Performance Work Statement Summary
This is a Performance Work Statement (PWS) for operations and maintenance of the Robert E. Kamosa Transmitting Station Facilities in Tinian, issued by Andersen Air Force Base, Guam (356 ETSG/CONS) with an effective date of 18 September 2026. The contractor must provide comprehensive facility maintenance services including labor, supervision, management, tools, materials, equipment, and transportation necessary to sustain operations and ensure safety and health of operational personnel. Services are evaluated based on results rather than methods, with performance thresholds defining minimally acceptable service levels. The government retains inspection rights, and during the initial 30 days, two additional errors per work item are permitted to identify phase-in problems.
The PWS requires the contractor to perform maintenance, repair, alteration, demolition, and minor construction across four primary categories: Building and Structures (interior/exterior finishes, roofing, foundations, tanks, POL systems, pipelines, water systems, towers); Building Systems (HVAC, fire protection, intrusion detection, compressed air, electrical, grounding, generators, UPS, exhaust systems); Miscellaneous (signs, fences, locksmith, drainage, monuments, flagpoles, unpaved roads); and Road and Paved Surfaces (striping, curbs, sidewalks, parking lots, drainage). Key programs include a Preventive Maintenance (PM) Program, Integrated Maintenance Program (IMP) with $250 per occurrence liability limits, service orders (emergency within 1 hour, urgent within 5 working days, routine within 30 calendar days) with $2,500 liability limits, and specialized services for backflow prevention devices, compressed air systems, fire protection systems, HVAC, lighting, POL facilities, overhead doors, UPS systems, septic tanks, and towers. Personnel must meet specific certification requirements including NICET Level III for fire protection management and appropriate licensing for boilers, backflow devices, and electrical work. Normal operating hours are Monday to Saturday, 0700–1900, excluding federal holidays, though emergency services are required 24/7. The contractor must submit a Quality Control Plan within 10 working days of award and monthly reports on PM schedules, service orders, and IMP status. Invoicing occurs through the Wide Area Work Flow (WAWF) system with government certification by the Contracting Officer's Representative.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
OPERATIONS AND MAINTENANCE OF ROBERT E. KAMOSA
TRANSMITTING STATION FACILITIES IN TINIAN SERVICES
Contract No. XXXXXXXX
18 September 2026
ANDERSEN AIR FORCE BASE, GUAM
356 ETSG/CONS
TABLE OF CONTENTS
1.0 Introduction
1.1. Scope
2.0 Service Summary
2.1. Performance Evaluation
2.2. Quality Control
2.3. Quality Assurance
2.4. Surveillance Methods
2.5. Periodic Progress Meetings
3.0 Service Requirements
3.1. Facility Maintenance Requirements
4.0 General Information
4.1. Hours of Operations
4.2. Recognized Holidays
4.3. Performance of Service During Crisis or Heightened Security
4.4. Submission of Invoice
5.0 Appendices ............................................................................................................................ XX
1.1. Scope. The Contractor shall provide non-personal services, to include all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering, and other items and services necessary to ensure facility maintenance requirements are performed at the Robert E. Kamosa Transmitting Station Facilities in
Tinian. Services are intended to sustain operations and maintenance of existing facilities and ensure the safety and health of operational personnel at the Robert E. Kamosa
Transmitting Station Facilities in Tinian. Area maps and workloads depicting the service described in this PWS are identified in the Appendices. The Contractor’s performance will be based on the Contracting Officer’s Representative (COR) and Contracting
Officer’s (CO) evaluation of the results required by the Service Summary (SS) and not the method of performance. The evaluation of results will be based on COR surveillance, tenant satisfaction, and customer complaints. The results of the evaluations will be the determining factor for the success or failure of this contract. The Contractor shall comply with applicable federal, regional, state, and local laws and commercial standards.
1.2. Contractor Employees. The Contractor shall not employ persons for work on this contract if such employee is identified to the Contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population.
