FA500019RA002_EPA_Market_Research.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Market Research Paving Requirements Joint Base Elmendorf-Richardson Alaska.
Solicitation number
FA500019RA002
Issued by

About this file

Paving Requirements, Joint Base Elmendorf-Richardson (JBER), AK Market Research - Economic Price Adjustment (EPA) CLINS

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Roadway

FA500019RA002 PAVING REQUIREMENTS JBER ALASKA
Economic Price Adjustment (EPA) Market Research Fuel and Asphalt
Place an X at Item No. You Consider an EPA CLIN for FUEL and ASPHALT for Roadway
STANDARD BID ITEMS - ROADWAY ITEMS
Project Name:Project Number:
YearItem No.Pay ItemPay UnitQuantityFUELASPHALT
1201(1)Clearing and GrubbingAcre2.00
1201(2)Hand ClearingAcre1.50
1201(3)Selective Tree RemovalEach10.00
1202(1)Removal of PavementSY-In225,000.00
1202(2)Pavement PlaningSY-In140,000.00
1202(3)Removal of SidewalkSY1,000.00
1202(4)Removal of Culvert PipeLF500.00
1202(5)Removal of Sanitary Sewer PipeLF250.00
1202(6)Removal of ManholeEA8.00
1202(7)Removal of Junction BoxEA12.00
1202(8)Removal of InletEA10.00
1202(9)Removal of Curb and GutterLF3,000.00
1202(10)Removal of Underground Storage TankEA4.00
1202(11)Removal of Concrete VaultEA4.00
1202(12)Saw Cut Existing AsphaltLF-In80,000.00
1202(13)Saw Cut Existing ConcreteLF-In40,000.00
1202(14)Remove Plain ConcreteCY6,000.00
1202(15)Remove Reinforced ConcreteCY8,000.00
1203(1)Common ExcavationCY20,000.00
1203(2)Unclassified ExcavationCY30,000.00
1203(3)Muck ExcavationCY5,000.00
1203(4A)Borrow, Type ATon23,000.00
1203(4B)Borrow, Type BTon5,000.00
1203(4C)Borrow, Type CTon40,000.00
1203(5)Usable Roadway ExcavationCY10,000.00
1203(6)Ditch Linear GradingLF10,000.00
1204(1)Structure ExcavationCY1,000.00
1301(1)Aggregate Base Course, Grading D-1Ton7,500.00
1301(2)Aggregate Surface Course, Grading E-1Ton1,500.00
1306(1)Asphalt Treated Base (ATB) CourseTon2,000.00
1308(1)Crushed Asphalt Base CourseSY-In2,000.00
1308(2)CSS-1 Asphalt for Base CourseTon7,500.00
1401(1A)HMA, Type II; Class ATon12,000.00
1401(1B)HMA, Type II; Class BTon5,000.00
1401(2)Joint AdhesiveLF15,000.00
1401(3)Crack RepairLF150.00
1408(1)HMA, Type VHTon8,000.00
1410(1)HMA, SBS ModifiedTon10,000.00
1501(1)Class A ConcreteCY3,500.00
1501(2)Class A-A ConcreteCY1,250.00
1501(3)Class W ConcreteCY500.00
1501(4)Reseal Existing JointLF2,000.00
1503(1)Reinforcing SteelPound25,000.00
1503(2)Epoxy Coated Reinforcing SteelPound1,750.00
1503(3)Welded Wire FabricPound5,000.00
1503(4)Drill and Bond DowelsEach600.00
1603(1)12 Inch CSPLF250.00
1603(2)End Section for 12 Inch CSPEA2.00
1603(3)18 Inch CSPLF100.00
1603(4)End Section for 18 Inch CSPEA2.00
1603(5)24 Inch CSPLF100.00
1603(6)End Section for 24 Inch CSPEA2.00
1603(7)36 Inch CSPLF50.00
1603(8)End Section for 36 Inch CSPEA2.00
1603(9)18 Inch Corrugated Aluminum PipeLF150.00
