About this file

This performance work statement outlines the preventative maintenance and repair services required for 270/480VDC power units and service pits located at Eielson Air Force Base in Alaska. The contractor shall perform quarterly preventative maintenance inspections and annual inspections of the power units and service pits in accordance with manufacturer recommendations and checklists provided. The contractor must also be available for routine and emergency repair service calls, responding within 4 hours for routine calls and 2 hours for emergency calls. The contractor will be responsible for supplying all labor, equipment, and parts required to perform the inspections and repairs. The contract will have a base year with options to extend for additional years. Questions regarding this solicitation are due by May 21, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to VDC Power Maintenance Services, newest first.
File Type Posted
AMENDMENT FA500420B00100001.pdf PDF
Attch 1 - Performance Work Statement1.pdf PDF
Attch 2 - WD 2015-5683 Rev 9.pdf PDF
Attch 3 - Bid Schedule.xlsx XLSX spreadsheet
Solicitation - FA500420B0010.pdf PDF
Attch 4 - Bid Preparation Instructions Addenda.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

270/480VDC Power Units and Service Pits

EIELSON AFB ALASKA

MAY 2020

1. DESCRIPTION OF SERVICES: The Contractor shall provide all management, tools, supplies, equipment, transportation, man-lifts, and labor necessary to perform preventative maintenance, inspect, and service the VDC Units and associated service pits in a manner that will ensure dependable and safe operation of the equipment identified in this contract at Eielson AFB, AK. The

Contractor shall be fully responsible for compliance with all base, local, state, national, and federal environmental/occupational safety laws, rules and regulations as referenced to include, but not limited to EPA, NFPA, NEC, & OSHA.

2. PREVENTIVE MAINTENANCE SERVICES: The Contractor shall perform preventative maintenance, inspect, and service the

VDC Units on a quarterly basis. The inspections will be performed over a calendar year and consist of three quarterly inspections and one annual inspection in accordance with the attached schedule. The Contractor shall follow the manufacturer(s) recommendations listed in the O&M manuals. Any item(s) discovered defective listed under the quarterly or annual maintenance schedules will be communicated to the Contracting Officer Representative (COR). A cost estimate (parts cost, additional labor cost, and any applicable expenses) will be submitted to the COR for approval through the Contracting Officer (CO) prior to repair or replacement. The Contractor shall prepare and submit a written report within 5 days of completion of each scheduled preventative maintenance service. The report shall include hangar number, identification of systems, location within building, maintenance work performed, repairs needed (with detailed quote), date of inspection, inspector, and overall condition of each piece of equipment under this contract. All work performed under this contract shall be inspected and accepted by the COR.

3. REPAIR SERVICE CALLS: Contractor shall have a point of contact available during Eielson AFB normal business operations with an initial call back response time not to exceed 2 hours after government notification of a repair service call. Repair service calls shall only be accepted by the COR, however, initiation of the service call shall be approved by the CO. The contractor shall complete repair as needed for repairs on listed equipment upon approval. This will include all maintenance not associated with the scheduled quarterly and annual preventative maintenance schedules and any emergency repairs required to put equipment back into normal operation. Only new parts or parts of equal quality that is specified by the manufacturer(s) will be utilized for repairs. Labor charges will be billed for repair and services for emergency or routine service calls at an hourly rate agreed to in the contract.

Contractor will submit a bid of estimated labor charges to the Contracting Officer for approval. Only approved bids will be reimbursed. Labor hours shall start and stop at Eielson AFB only. A trip charge is defined as the cost of transportation from the

Contractor’s place of business to Eielson AFB and return. Trip charges shall be for service calls only (this cost is included in PM costs). Contractor shall not charge for additional labor time during travel. The acceptance of the proposed cost for work will require a written or electronic (via e-mail) estimate submitted to COR and/or Contracting Officer (CO) for approval. At the conclusion of the maintenance and repair service, the contractor will submit an itemized report to the COR within three (3) days. The report shall include hangar number, identification of systems, location within building, maintenance work performed, detailed cost of service, date of service, inspector, and overall condition of each piece of equipment under this contract.

3.1 Routine Repair Service Calls: Performed on an as required basis with response time not to exceed 4 hours Monday through

Friday, and not to exceed 8 hours on weekends or holidays. A detailed estimate will be provided within 72 hours. A cost estimate (part cost, additional labor cost, and any applicable expenses) will be submitted to the COR and CO for approval prior to making any repairs.

3.2 Emergency Service Calls: Emergency calls are defined as calls made for services when equipment failures constitute a danger to personnel, threaten to damage property, or threaten to disrupt activity, operations, and/or training missions. An example would be an electrical defect which could cause fire or shock. Emergency repair service response time will not exceed

2 hours Monday through Friday, and 4 hours on weekends or holidays, and is in response to requests by telephone or otherwise from the COR or emergency desk personnel, with prior approval from the CO. A cost estimate will be provided within 48 hours.

The cost estimate (part cost, additional labor cost, and any applicable expenses) will be submitted to the COR and CO for approval prior to making any repairs. Emergency repair service shall be rendered at any hour of any day of the week as requested and shall be ongoing until the work is complete.