2.0 Service Summary. The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services
Summary (SS) and the Contractor’s Quality Control (QC) plan provide information on contract requirements, the expected level of Contractor performance and the expected method of government validation and confirmation of the services provided. These thresholds are critical to mission success. Procedures as set forth in the RFO Clause 52.212-4(a), Contract Terms and
Conditions – Commercial Items, Inspection/Acceptance will be used to remedy all deficiencies.
During the initial 30 days of the contract, two additional errors on each work shall be allowed to identify normal phase-in problems. The absence of any contract requirements from the SS shall not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Government has the right to inspect all services required in the contract.
2.1. Performance Evaluation. The purpose of the SS is to define performance evaluation and payment procedures. The Performance Objective (column 1) describes what the Government will survey. Performance of a service will be evaluated to determine whether or not it meets the
Performance Threshold (PT) of the contract. When the PT is exceeded, the COR will document the file with a Corrective Action Report (CAR) ora Performance Assessment Report (PAR) and provide the Contracting Officer with a DoD Form 2772 (Contract Discrepancy Report (CDR)) for issuance to the Contractor.
2.1.1. The Government will periodically evaluate the Contractor’s performance by appointing a representative(s) to monitor performance to ensure services are received. The Government representative will evaluate the Contractor’s performance through inspections of reports and
Contractor services documentation. The Government may inspect each task as completed or increase the number of quality assurance inspections if deemed appropriate because of repeated failures or because of repeated customer complaints. Likewise, the Contractor may decrease the number of quality assurance inspections if performance dictates. The government COR will make final determination of the validity of customer complaint(s).
2.1.2. If any of the services do not conform to contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the Government may:
a) Require the Contractor to take necessary actions to ensure that future performance conforms to contracts requirements; and
b) Reduce the contract prices to reflect the reduced value of services performed.
2.2. Quality Control. The Contractor shall develop and maintain a quality control program to ensure services are performed in accordance with this contract and PWS. The Contractor shall develop and implement procedures to identify and prevent non-conformance and continual repeat or defective service. A written Quality Control Plan (QCP) shall be submitted to the CO and COR for review and feedback. The plan shall be submitted no later than 10 working days after award. The plan shall specifically address the Contractor’s strategy to provide quality workmanship, continual process improvement, and for correcting deficiencies as required.
2.3. Quality Assurance. The Government shall inspect and evaluate the Contractor’s performance to ensure services are received in accordance with requirements set forth in this contract. The COR shall inspect by watching actual task performance, physically checking attribute of the completed task , investigating customer complaints, or otherwise inspecting the task or its results to determine whether performance meets the standards contained in this PWS.
The COR will record surveillance results. Results of the surveillance then become official Air
Force record the Contractor’s performance. When a performance threshold has not been met or
Contractor performance has not been accomplished, the COR will initiate a Corrective Action
Report (CAR) or a Performance Assessment Report (PAR) and provide the Contracting Officer a
Contract Discrepancy Report (CDR) for issuance to the Contractor. The Contractor shall respond to the CDR in accordance with instructions provided and return it to the Contracting Officer no later than the suspense given by the CO.
2.4. Surveillance Methods
2.4.2. Periodic Surveillances. This method requires the COR to employ a spot check style of evaluation based on the Contractor’s schedule. Periodic surveillance will be conducted on a scheduled basis (daily, weekly, monthly, quarterly, semi-annual or annually) and may be adjusted, based on quality trends. Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service after notification by the COR.
2.5.1. Government Rights. All reports, surveys, analysis, photographs, notes, tapes, transcripts of interviews, and copies of documents collected during this contract are the property of the
Government and shall be delivered to the COR and copies will not be retained by the Contractor.
The Contractor shall agree to not assert any rights and not to establish any claims with respect thereto. The Contractor shall be solely responsible for compliance with all copyright laws and hold and save the United States harmless of any violation thereof.
