Attachment_2_-_Project_Drawings.pdf
PDF 1 MB Posted
- Attached to
- Bldg 3010 Water Main Repair Federal contract opportunity
- Solicitation number
- FA500019QA008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0001_-_QA.pdf | ||
| Solicitation_Amendment_FA500019QA0080001_SF_30_Signed.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Solicitation_-_FA500019QA008.pdf | ||
| Attachment_3_-_Wage_Determination.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a c i f i c G e o B a s e T a b l o i d [ A N S I B - L a n d s c a p e ] P a c i f i c G e o B a s e T a b l o i d [ A N S I B - L a n d s c a p e ] μ
1.5 0 1.5 3 4.5 60.75 mi
3 0 3 6 9 121.5 km
1191620409C Callout Project Location
1191620409C Callout Boniface Gate
1191620409C Callout Post Road Gate
1191620409C Rejected
P a c if ic G e o
B a s e
T a b lo id
A N
S I
B
L a n d s c a p e
P a c if ic G e o
B a s e
T a b lo id
A N
S I
B
L a n d s c a p e μ 0.
0.
0.
0.
0.
0.
m i
0.
0.
0.
0.
0.
0.
km
1191620409C Polygonal Line
1191620409C Polygonal Line
1191620409C Polygonal Line
1191620409C Polygonal Line
1191620409C Text Box Summer scope in light blue, NTP no later than May 15, 2019
1191620409C Text Box Winter scope in dark blue NTP issued ASAP
1191620409C Callout 2 inch service lateral with 2 inch valve and associated riser/valve box just off the 8 inch water main. Install 10 foot section of 2 inch waterline and cap. Aurora Housing to continue from this point to building 3010 and reconnect to the building water system.
1191620409C Callout 8 inch waterline, connecting onto 8 inch section previously installed during winter repair.
1191620409C Callout Connect new 8 inch to existing 8 inch Asbestos Concrete pipe. Cap and abandon in place the AC line heading to the West under the garage of 3010.
1191620409C Text Box Contractor to sanitize and flush all newly installed waterline materials. Water service not to be placed back into service until water samples are submitted showing they pass. Contractor to repair the area to the west and east of Building 3010, replacing sidewalk, curb and gutter, topsoil and seed, and trees impacted work scope. Replace affected asphalt with 3 inches of new asphalt on 6 inches of D-1.
1191620409C Callout Connect 8 inch Ductile to existing 8 inch Asbestos Concrete pipe coming from the West. Cap and abandon AC pipe heading East under the garage of 3010.
1191620409C Callout Install 8X8X4 Tee connecting the existing 3 inch or 4 inch AC line headed north by reducing down from 4 inch. Install 4 inch valve just north of Tee. Cap and abandon 3 or 4 inch line headed south. Install 8 inch valve just east of the tee and install 10 foot long 8 inch pipe section just east of the valve. Cap west end of 8 inch pipe in preparation for continuing with summer scope
1191620409C Polygonal Line
1191620409C Polygonal Line
1191620409C Polygonal Line
1191620409C Callout (NIC) 5/8 inch Arctic Pipe to connect to existing hose bib on 3006 and tie into building 3010 water system. Board off and insulate window to accomplish this. Provides make up water for the 4 boilers inside of 3010. Work by Aurora Housing. Be aware of this pipe that will be in place during construction / repair, and protect it in place.
1191620409C Line
| Writeable Site Map Template |