4. VOLUNTARY PROTECTION PROGRAM: The contractor shall perform work in a safe manner as required by OSHA requirements. Provide a verbal report to the COR immediately upon occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident

Investigation Reports to the COR within five calendar days of each occurrence. Detailed information on Voluntary Protection Plan

(VPP) is available on the OSHA website at http://www.osha.gov/dcsp/vpp/index.html

5. SAFETY: The contractor shall provide and place signage as needed to safely cordon areas where the equipment is being maintained. These clear zones shall be completely void of people and equipment not directly involved in the maintenance of the equipment. During inspection, service, maintenance, or repairs, each affected piece of equipment shall be suitably identified as being out of service and all warnings and cautions will be followed. This placard placement shall also include switches, controls, breakers, etc. While conducting repairs, the contractor shall ensure all FOD is cleared from the area.

6. SECURITY REQUIREMENTS: The contractor shall be responsible for obtaining all required passes, identification media, etc., for both contractor personnel and contractor vehicles, to gain access to Eielson AFB and to the facilities where the equipment is located. For servicing of equipment located in restricted areas, the using organization shall provide suitable escort personnel for the contractor. The contractor shall maintain a current listing of employees. The list will include employee name(s), date(s) of birth, and driver(s) license number. This list shall be validated by the COR and provided to the CO at the contract start date. An updated listing shall be provided upon change of employees.

7. WARRANTY: The contractor shall warrant all contractor installed parts and all contractor workmanship for a period of one year from the date of acceptance by the government. The contractor shall repair or replace, at his or her expense, any materials that become defective during the warranty period. Warranties shall not apply where the damage or failed materials results from abuse or negligence by the government.

http://www.osha.gov/dcsp/vpp/index.html

8. FACILITY/EQUIPMENT IDENTIFICATION:

FACILITY EQUIPMENT QUANTITY

EIE 376 Propulsion/Mx Hangar (Bldg 1361) BGSE – Piller 270V DC kVA Combi GPU 4

EIE 376 Propulsion/Mx Hangar (Bldg 1361) BGSE Group Service Pits 12*

EIE 378 16 Bay Wx Shelter #1 (Bldg 1362) BGSE – Piller 270V DC kVA Combi GPU 16

EIE 379 Squad Ops 2 Hangar (Bldg 1358) BGSE – Piller 270V DC kVA Combi GPU 4

EIE 379 Squad Ops 2 Hangar (Bldg 1358) BGSE Group Service Pits 12*

EIE 382 16 Bay Wx Shelter #2 (Bldg 1364) FCX Systems Model VDC270-V-F-300A 16

EIE 394 4 Bay Wx Shelter (Bldg 1335) BGSE – Piller 270V DC kVA Combi GPU 2

EIE 393 8 Bay Wx Shelter (Bldg 1338) BGSE – Piller 270V DC kVA Combi GPU 8

*Contains (8) 480VDC and (4) 270VDC Power Receptacles

9. GENERAL: All quarterly and annual preventative maintenance, inspections, and servicing will be accomplished in accordance with the O&M manuals and the schedule below, if each item is applicable. See attached photos of the systems and pits.

DESCRIPTION

GOOD REPAIRED NEED REPAIR

BEYOND PMI

MECHANIC

270/480 VDC QUARTERLY PREVENTIVE MAINTENANCE CHECKLIST

1 Inspect for visual damage.

2 Door Shunt trip: Adjust as needed

3 Fuses: Check as needed. Coil fuse, interlock fuse, start/stop auto-resettable fuse, front panel auto-repeatable fuse, 120VAC fuse, and 15 VDC fuse.

4 Lamp Lights and Controls on unit: Check for functionality.

5 Check proper operation of Thermo switches.

6 Review fault log.

7 Check status of corrosion inhibiter.

8 Check and adjust output voltage.

9 Check Bus discharge.

10 Visually check for missing or worn hardware.

Visually inspect outside paint and surface condition. Check for rust, corrosion, or body damage.

12 Visually inspect control panel for missing or damaged indicators.

13 Check all wiring for tightness. Re-tighten all high voltage terminals.

14 Check contactors for abnormal wear.

15 Check output and input cable connections and tighten if needed.

270/480 VDC ANNUAL PREVENTIVE MAINTENANCE CHECKLIST

16 Test IGBT boards for proper operation.

17 Test Diagnostic board for proper operation.

18 Test Start/Stop Board.

Using the keypad, check the following: Input voltage average, input voltage phase

A, B and C.

Service PIT QUARTERLY PREVENTIVE MAINTENANCE CHECKLIST

20 Vacuum clean the PIT.

21 Hatch Gaskets: Make sure gaskets are free from debris and not ripped.

22 Gas Spring: Make sure no oil is leaking from gas springs, they are fastened tightly and the extension rods are not bent.

23 External Cables: Inspect for nicks, unusual wear and tear, damage, or lose connections.

24 Push Buttons: Check for operation.

25 Check and clean the limit switches in the PIT.

26 Limit Switch: Check to make sure limit switch is in good working order and no adjustments are needed.

Service PIT ANNUAL PREVENTIVE MAINTENANCE CHECKLIST

All electrical connections: Check to make sure all internal electrical connections are still tight and cables and wires are in good condition.

Hose connections: Check hose connections and condition of hose.

29 General corrosion inspection: Check all surfaces of PIT looking for any sign of corrosion.

10. PROVISIONS: The government will provide an open hangar parking location to perform and verify operational checks. ** The government will also supply available utilities at no cost.

11. CHANGES TO THE PWS: No changes to this PWS will be allowed without the Contracting Officer’s approval.

* Estimated expiration of 1-year equipment service warranty.