3.0 Service Requirements.
3.1. Facility Maintenance Requirements. The intent of Facility investment is to specify the requirements for Sustainment, Restoration, and Modernization (SRM) sub-functions. The
Facility Maintenance requirements primarily consist of infrastructure sustainment and minimal restoration and modernization work. Sustainment is the maintenance and repair necessary to keep an inventory of facilities and other assets in good working order. Restoration and modernization normally consists of major rehabilitation and capital improvements that’s accomplished through other Air Force programs. Some major repair, minor construction and stand-alone demolition may be accomplished as part of Facility Maintenance. The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required to provide facility maintenance services. The Contractor shall perform maintenance, repair, alteration, demolition, and minor construction for the following:
a) Building and Structures (interior and exterior finishes, roofing, foundation, structural components , tanks, POL system, pipelines, non-potable water systems, and towers),
b) Building Systems (HVAC, fire protection, intrusion detection systems, compressed air systems, non-potable water including backflow prevention devices, wastewater, electrical, lightning arrestors and grounding devices, auxiliary generator systems, uninterruptible power systems, exhaust hoods and ducts),
c) Miscellaneous (Signs, fences, locksmith, drainage ditches, monuments, flag poles, unpaved roads)
d) Road and Paved Surfaces (Striping, curbs, sidewalks, parking lots, drainage systems)
3.1.1. Certification, Training, and Licensing. Personnel inspecting, witnessing tests, preparing reports, and issuing certificates for boilers and UPVs shall be qualified per UFC 3-
430-07 and possess a current state and local licensing and certification requirements.
3.1.1.1. Backflow Prevention Personnel. Personnel repairing, inspecting, testing, and certifying, backflow prevention devices shall be certified per DAFMAN 32-1067 (Water and
Fuel Systems) and supported by AF Forms 845, 848, and 843.
3.1.1.2. Fire Protection Personnel. Fire Protection services shall be managed by a qualified individual who is NICET level III certified in fire alarm or NICET level III certified in special hazards systems. The Fire Protection Services Manager shall provide daily supervision over all Fire Protection Services. The NICET level III certified Fire Protection Services
Manager shall be on-site during the Government's regular working hours and shall be available on-site within one hour after the Government's regular working hours.
3.1.1.3. Electrical Personnel. Personnel working with or on electrical or electronic equipment shall be trained and certified per DAFMAN 32-1082 (Electrical Exterior Facilities) and DAFMAN 32-1065 (Grounding Systems). Personnel performing work on transformers shall be knowledgeable of proper procedures for handling and disposing of insulating fluid containing polychlorinated biphenyls (PCBs).
3.1.1.4. HAZMAT Personnel. Personnel performing work in HAZMAT/HAZWASTE shall complete the HAZMAT/HAZWASTE handling course or have a minimum of one year of experience working with HAZMAT/HAZWASTE.
3.1.1.5. Maintenance Personnel. All maintenance trade personnel certifying or inspecting repair or maintenance work that does not require an inspector certified by a governing directive shall be qualified at the journeyman level.
3.1.2. Workmanship and Material Standards. The Contractor shall be responsible for maintaining all facilities, systems, and equipment, identified in this technical sub-annex, to a standard that prevents deterioration beyond that which results from normal wear and tear and corrects deficiencies in a timely manner to assure full life expectancy of the facilities, systems, and equipment. Best commercial practices shall be applied in the performance of work. All work shall be completed per approved and accepted industry and equipment manufacturers’ standards and shall comply with building and safety codes, applicable activity, local, state, and federal regulations, and other technical requirements.
3.1.3. Historical Preservation. Buildings and facilities designated as historical sites shall be maintained in accordance with Federal, state, and local historical policies and regulations.
3.1.4. Recurring Work - The Contractor shall perform maintenance, repair, alteration, demolition, and minor construction on Building and Structures, Building Systems, Miscellaneous, and Roads and Paved Surfaces, as specified in the PWS. The Contractor shall develop and implement a Service Order, Preventative Maintenance Program, Integrated
Maintenance Program, Inspection, Testing and Certification Program, and Other Recurring
Service Programs to maintain and repair as specified in the PWS. The Contractor shall maintain all maintenance, repair, and alteration data and warranty records in the technical library. Facility descriptions will be provided upon initial assessment by the Contractor and updated as changes occur.
