JA-1_Airfield_Paint_SOW_FTQW_14-2008_IFB.pdf
PDF 83 KB Posted
- Attached to
- Airfield Painting Project FTQW 14-2008 Federal contract opportunity
- Solicitation number
- FA5004-15-B-C001
About this file
JA-1 Airfield Paint SOW FTQW 14-2008 IFB
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA5004-15-B-C001-0002_-_Amendment_0002.pdf | ||
| JA_-_1_Airfield_Paint_SOW_FTQW_14-2008_IFB_-_24_Apr_15.pdf | ||
| JA_-_4_Airfield_Painting_Plan_24_Apr_15.pdf | ||
| JA-11_ETL_04-2_(Change_1).pdf | ||
| FA5004-15-B-C001-0001_Amendment__1.pdf | ||
| JA-12_Manual_on_Uniform_Traffic_Control_Devices_Section_3B.16..pdf | ||
| JA-1_Airfield_Paint_SOW_FTQW_14-2008_IFB_-_9_Apr_13.pdf | ||
| JA-6_AF_Form_66 _Schedule_of_Material_Submittals.pdf | ||
| JA-4_Airfield_Painting_Plan.pdf | ||
| JA-8_AF_Form_3064.pdf | ||
| JA-2_EAFB_Specifications_11252014.pdf | ||
| FA5004-15-B-C001_Airfield_Striping_IFB.pdf | ||
| JA-7_AF_Form_3000.pdf | ||
| JA-9_AF_Form_3065.pdf | ||
| JA-3_Technical_Specifications_Airfield_Painting_07042014.pdf | ||
| JA-10_WAGE_DETERMINATION.pdf | ||
| JA-5_Edge_Lines_Map.pdf | ||
| FBO_Original_Airfield_Painting_Synopsis.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
PROJECT FTQW 14-2008
Airfield Painting
1.0 INTRODUCTION: Eielson Air Force Base (EAFB) is located approximately 23 miles southeast of Fairbanks, AK. The airfield can be accessed from Flightline Ave. through the vehicle gates specified by the Contracting Officer.
2.0 SCOPE: Furnish all labor, supplies, parts, transportation, tools, equipment, and facilities necessary to perform work required to complete project FTQW 14-2008 in strict accordance with this Statement of Work, specifications, and the contract.
3.0 DESCRIPTION OF WORK: This project consists of painting airfield markings on the runway, taxiways and aprons to keep the airfield acceptable for flying operations. All work will be done in accordance with ETL 04-2 (Change 1): Standard Airfield Pavement Marking
Schemes.
3.1 Paint pavement markings as existing on the taxiways as shown on attached maps. The total of yellow 6” lines to be painted shall be 169,348 LF.
3.1.1 Taxiway lines on Oscar need to be moved 4-6 ft. The Airfield Manager will determine the proper location for marking.
3.2 Paint all of pavement markings on runway IAW ETL 04-2. Edge lines to be removed and repainted are marked on the attached map in Tab 3.Remove and repaint the eastern edge line starting 9,821 ft. north of where the edge line begins on the 32 end of the runway, and go northward 4,475 ft. to termination at the 14 end of the runway. The total for the western edge line removal and painting shall be 13,425 SF.
3.3 Remove and repaint a total of 33,723 SF Touchdown Zone, Thresholds, and Runway
Numbers markings IAW ETL 04-2 due to excessive paint build-up.
3.4 Remove and repaint a total of 20,000 SF Fixed Distance markings IAW ETL 04-2 due to excessive paint build-up.
3.5 Remove and repaint a total of 26,915 SF runway centerline markings IAW ETL 04-2.
Ensure the centerline stripes have the required 3’ space between mandatory airfield markings.
3.6 Remove and repaint a total of 8,346 LF VFR Runway Hold Lines IAW ETL 04-2.
3.5 Remove and repaint a total of 60 LF ground receiver checkpoints IAW ETL 04-2
Airfield Manager will determine proper marking.
3.7 Remove and repaint a total of 500 SF stop bars in accordance with Manual on Uniform
Traffic Control Devices Section 3B.16 (Tab 7). All stop bars shall be 18” wide.
3.9 Remove and repaint a total of 27 SF of stop blocks IAW ETL 04-2. section 7.1.2.
Airfield Manager will determine proper marking location.
4.0 SUBMITTALS: As indicated in the attached AF Form 66, Schedule of Material Submittals.
5.0 GOVERNMENT FURNISHED MATERIALS: None
6.0 INSTRUCTIONS TO THE CONTRACTOR:
6.1 Photography is restricted to personnel who have worked through the Contracting
Officer to obtain required permissions.
6.2 The airfield is a secure area of EAFB that also contains restricted areas with sensitive Government property and equipment. The Contractor shall follow all EAFB regulations and instructions for working in these different areas. There will be free zones established that allow the Contractor to work in specified areas at scheduled dates and time to avoid conflicting with EAFB mission operations.
6.3 The Contractor’s daily work schedule shall be confined to evenings (2200L - 0700L)
Monday through Friday except federal holidays. The Period of Performance will be
1 Jun 15-30 July 15. An expansion of these hours is possible if previously approved by
Airfield Operations at least 24 hours in advance.
6.4 Mission priorities take precedence over this work. Scheduling and coordination with the Government must be done to ensure there is no conflict with the mission. This may lead to the potential for non-normal work hours. The Contracting Officer shall be notified of any incidents or issues that may affect the work schedule or contract. On critical issues, oral notification should be made immediately, followed by written notification as soon as practical.
6.5 The Contractor shall keep the work area clean of all debris on a daily basis or more often as required. The Contractor shall keep storage areas clean and orderly at all times.
The Contractor shall dispose of combustible wastes at the end of each work day and under no circumstances allow them to accumulate.
Attachments:
Tab 1 – EAFB Specifications
Tab 2 – Technical Specifications
Tab 3 – Airfield Painting Plan Maps
Tab 4 – Edge Lines Map
Tab 5 – AF Form 66, Schedule of Material Submittals
Tab 6 – ETL 04-2 (Change 1): Standard Airfield Pavement Marking Schemes
Tab 7 – Manual on Uniform Traffic Control Devices Section 3B.16
14 Jan 2015
END OF STATEMENT