1603(10)End Section for 18 Inch Corrugated Aluminum PipeEA2.00
1603(11)24 Inch Corrugated Aluminum PipeLF250.00
1603(12)End Section for 24 Inch Corrugated Aluminum PipeEA2.00
1603(13)36 Inch Corrugated Aluminum PipeLF100.00
1603(14)End Section for 36 Inch Corrugated Aluminum PipeEA2.00
1603(15)18 Inch Corrugated Polyethylene PipeLF1,200.00
1603(16)End Section for 18 Inch Corrugated Polyethylene PipeEA8.00
1603(17)24 Inch Corrugated Polyethylene PipeLF1,200.00
1603(18)End Section for 24 Inch Corrugated Polyethylene PipeEA8.00
1603(19)36 Inch Corrugated Polyethylene PipeLF500.00
1603(20)End Section for 36 Inch Corrugated Polyethylene PipeEA2.00
1604(1)Storm Sewer Manhole, Type IEA3.00
1604(2)Storm Sewer Manhole, Type IIEA5.00
1604(3)Storm Sewer Manhole, Type IIIEA1.00
1604(4)Sanitary Sewer Manhole, Type AEA2.00
1604(5)Sanitary Sewer Manhole, Type BEA1.00
1604(6)Sanitary Sewer Manhole, Type CEA1.00
1604(7)Reconstruct Existing ManholeEA5.00
1604(8)Adjust Existing ManholeConeEA15.00
1604(9)Adjust Existing Manhole RingEA12.00
1604(10)Inlet, CurbEA6.00
1604(11)Inlet, BeehiveEA2.00
1604(12)Inlet, GrateEA2.00
1604(13)Relocate InletEA1.00
1604(14)Relocate ManholeEA2.00
1604(15)Storm Drain CleanoutEA5.00
1606(1)W-Beam GuardrailLF150.00
1606(2)Thrie Beam GuardrailLF150.00
1606(3)Remove and Dispose of GuardrailLF200.00
1606(4)Double-faced, W-Beam GuardrailLF50.00
1606(5)Short Radius GuardrailEA4.00
1606(6)Slotted Rail Terminal (SRT-350)EA2.00
1606(7)Extruder Terminal (ET-2000)EA2.00
1606(8)Parallel Guardrail TerminalEA4.00
1606(9)Transition RailEA2.00
1606(10)Steel Bollard - FixedEA2.00
1606(11)Steel Bollard - RemovableEA1.00
1606(12)Wood Bollard - FixedEA2.00
1606(13)Wood Bollard - RemovableEA1.00
1607(1)Barbed WireLF500.00
1607(2)Woven Wire FenceLF200.00
1607(3)Chain Link FenceLF1,000.00
1607(4)Double Swing Gate (20' Opening)EA4.00
1607(5)Pedestrian Gate (4' Opening)EA6.00
1608(1)Concrete Sidewalk, 6 inches thickSY800.00
1608(2)Asphalt PathwayTon125.00
1608(3)Curb RampEA8.00
1608(4)Curb NoseEA12.00
1609(1)Curb and Gutter (All Types)LF5,000.00
1609(2)Valley GutterLF200.00
1609(3)Backing CurbLF100.00
1609(4)Concrete Parking BumperEA18.00
1610(1)Ditch LiningCY200.00
1611(1)Riprap, Class ICY150.00
1611(2)Riprap, Class IICY80.00
1611(3)Riprap, Class IIICY30.00
1611(4)Riprap, Class IVCY10.00
1614(1)Concrete "F" Shaped BarrierLF100.00
1615(1)Standard SignSF55.00
1615(2)Remove and Relocate Existing SignEA4.00
1615(3)Delineator, RigidEA100.00
1615(4)Delineator, FlexibleEA100.00
1615(5)Salvage SignEA18.00
1616(1)3/4 Inch Diameter Thaw PipeLF25.00
1618(1)SeedingAcre1.50
1619(1)MulchingSY25.00
1619(2)MattingSY150.00
1620(1)Topsoil, 4-inches thickSY550.00
1621(1)Tree, White Spruce (2 inch caliper)EA2.00
1621(2)Tree, Lodgepole Pine (2 inch caliper)EA2.00
1621(3)Tree, Amur Maple (2 inch caliper)EA2.00
1621(4)Tree, Siberian Larch (2 inch caliper)EA2.00
1621(5)Tree, Siberian Fir (2 inch caliper)EA2.00
1621(6)Tree, Blue Colorado Spruce (5-6 feet tall)EA2.00
1621(7)Tree, Weeping Birch (2 inch caliper)EA2.00
1621(8)Tree, Paper Birch (2 inch caliper)EA2.00
1621(9)Willow StakesEA100.00
1622(1)Boulder, 4-Foot DiameterEA6.00
1623(1)Lawn SodSY100.00
1625(1)Pipe Hand RailLF100.00
1626(1)Sanitary Sewer Conduit, 4 Inch PVCLF200.00
1626(1A)Sanitary Sewer Conduit, PVC Incremental InchLF50.00
1626(2)Sanitary Sewer Conduit, 4 Inch HDPELF100.00
1626(2A)Sanitary Sewer Conduit, HDPE Incremental InchLF20.00
1626(3)Sanitary Sewer Conduit, 4 Inch Ductile IronLF50.00
1626(3A)Sanitary Sewer Conduit, Ductile Iron Incremental InchLF20.00
1626(4)Sewer Service ConnectionLF50.00
1627(1)Fire Hydrant AdjustmentEA2.00
1627(2)Fire Hydrant InstallationEA1.00
1627(3)Fire Hydrant RelocationEA1.00
1627(4)Fire Hydrant RemovalEA1.00
1627(5)Adjustment of Valve BoxEA20.00
1630(1)Geotextile, Separation, Class 3SY20,000.00
1630(2)Geotextile, Stabilization, Class 1SY1,000.00
1630(3)Geotextile, Reinforcement, Type 1SY100.00
1630(4)Geotextile, Reinforcement, Type 2SY100.00
1631(1)Geotextile, Drainage, Class 2SY750.00
1631(2)Geotextile, Erosion Control, Class 1SY500.00
1632(1)Paving FabricSY500.00
1633(1)Silt FenceLF2,000.00
1635(1)Insulation BoardSF14,000.00
1639(1)DrivewayEA10.00
1639(2)ApproachEA15.00
1641(1)Erosion, Sediment and Pollution ControlEA8.00
1642(1)Construction SurveyingEA7.00
1642(2)Three Person Survey PartyHR120.00
1642(3)Set Primary MonumentEA1.00
1642(4)Set Secondary MonumentEA1.00
1642(5)Adjust Existing MonumentEA1.00
1642(6)Monument CaseEA1.00
1642(7)Adjust Existing Monument CaseEA1.00
1643(1)Traffic MaintenanceDay50.00
1643(2)Construction SignEA120.00
1643(3)Type II BarricadeEA12.00
1643(4)Type III BarricadeEA8.00
1643(5)Traffic Cone/Tubular MarkerEA120.00
1643(6)Plastic Safety FenceLF500.00
1643(7)DrumEA200.00
1643(8)Sequential Arrow Panel, Type CEA2.00
1643(9)Special Construction SignsSF195.00
1643(10)Portable Concrete BarrierEA2.00
1643(11)Temporary Crash CushionEA1.00
1643(12)Interim Pavement MarkingsLF250.00
1643(13)FlaggingHR160.00
1643(14)Street SweepingHR6.00
1643(15)Portable Changeable Message Board SignDay60.00
1660(1)Temporary SignalizationEA1.00
1660(2)Temporary IlluminationEA1.00
1660(3)Slip Base Luminaire PoleEA6.00
1660(4)Fixed Base Luminaire PoleEA2.00
1660(5)Signal Mast Arm PoleEA2.00
1660(6)Combination Signal/Luminaire PoleEA2.00
1660(7)Signal Pedestal Pole - Flange BaseEA4.00
1660(8)Signal Pedestal Pole - Slip BaseEA4.00
1660(9)Pedestrian Pushbutton PoleEA2.00
1660(10)Signal Mast ArmEA4.00
1660(11)Luminaire ArmEA8.00
1662(1)Cast-In-Place Luminaire Pole FoundationEA4.00
1662(2)Driven Pile Luminaire Pole FoundationLF4.00
1662(3)Controller Cabinet FoundationEA1.00
1662(4)Signal Mast Arm Pole FoundationEA4.00
1662(5)Signal Pedestal Pole FoundationEA4.00
1662(6)Pedestrian Pushbutton Pole FoundationEA2.00
1662(7)Load Center FoundationEA1.00
1664(1)GRSC Steel Conduit (3-inch)LF6,250.00
1664(2)Schedule 40 PVC Conduit (2-inch)LF3,000.00
1664(3)Schedule 40 HDPE Conduit (2-inch)LF2,000.00
1665(1)Junction Box, Type 1AEA6.00
1665(2)Junction Box, Type IIEA4.00
1665(3)Junction Box, Type IIIEA4.00
1665(4)Adjust Junction Box to GradeEA12.00
1666(1)Post-Mounted Load Center Overhead Service, Type 3EA1.00
1666(2)Post-Mounted Load Center Underground Service, Type 2EA1.00
1666(3)Single-Meter Load Center Enclosure, Type 1EA1.00
1666(4)Single-Meter Load Center Enclosure, Type 1AEA1.00
1666(5)Pole-Mounted Photocell Installation, CompleteEA1.00
1666(6)120/240 - 240/480 TransformerEA1.00
1667(1)TS2-1 Controller UnitEA1.00
1668(1)Install Loop Detector - New WorkEA12.00
1668(2)Install Loop Detector - Existing PavementEA2.00
1668(3)Install Optical Preemtion DetectorEA1.00
1668(4)Install Radar DetectorEA1.00
1668(5)Install Ultrasonic DetectorEA1.00
1669(1)8 Inch (3,4,5) Face Signal HeadEA4.00
1669(2)12 Inch (3,4,5) Face Signal HeadEA4.00
1669(3)Remove and Relocate Existing Signal HeadEA2.00
1670(1)Single StripeLF500.00
1670(2)Double or Wide StripeLF1,500.00
1670(3)Transverse Pavement Marking LinesSF1,200.00
1670(4)Transverse Markings, Words and SymbolsEA8.00
1670(5)Preformed Pavement MarkingsLF500.00
1670(6)Raised Pavement MarkerEA150.00
1670(7)Recessed Pavement MarkerEA100.00
1670(8)Removal of Pavement MarkingsSF2,000.00
1670(9)MMA Pavement Markings, Longitudinal Surface AppliedLF1,000.00
1670(10)MMA Pavement Markings, Longitudinal InlaidLF1,250.00
1670(11)MMA Pavement Markings, Symbols and Arrow(s) InlaidEA8.00
1670(12)MMA Pavement Markings, Transverse InlaidLF48.00
1671(1)Pedestrian Signal HeadEA2.00
1671(2)Remove and Relocate Pedestrian Signal HeadEA1.00
1671(3)Pedestrian Pushbutton AssemblyEA1.00
1671(4)Remove and Relocate Pedestrian Pushbutton AssemblyEA1.00
1672(2)Luminaire (LED)EA4.00
1673(1)Interconnect CabinetEA1.00
1682(1)Utility PotholingHR25.00
1683(1)Exploratory Hole (Excavate)EA4.00
1683(2)Exploratory Hole (Dril)EA2.00
1683(3)Geotechnical ReportEA4.00
1684(1)Test Contaminated SoilEA1.00
1684(2)Remediate Contaminated SoilTon1.00
1685(1)Soil and Aggregate (Initial Acceptance)EA2.00
1685(2)Soil and Aggregate (Ongoing Acceptance)EA12.00
1685(3)Soil in-place Density TestingEA100.00
1685(4)Concrete CylindersEA12.00
1685(5)Concrete (Additional Cylinder)EA6.00
1685(6)Concrete BeamsEA8.00
1685(7)Concrete (Additional Beam)EA6.00
1685(8)Asphalt TestingEA12.00
1685(9)Asphalt Density Testing (Mat or Joint)EA22.00
Subtotal$0.00
Prepared by:Bonding Premium$0.00
Prepared date:Estimated Total$0.0011,651,042.06

Airfield

FA500019RA002 PAVING REQUIREMENTS JBER ALASKA
Economic Price Adjustment (EPA) Market Research Fuel and Asphalt
Place an X at Item No. You Consider an EPA CLIN for FUEL and ASPHALT for Airfield
STANDARD BID ITEMS AIRFIELD