3.1.5. Service Orders - The Contractor shall perform service orders in a timely manner to ensure requested work is complete in accordance with specified standards. Service orders will be ordered to accomplish any work identified within the entire boundary of the installation. The
Government may combine multiple requirements for the same facility, system, ground structure, or other asset into one service order. The Government will categorize each service order as emergency, urgent, or routine. The categorization may be based on any Government requirement and the contract completion times; for example, a high-interest item may be categorized as an emergency whereas a storm-damage repair may be categorized as routine. The Contractor shall schedule service order work in a way that minimizes disruptions to Government operations.
Service orders will include a wide variety of work. The Contractor has full responsibility for any work up to the service order limit of liability of $2,500 in direct labor and direct material cost per service order. The Contractor shall notify the CO upon identification that the service order will exceed the specified limits of liability. The Government may issue an order under the non-recurring work provisions of the contract for the portion of direct labor and direct material cost that exceeds the service order limits of liability. If a non-recurring work order is issued for the portion of work exceeding the specified service order limits of liability, the Government will only pay for the portion of direct labor and direct material and exceed the service order limits.
Examples of work exceeding the Service Order limits of liability: If a service order requires value $100 greater than the limit of liability specified above $2,500 in direct labor and direct material cost, the Government may issue an order in accordance with the Non-Recurring Work portion of the contract for the $100 in direct labor and direct material cost that exceeded the
Service Order limit of liability. The Contractor may invoice for completed service orders. The
Contractor shall not invoice for incomplete service orders and service orders will not issued. A modification will be processed at the end of each period of performance to deduct for service orders not issued and incomplete service orders.
The Contractor shall submit a monthly summary of completed service orders.
3.1.6. Emergency Service Orders - The Contractor shall perform emergency service orders in a timely manner to ensure requested work is complete in accordance with specified standards.
The Contractor shall perform emergency service orders 24 hours a day, seven days a week throughout the contract period. The Contractor shall respond to emergency service orders with the appropriate service personnel and equipment to commence work immediately.
3.1.7. Urgent Service Orders - The Contractor shall perform urgent service orders in a timely manner to ensure requested work is complete in accordance with specified standards. The
Contractor shall perform urgent service orders without extended delay.
3.1.8. Routine Service Orders - The Contractor shall perform routine service orders in a timely manner to ensure requested work is complete in accordance with specified standards.
Performance of routine service orders is not required outside of Government regular working hours.
3.1.9 Preventive Maintenance (PM) Program - The Contractor shall develop and implement a PM program for facilities, equipment, systems, structures, and other assets to ensure proper operation, minimize breakdowns, and maximize useful life. The PM Service Matrix identifies the systems within each facility that are required to be included in the Contractor’s PM Program.
The Contractor shall develop and submit a PM program. At minimum, the PM program shall include:
- PM management and technical approach
- Procedures to evaluate equipment reliability and corrective actions
- Job plans identifying each PM task
- Qualification of the maintenance personnel.
The Contractor is fully responsible for and shall perform any incidental repairs, including replacement, discovered during scheduled maintenance work up to a total of $250 per occurrence in direct labor and direct material cost under the recurring work portion of the contract. A service order will not be issued for accomplishment of incidental repairs that are within the PM limit of liability. Notification of repair work exceeding the incidental repairs limit shall be submitted to the CO within 24 hours of identification. The Government may issue service orders or non-recurring work for repairs exceeding the incidental repair limits of liability.
