7. Schedule of Material Submittals W10701.xls

XLS spreadsheet 52 KB Posted

Attached to
Project No. W-10-701, Replace Electrical Security Lighting System (Phase 1 of 3) at Kawakami Ammunition Depot, Hiroshima-ken, Japan
Solicitation number
FA5209-10-R-0020
Issued by

About this file

Schedule of Material Submittals

View the file

Other files

File Type Posted
Amendment 0001 FA520910R0020.pdf PDF
4. Atch 4 —
1. DD 1707 Attachment.pdf PDF
2. SF 1442 —
5. Atch 5 —
3. Atch 1 Specs W10701.pdf PDF
6. OF17.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

submittal

SCHEDULE OF MATERIAL SUBMITTALSPROJECT NUMBERPROJECT TITLESOLICITATION/CONTRACT NO.
W-10-701Replace Electrical Security LightingFA5209-10-R-0020
TO BE COMPLETED BY PROJECT ENGINNERTO BE COMPLETED BY CONTRACT ADMINISTRATOR
WORK PROCEDUREPLANSCATALOG DATASHOP DRAWINGSSAMPLES /COLOR SELECTIONSINSTALLATIONINSTRUCTIONSOPERAT. / MAINT.INSTRUCTIONSCERTIFICATIONS /LICENSESCALCULATON SHEETSTEST REPORTSOTHERSDATECONTRAC-
ITEM OR DESCRIPTIONREQUIREDDATEDATE TORETURNFOLLOW-UPCONTRACTORTOR RE-FINALREMARKS
OF ITEM, CONTRACTSUBMISSIONRECEIVEDCIVILSUSPENSENOTIFIEDSUBMIT-APPROVAL
REFERENCE, TYPE OFDATEIN CONT-ENGINEER-DATETAL
SUBMITTALRACTINGINGDIS-
APPROVEDAPPROVED
1SECTION 01 11 00XA or E
1.9.2 Safety *
2SECTION 01 11 00XA or E
1.9.3 Environmental **
3SECTION 01 11 01XA or E
SSHO*
4SECTION 01 11 00XA
2.1 Memo for HM Usage
5SECTION 01 11 00XD
1.15.1 As Built Drawing
6SECTION 01 74 19XA
1.6 Waste Managt Plan**
7SECTION 01 74 19XD
1.7 Manifest
8SECTION 02 41 00XA or E
1.8 Dem / Deconst Plan
9SECTION 26 12 19XA
2.2 Transformers
10SECTION 26 12 19XD
3.4.1 Acceptance Checks&Tests
11SECTION 26 12 19XD
1.4.1 O&M Data
12SECTION 26 27 26XB
1.4 Fabrication Drawings
13SECTION 26 27 26XB
2.5 Panelboards
14SECTION 26 27 26XA
2.1 Conduit and Fittings
15SECTION 26 27 26XA
2.2 Wire and Cable
16SECTION 26 27 26XA
2.2.2 Insulators
17SECTION 26 27 26XA
2.3 Hardware, Pins, and Racks
18SECTION 26 27 26XA
2.7 Grounding and Lightening Protection System
19SECTION 26 27 26XA
2.10 Warning Marks
20SECTION 26 27 26XA
2.9 Arms
21SECTION 26 27 26XA
2.11 Handhole
22SECTION 26 27 26XD
3.8 Continuity Test
23SECTION 26 27 26XD
3.8 Grounding System Test
24SECTION 26 27 26XA
1.5 MSDS
25SECTION 26 56 00XA
2.2 Luminaries
26SECTION 26 56 00XD
3.2 Operating test
27SECTION 31 23 00XA
1.5.1 Shoring and Sheeting Plan
28SECTION 31 23 00XA
3.9.1.1 Density Tests
29SECTION 32 11 23XA
1.6 Plant, Equipment, and Tools
30SECTION 32 11 23XA
1.4.1.1 Sieve Analysis
31SECTION 32 11 23XA
1.4.1.2 Liquid Limit and Plasticity Index
32SECTION 32 11 23XA
1.4.1.3 Wear Test
33SECTION 32 11 23XA
1.4.1.4 Compaction Test
34SECTION 32 11 23XD
1.4.1.5 Thickness Test
35SECTION 32 12 16XA
2.4 Mix Design
36SECTION 32 12 16XA
1.6 Calibration
37SECTION 32 12 16XA
2.1 Aggregates
38SECTION 32 12 16XA
2.2 Asphalt Cement Binder
39SECTION 32 12 16XA
2.3 Prime Coat and Tack Coat
40SECTION 32 92 23XA
2.1 Sods
41SECTION 32 92 23XA
2.4 Fertilizer
42
43
44
45
46
47
48
49
50
51
52

&LSUBMISSION DATE:

A. W/in 15days after AWD / NTP whichever later B. Prior to commencement of applicable work C. W/in 5days after commencement of appl. work D. Prior to compl. of Const. Pd.

E. Consult w/ CI

* Safety Office Only ** Env. Div Only

File details come from the government source that posted it. Updated .