Project Name:Project Number:
YearItem No.Pay ItemPay UnitQuantityFUELASPHALT
1301(3)Crushed Aggregate Base Course for Airfields, Grading D-1Ton12,000.00
1301(4)Crushed Aggregate Base Course for Airfields, Grading C-1Ton2,500.00
1306(2)Asphalt Treated Base (ATB) Course for AirfieldsTon4,500.00
1308(3)Crushed Asphalt Base Course for AirfieldsTon8,000.00
1308(4)CSS-1 Asphalt for Base Course on AirfieldsTon4,000.00
1403(1)Joint Sealing, Bituminous PavementLF325.00
1404(1)Jet Fuel Resistant Seal CoatSY45.00
1404(2)Trowel Applied Jet Fuel Resistant Seal CoatSY45.00
1409(1)Airfield HMA, Surface CourseTon7,000.00
1409(2)Airfield HMA, Intermediate CourseTon7,000.00
1409(3)Airfield HMA, ShouldersTON4,000.00
1502(1)Concrete for Airfields (Taxiways and Runways)CY1,000.00
1502(2)Concrete for Airfields (Hardstands and other Slabs)CY3,000.00
1504(1)Joint Sealant, Two Component, Cold AppliedLF500.00
1504(2)Joint Sealant, Non-Jet Fuel Resistant, Hot AppliedLF250.00
1504(3)Joint Sealant, Cold Applied SiliconeLF100.00
1601(1)Pavement Grooving - AsphaltSY28,000.00
1601(2)Pavement Grooving - ConcreteSY4,250.00
1602(1)Tie Down/Grounding Anchor - New Concrete InstallationEA14.00
1602(2)Tie Down/Grounding Anchor - Existing Concrete InstallationEA4.00
1605(1)Aircraft Rated Concrete ManholeEA3.00
1605(2)Aircraft Rated Concrete Catch BasinEA3.00
1612(1)JBD - Non-afterburner Full PowerLF50.00
1612(2)JBD - Full Power AfterburnerLF50.00
1612(3)JBD - Taxiway/BreakawayLF50.00
1615(6)Taxiway Guidance SignSF200.00
1615(7)Runway Distance Remaining SignEA4.00
1615(8)Arresting Gear MarkerEA2.00
1643(17)Airfield Gate WatchHR450.00
1660(12)Flush Runway Centerline Light. L-850A or L-850BEA8.00
1660(13)Flush Taxiway Centerline Light. L-852A, B, E, or GEA8.00
1660(14)Med. Intensity Runway Edge and Threshold Light, L-861 or L-861EEA10.00
1660(15)High Intensity Runway Edge or Threshold Light, L-862 or L-862EEA12.00
1660(16)Taxiway Edge Light, L-861TEA4.00
1660(17)Base Assembly, L-867EA20.00
1660(18)Base Assembly, L-868EA20.00
1660(19)Remove Existing Runway or Taxiway Light BaseEA28.00
1660(20)Adjust Existing Airfield Light StructureEA45.00
1661(1)UG Cable [6 Gauge] AWG, Copper, 5kV type "B" or "C", L-824LF4,500.00
1661(2)UG Cable [6 Gauge] AWG, Copper, 600V, type "C", L-824LF4,500.00
1661(3)[6 Gauge] Bare Copper Ground ConductorLF450.00
1661(4)Ground RodEA45.00
1661(5)UG Cable #14 AWG, 2 Cond., Copper, 600V, Type "SOOW-A/SOOW"LF1,250.00
1664(4)2-inch PVC ConduitLF400.00
1664(5)4-inch PVC ConduitLF650.00
1664(6)2-inch HDPE ConduitLF200.00
1664(7)4-inch HDPE ConduitLF200.00
1664(8)2-inch Steel ConduitLF125.00
1664(9)4-inch Steel ConduitLF150.00
1670(13)Runway and Taxiway PaintingSF1,450.00
1670(14)Remove Pavement MarkingsSF475.00
Subtotal$0.00
Prepared by:Bonding Premium$0.00
Prepared date:Estimated Total$0.00

File details come from the government source that posted it.