If non-recurring work is issued for repairs exceeding the incidental repair limits of liability, the
Government will only pay for the portion of direct labor and/or direct material that exceeds the specified limits of liability. Example: If an individual occurrence of incidental repair requires
$250 in direct labor and/or direct material cost, the Government may issue a service order or non-recurring work in accordance with the non-recurring work provisions of the contract for the
$50 in direct labor and/or direct material cost that exceeds the specified incidental repair limit of liability. The Contractor shall not use breakdown maintenance as part of the PM program. The
PM program shall provide an economical approach to accomplish the manufacturers’ recommended maintenance in accordance with OEM standards; maintenance required to satisfy equipment warranties; and maintenance required to keep facilities, ground structures, personal property equipment, and installed equipment and systems in normal working condition.
Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program. Adjustments and modification to the
Contractor’s PM program shall be at no additional cost to the Government. The Contractor shall submit a monthly PM work schedule per. ICAP requirements for the condition assessment of dynamic equipment are specified in the Facilities Management Playbook and DAFMAN 32-
1084 Facility Requirements Standards.
3.1.10. Backflow Prevention Devices - The Contractor shall perform PM and repair on backflow prevention devices to ensure proper operation, minimize breakdowns, and maximize useful life. The Contractor shall maintain and repair backflow prevention devices to minimize breakdowns and maximize useful life. The Contractor shall inspect, test, and certify backflow prevention devices to ensure they are safe and fully functional.
3.1.11. Compressed Air Systems - The Contractor shall perform PM and repair on compressed air systems to ensure proper operation, minimize breakdowns, and maximize useful life. The
Contractor shall maintain compressed air systems in accordance with UFC 3-420-02.
3.1.12. Fire Protection Systems - The Contractor shall perform preventive maintenance (PM), inspections, testing, and repairs of fire protection systems to ensure proper operation, minimize breakdowns, and maximize system life.. All maintenance activities shall be performed in accordance with UFC 3-601-02, and all repairs shall meet or exceed manufacturer recommendations and applicable NFPA codes and standards. The Contractor shall notify facility occupants prior to conducting maintenance, inspection, or testing of fire suppression systems.
3.1.13. HVAC and Refrigeration Systems - The Contractor shall perform preventive maintenance (PM) and repairs on HVAC and refrigeration systems to ensure proper operation, minimize breakdowns, and maximize system life. Maintenance shall include all system equipment, components, monitoring and control systems, software applications, computers, workstations, communication equipment, printers, and implementation of future software versions at no additional cost to the Government. Temperature settings shall be maintained in accordance with UFC 3-410-01. The Contractor shall capture and recycle all ozone-depleting refrigerants and shall not vent refrigerants into the environment, complying with all applicable
Federal, state, and local environmental regulations.
3.1.14. Interior and Exterior Lighting Systems - The Contractor shall perform PM and repair on interior and exterior lighting systems to ensure proper operation, minimize breakdowns, and maximize useful life.. The Contractor shall develop and implement a PM program to inspect, clean, re-lamp, and make all necessary repairs to interior and exterior lighting systems. The
Contractor shall maintain lightning arresting and grounding systems in accordance with NFPA
780, UFC 3-520-01 Interior Electrical Systems and UFGS 26 05 26.00 40 Grounding and
Bonding for Electrical Systems.
3.1.15. Emergency Eye Wash and Showers - The Contractor shall perform PM and repair on emergency eye wash and showers to ensure proper operation, minimize breakdowns, and maximize useful life.
3.1.16. POL System Facilities and Distribution Systems - The Contractor shall perform PM and repair on POL system facilities and distribution systems to ensure proper operation, minimize breakdowns, and maximize useful life. Description of POL system facilities and distribution systems is provided in UFC 3-460-01. The Contractor shall maintain POL system facilities and distribution systems in accordance with NAVSUP P-558 and UFS 3-460-01
Petroleum Fuel Facilities.
3.1.17. Overhead Doors - The Contractor shall maintain overhead doors in accordance with manufacturers’ recommended procedures and OEM standards. Overhead doors include roll-up, vertical fold-up, sliding and accordion doors
3.1.18. Uninterruptible Power Supply (UPS) - The Contractor shall perform PM and repair on
Uninterruptible Power Supply (UPS) to ensure proper operation, minimize breakdowns, and maximize useful life.. The Contractor shall maintain UPS systems in accordance with OEM recommended procedures and standards.
3.1.19. Integrated Maintenance Program (IMP) - The Contractor shall develop and implement an IMP program for facilities, equipment, systems, structures, and other assets to ensure they are safe, fully functional, and operational. The IMP Service Matrix identifies the systems within each facility that are required to be included in the Contractor’s IMP program. The Contractor shall develop and submit an IMP. The IMP program shall include:
- IMP management and technical approach
- Procedures to evaluate equipment reliability and identify corrective actions.
- Job plans tailored to the OEM technical documentation.
- Qualification requirements of the maintenance personnel.
The IMP shall include the Contractor’s approach for integrated maintenance, including maintenance and inspection tasks, schedules for planned work accomplishment, plan for minimizing occurrence of repair and downtime, process for the identification of the need for repairs, and the process for scheduling and completing repair work.
As part of the IMP, the Contractor has full responsibility for any individual occurrence of repair, including replacement, up to and including $250 in direct labor and direct material cost for each piece of equipment per incident. The Government will only pay for the portion of direct labor and/or direct material that exceeds the specified limits of liability. The Contractor shall notify the CO upon identification that the repair will exceed the liability limit listed above. If the estimated cost of the repair exceeds the IMP liability limit, the Government may order the work under the non-recurring work provisions of this contract; however, the Government will only be liable for the direct labor and direct material cost exceeding the IMP liability limit. Example: If an individual occurrence of repair requires $350 in direct labor and/or direct material cost, the
Government may issue a task order in accordance with the non-recurring work portion of the contract for the $100 in direct labor and/or direct material cost that exceeds the IMP limit of liability. The Contractor shall not use breakdown maintenance as part of the IMP program. The
Contractor shall perform all repairs, whether identified as part of their routine IMP accomplishment, QC inspections, or notification from the Government that a breakdown or malfunction has occurred. If the Government identifies a problem or a need for repair, the
Government will contact the Contractor’s work reception desk. Notification of a problem or need for repair of equipment and systems maintained under IMP is not a service order under
Annex 1502000 Facility Maintenance document Item 3.1. The Contractor shall maintain mechanical rooms that house IMP equipment in a clean and safe condition including re-lamping.
The Contractor shall submit a monthly IMP schedule and IMP maintenance and repair status report. Informational Note: Typically, Condition Assessments are performed on an annual basis during the most invasive PM circumstances and when components are replaced.
3.1.20. Other Recurring Services Program - The Contractor shall develop and implement other recurring services program for facilities, equipment, systems, structures, and other assets to ensure proper operation, to minimize breakdowns, and to maximize useful life. Other recurring services include, but not limited to grease traps, and exhaust hoods and ducts. The Contractor shall submit an Other Recurring Services Program Summary Report.
3.1.21. Septic Tank - The Contractor shall service, inspect, maintain, and repair septic tanks and associated components to ensure they remain clean, sanitary, safe, and fully operational.. The
Contractor shall perform preventive maintenance and repairs to minimize breakdowns and maximize system life. The Contractor shall inspect septic systems as necessary to verify proper functionality, identify deficiencies, and ensure compliance with applicable environmental, health, and safety requirements.
3.1.22. Towers - The Contractor shall service, inspect, maintain, and repair towers and associated equipment to ensure safe, reliable, and continuous operation. The Contractor shall perform preventive maintenance and repairs to minimize breakdowns and maximize useful life.
The Contractor shall inspect and test tower systems and components as necessary to verify structural integrity, operational readiness, and compliance with applicable safety and regulatory requirements.
3.1.23. Facility Maintenance Performance Objectives.
Title Performance
Objective
Performance Standard
Recurring Work 3.1.4 Work accomplished in accordance with the approved maintenance programs and
Objective
Performance Standard schedules. No more than one deficiency per month.
Service Orders 3.1.5 Service orders completed within required response and completion times. No more than one deficiency per month
Emergency Service Orders 3.1.6 Emergency service orders respond within one hour of receipt of call.
