Attachment_4_-_QA.pdf

PDF 188 KB Posted

Attached to
Bldg 11415 Sewer Line Federal contract opportunity
Solicitation number
FA500019QA013
Issued by
Department of the Air Force Pacific Air Forces

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to Bldg 11415 Sewer Line, newest first.
File Type Posted
Solicitation_Amendment_FA500019QA0130003_SF_30.pdf PDF
Attachment_4_-_Revised_SOW_25_March_2019.pdf PDF
Solicitation_Amendment_FA500019QA0130002_SF_30.pdf PDF
Solicitation_Amendment_FA500019QA0130001_SF_30.pdf PDF
Attachment_3_-_Wage_Determination.pdf PDF
Attachment_2_-_Drawings.pdf PDF
Solicitation_-_FA500019QA013.pdf PDF
Attachment_1_-_Statement_of_Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

673D CONTRACTING SQUADRON

JOINT BASE ELMENDORF-RICHARDSON ALASKA

27 March 2019

673 CONS/PKA

10480 Sijan Ave.

JBER, AK 99506

Solicitation No: FA5000-19-Q-A013 Project: Bldg 11415 Sewer Line Subject: Questions and Answers

Q1: SWPPP‐ Page 19 says no SWPPP is required, page 33 says it is‐ confirm no SWPPP Plan or NOI is required.

A1: If there is more than 1 acre of exposed soil due to the construction process will need to have a

SWPPP.

Q2: Manholes‐ page 60 calls out pressure test for proposed multi‐piece 'horseshoe' manhole. This is an unusual specification for this type of manhole. Confirm if manhole requires negative air pressure test.

A2: No negative air pressure test required

Q3: Manholes‐ page 62 reference epoxy coating interior of manhole‐ confirm that manhole does not require epoxy coating.

A3: No epoxy coating on the manhole required.

Q4: Temporary Sewer Service‐ page 60 calls out temporary sanitation as an option if sewer is not fed by family housing‐ confirm that this service is not fed by family housing and that portable sanitation is acceptable.

A4: The fire station is a 24 hour a day, seven days a week and the firefighters shower at this location.

Bypass pumping will be required as this is classified as a “housing” location.

JERMAINE R. VILLAREAL, SrA, USAF Contracting Specialist