroom Units/SEQ/SOQ)32HSG UNIT¥0
E004AJPerform Yard Maintenance (2/3/4 Bedroom Units/SEQ/SOQ)337HSG UNIT¥0
Vacant Units and Local Move Cleaning
E004AKVacant Unit Cleaning with Routine Maintenance (2/3/BR)97HSG UNIT¥0
E004ALVacant Unit Cleaning with Routine Maintenance (4BR/SEQ/SOQ)43HSG UNIT¥0
E004AMVacant Unit Cleaning without Routine Maintenance (2/3/BR)128HSG UNIT¥0
E004ANVacant Unit Cleaning without Routine Maintenance (4BR/SEQ/SOQ)22HSG UNIT¥0
E004APPerform Cleaning Appliances (2/3/4 Bedroom Units/SEQ/SOQ)75HSG UNIT¥0
E004AQPerform Local move COM Cleaning (2/3 Bedroom Units)70HSG UNIT¥0
E004ARPerform Local move COM Bathroom Cleaning (2/3 Bedroom Units)78HSG UNIT¥0
E004ASPerform Local move COM Cleaning (4 Bedroom, SEQ/SOQ Units)3HSG UNIT¥0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .