Statement of Work.pdf
PDF 90 KB Posted
- Attached to
- Concrete base for model F22
- Solicitation number
- FA500019QA099
About this file
SOW
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
673d Civil Engineer Squadron Joint Base Elmendorf-Richardson, AK
20 August 2019
STATEMENT OF WORK
Construct Concrete Pad, Base and Ballast Building 9443
FXSB 19-1120
SECTION 1: PROJECT INFORMATION
1.1 PROJECT LOCATION: Project FXSB 19-1120 shall be completed as a routine requirement at or near building 9443 on Joint Base Elmendorf-Richardson, AK. Project hours are standard work hours.
1.2 UNIQUE REQUIREMENT: None
1.3 PROJECT DESCRIPTION: Excavate, form and place a concrete pad, hexagon base and sub-surface ballast for an aircraft display model in front of building 9443. Place and mount a government provided aircraft display model on the base.
SECTION 2: GENERAL REQUIREMENTS
2.1 WORKMANSHIP: All work shall be accomplished in accordance with all applicable building and fire codes. Contractor shall field verify all measurements, quantities, or value stated by the Government. Liquidated damages shall be assessed for work that is not finished within the scheduled performance period.
2.2 WORKSITE: The contractor shall limit the work to the areas indicated by the government. The contractor shall make every effort not to disturb or obstruct portions of the facilities still occupied by the government. The contractor shall make efforts to minimize interference to Government operations. The contractor shall coordinate and schedule work with the 673 CES/CEPM office prior the start of any operation. The contractor shall dispose of all construction debris off base at an approved disposal facility.
2.3 SITE SECURITY AND PROTECTION: The contractor shall make every effort to secure the work site, allowing only authorized personnel to enter the work site. The contractor shall protect the site from damage from weather, vandalism, and/or theft.
2.4 DAMAGE TO EXISTING SITE CONDITIONS: The contractor shall be responsible to repair any and all damage incurred to existing Real Property/Grounds due to poor workmanship at no cost to the government. Contractor shall not park or drive on sidewalk or grassy/snowy areas. Damage incurred shall be repaired at no cost to the government.
2.5 HEALTH/SAFETY: The contractor shall be responsible for compliance with OSHA and AFOSH standards. The contractor shall maintain a clean and debris free site at all times.
The contractor shall keep driveways and entrances into and around the work site clear at all times. The contractor shall not use driveways or entrances as employee parking or storage of materials unless otherwise stated. The contractor shall minimize storage of materials and equipment on site.
SECTION 3: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS
3.1 General Requirements
3.1.1. Provide all necessary equipment to excavate and remove existing soil and material for the concrete placement. Care is to be taken not to damage existing trees.
3.1.2. Provide 12” of compacted suitable fill under all new concrete.
3.1.3. Construct a 48” x 48” concrete cube for a ballast per attached drawing. The cube shall have #4 rebar 8” on center both vertically and horizontally. The vertical rebar shall extend beyond the top of the cube 16” to provide a connection for the hexagon base. The concrete cube shall have 4 each ¾” ‘J’ style concrete anchors with a 6” of thread above the finished base. The anchors shall be centered on the top of the cube 16” on center in a square. See attached drawing.
3.1.4. Provide a crane to pick the aircraft model from a truck, place and attach the model to the newly constructed base.
3.1.5. Construct an exposed aggregate, dyed mix, concrete hexagon base 20” tall by 66” maximum width at the bottom 54” maximum width at the top. The hexagon base will be placed after the model is in place.
3.1.6. Construct a 10’ 6” x 12’ x 4” thick concrete pad adjacent to the existing concrete walk. The new concrete pad shall have wire mesh reinforcement and appropriate expansion material where it meets existing concrete.
3.1.7. Backfill and compact all areas affected by the excavation. The top 4” of material shall be top soil capable of germinating and sustaining grass.
3.1.8. Hydro-Seed all top soil areas and maintain watering until seed is established.
SECTION 4: ATTACHMENTS
4.1 Drawing #1 – Ballast Cube Details
4.2 Drawing #2 – Exposed Aggregate Base Concept
4.3 Drawing #3 – Project and Concrete Pad Location.
SECTION 5: PROJECT MANAGER
5.1 David Cook
david.cook.36@us.af.mil Phone: 384-3070
| SECTION 1: PROJECT INFORMATION |
| SECTION 2: GENERAL REQUIREMENTS |
| SECTION 3: DESCRIPTION OF WORK AND SPECIAL INSTRUCTIONS |
| SECTION 4: ATTACHMENTS |
| SECTION 5: PROJECT MANAGER |
File details come from the government source that posted it.