Revised_Drawings.pdf
PDF 1 MB Posted
- Attached to
- Replace Muriatic Acid Pool Federal contract opportunity
- Solicitation number
- FA5000-19-Q-A048
About this file
Please see attached.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation_-_FA500019QA048.pdf | ||
| Solicitation_Amendment_FA500019QA0480002_SF_30.pdf | ||
| SOW_Final.pdf | ||
| Solicitation_Amendment_-_FA500019QA0480001.pdf | ||
| Solicitation_Amendment_FA500019QA0480001_SF_30.pdf | ||
| SOW_Final.pdf | ||
| SOW_Final.pdf | ||
| Revised_Drawings.pdf | ||
| Solicitation_-_FA500019QA048.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL
DATE
DESCRIPTION
REVISIONS
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
DESIGN
PRELIMINARY
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
NTS
FXSB18-1054
X.DWG
DUGGER
DUGGER
FACILITY:
DATE APPR
2/15/2019
2/15/2019DATE:
2/15/2019DATE:
DATE:
DATE:
DRAWING NO:
I
U.S. AIR FORCE
TITLE SHEET
G-1
REPLACE MURIATIC ACID SYSTEM BLDG 690
SCHEDULE OF DRAWINGS
SHEET REFERENCE NUMBER SHEET TITLE
G-1
TITLE SHEET
M-1
MECHANICAL PLAN
MAP KEY
LOCATION DESCRIPTION
RICHARDSON VISITORS GATE
ARCTIC VALLEY GATE GLENN HWY SOUTHBOUND EXIT
ELMENDORF VISITORS GATE
654 6TH STREET: FIRE STATION 4
8517 20TH STREET: SECURITY FORCES
730 QUARTERMASTER ROAD: 673D CES CONTRACT MANAGEMENT
2204 3RD STREET: CORP OF ENGINEERS DISTRICT OFFICE
10480 SIJAN AVENUE: CONTRACTING
PROJECT LOCATION
JOINT BASE ELMENDORF-RICHARDSON
673RD CIVIL ENGINEER SQUADRON
KEY PLAN
BEAVER
A B C D E F G H
SHEET
REFERENCE
NUMBER
ANSI
D
AF PROJECT NUMBER:
AEC FILE NAME:
DRAWING SCALE:
PLOT SCALE:
SYMBOL DATE DESCRIPTION
REVISIONS
JOINT BASE ELMENDORF-RICHARDSON, AK
DESIGNED BY:
DRAWN BY:
CHECKED BY:
PROJ. ENG.
DESIGN
PRELIMINARY
DRAWINGS
1:1
AF CONTRACT NUMBER:
INV. NUMBER:
3/8"=1'
HJZH18-1054
X.DWG
DUGGER
DUGGER
FACILITY:
DATE APPR
2/15/2019DATE:
2/15/2019DATE:
DATE:
DATE:
DRAWING NO:
I
U.S. AIR FORCE
MECHANICAL PLAN
M-1
CONSTRUCTION NOTES
1. NEW CO2 TANK (LOCATION APPROXIMATE, MAY BE
MOVED AROUND ROOM AS NEEDED)
2. NEW FLOW CONTROL UNIT
3. TIE-IN TO EXISTING RETURN WATER (LOCATION
APPROXIMATE)
4. EXISTING BECS CONTROL BOX
5. NEW FILLING STATION
6. EXISTING ELECTRICAL PANELS TO TIE IN TO FOR
NEW RECEPTACLE.
7. NEW DUPLEX RECEPTACLE
8. C02 MONITOR/ALARM DISPLAY IF MANUFACTURER
ALLOWS EXTERIOR MOUNTING.
9. C02 MONITOR/ALARM DISPLAY IF MANUFACTURER
DOES NOT ALLOW EXTERIOR MOUNTING.
10. CO2 SENSOR
0 1' 2' 4'
SCALE: 3/8" = 1'-0"
8'
NOT FOR CONSTRUCTION.
CONTRACTOR TO FIELD VERIFY ALL
DISTANCES, DIMENSIONS, & LOCATIONS.
EXACT LOCATIONS OF NEW EQUIPMENT
WILL DEPEND ON DIMENSIONS OF
SELECTED TANKS. CONDUIT/PIPING
ROUTES APPROXIMATE AND MAY BE
FIELD ADJUSTED AS NEEDED.
6/6/2019
REPLACE MURIATIC ACID SYSTEM BLDG 690
KEY PLAN
BEAVER
LEGEND
APPROXIMATE FILL HOSE ROUTE
APPROXIMATE ELECTRICAL CONDUIT
ROUTE
APPROXIMATE SENSOR WIRE &
CONDUIT ROUTE (EXTERIOR MOUNT)
7 8
AutoCAD SHX Text N
AutoCAD SHX Text
BUILDING: 690 FLOOR: 1
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text
UP
AutoCAD SHX Text N
| Buckner CO2-Cover Sheet |
| Sheets and Views |
| Cover Sheet |
| Buckner CO2-M-1 |
| Sheets and Views |
| Buckner CO2_recover-A-1 |
File details come from the government source that posted it.