Urgent Service Orders 3.1.7 Urgent service orders are complete within five working days.
Routine Service Orders 3.1.8 Routine service orders are complete within
30 calendar days.
Preventive Maintenance (PM)
Program
3.1.9 PM schedule submitted timely. Required
PMs completed within scheduled intervals.
Backflow Prevention Devices 3.1.10 Devices inspected, tested, certified, and fully operational. No missed required inspections or certifications.
Compressed Air Systems 3.1.12 Systems maintained fully operational.
Fire Protection Systems 3.1.13 Inspection, testing, and maintenance completed as scheduled. No overdue inspections or tests.
HVAC and Refrigeration
Systems
3.1.14 Systems maintained operational and within
required temperature parameters.
Performance Standard
Interior and Exterior Lighting
Systems
3.1.15 Lighting systems maintained operational
Lightning Arresting and
Grounding Systems
3.1.15 Lighting systems maintained operational
Emergency Eye Wash and
Showers
3.1.16 Units maintained fully functional and
compliant with inspection requirements.
POL System Facilities and
Distribution Systems
3.1.17 No spills or discharge to environment due to
missed or improper maintenance.
Overhead Doors 3.1.18 Doors operate safely and as designed.
Uninterruptible Power Supply
(UPS)
3.1.19 UPS systems maintained operational and
serviced in accordance with OEM requirements.
Integrated Maintenance
Program (IMP)
3.1.20 When a problem or a need for repair is
identified, the Contractor shall respond within two hours and complete the repair within 48 hours.
Other Recurring Services
Program
3.1.21 Other recurring services accomplished in
accordance with the Contractor's program and work schedule.
Services performed in accordance with manufacturers’ recommended procedures and OEM standards.
Performance Standard
Septic Tank 3.1.22 Systems and equipment are fully functional and operable condition in accordance with manufacturer’s recommendations and specifications.
Towers 3.1.23 Systems and equipment are fully functional and operable condition in accordance with manufacturer’s recommendations and specifications.
4.0. General Information.
4.1. Hours of Operations. The normal hours of operation will be Monday to Saturday, 0700-
1900. If services are to be performed outside the normal hours of operation, the Contracting
Officer and COR shall coordinate with the contractor no later than one week prior to the scheduled event.
4.2. Recognized Holidays. The hours of operation will not be normally manned on the following federal holidays:
a) New Year’s Day – 1 January
b) Martin Luther King Day - 3rd Monday in January
c) Washington’s Birthday - 3rd Monday in February
d) Memorial Day - last Monday in May
e) Juneteenth - 19 June
f) Independence Day - 4 July
g) Labor Day - 1st Monday in September
h) Columbus Day - 2nd Monday in October
i) Veteran’s Day - 11 November
j) Thanksgiving Day - 4th Thursday in November
k) Christmas Day - 25 December
4.2.1. If a holiday falls on Saturday, the preceding Friday shall be observed. If a holiday falls on a Sunday, the following Monday shall be observed. If a holiday falls on a scheduled service day, the contractor shall be responsible for rescheduling services for the first day following the holiday observance.
4.3. Performance of Services During Crisis or Heightened Security. All tasks and services outlined within this PWS are required during a crisis as identified by the COR. These services shall be required until the crisis has been abated.
4.4. Submission of Invoice. The Contractor shall submit an original invoice within Wide
Area Work Flow (WAWF). Certification of services is performed by the COR via the WAWF
System. At the end of each billing period, the service provider inputs invoice information in the
WAWF System. WAWF automatically notifies the appropriate COR via email of a pending invoice. The COR accesses WAWF and verifies accuracy of service provider’s data. If data is correct, the COR approves the invoice and payment is conducted by the Defense Finance
Accounting System (DFAS). If the COR encounters errors in service provider’s invoice, the
COR consults with the on-site manager to mutually rectify the data. If the service provider disagrees with the COR, the issue is forwarded to the CO for resolution.