Specification Sheet - DRAFT.pdf

PDF 215 KB Posted

Attached to
Small Unmanned Aircraft System (sUAS) Field Fabrication Molds, Component Build Kits, and MCA Integration Training
Solicitation number
FA489727QA005
Issued by

About this file

Summary

This is a Statement of Salient Characteristics/Specification Sheet issued by the U.S. Air Force 366th Fighter Wing at Mountain Home Air Force Base (Document Control Number: SPEC-366FW-sUAS-2026-001, dated 14 October 2026) for the procurement of Small Unmanned Aircraft System (sUAS) Field Fabrication Molds, Component Build Kits, and MCA Integration Training. The procurement focuses exclusively on manufacturing capability rather than finished aircraft, requiring delivery of reusable composite/structural molds, critical and non-critical component build kits (scalable 1 to 25 units), assembly tooling, technical data packages, and three-day on-site vendor-led training for up to ten Air Force personnel. All molds must be durable, field-portable, and engineered for minimum 25 demolding cycles without dimensional degradation; critical components must comply with NDAA Section 848 and Defense Innovation Unit Blue UAS guidelines, including NDAA-compliant flight controllers, C2 transceivers, electric propulsion systems, and lithium battery packs with zero foreign-manufactured firmware or covered PRC components in RF, GNSS, or compute chains.

The resulting assembled sUAS must achieve Group 2 classification with gross takeoff weight ≤55 lbs, vertical takeoff/landing (VTOL) capability, wingspan ≤10.0 ft, cruising speed ≥50 knots, 60-minute endurance, 3+ nautical mile operational range, and ≤24 cumulative labor hours for field assembly by trained personnel. Deliverables include one master digital copy and three laminated physical copies of technical manuals covering fabrication, assembly/rigging, avionics integration, and illustrated parts breakdown with sourcing information. The contractor must provide a 180-calendar-day commercial warranty covering all hardware and tooling against manufacturing defects with 14-day replacement for defective components discovered during unboxing or training. All materials shall be delivered FOB Destination to 366th Operations Support Squadron, 1050 Desert Street, Building 2215, Mountain Home AFB, ID 83648 no later than 180 calendar days after contract date, with training coordination required within 30 days of physical delivery. Final Government acceptance occurs upon successful completion of the three-day training evolution and demonstration of at least one field-built airframe achieving airworthy hover and forward flight transition.

View the file

Other files

File Type Posted
Customer Questions for Sources Sought Inquiries.docx DOCX document
sUAS Sources Sought NOTICE .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF SALIENT

CHARACTERISTICS / SPECIFICATION

SHEET

United States Air Force | 366th Fighter Wing (ACC) Mountain Home Air Force Base, ID 83648

Document Control Number: SPEC-366FW-sUAS-2026-001 Date: 14 October 2026 Procurement Title: Small Unmanned Aircraft System (sUAS) Field Fabrication Molds, Component Build Kits, and MCA Integration Training

1. SCOPE AND OBJECTIVES

1.1. Purpose

The 366th Fighter Wing (366 FW) requires a complete fabrication and integration package comprising reusable composite/structural molds, critical components, non-critical components, technical data packages, assembly tooling, and vendor-led instruction. This package shall enable non-AFSC-specific Multi-Capable Airmen (MCA) to fabricate, assemble, ground-test, and operate between one (1) and twenty-five (25) tactical Group 2 Vertical Take-Off and Landing (VTOL) sUAS platforms in austere or garrison operational environments.

1.2. Acquisition Focus

This procurement is strictly for the production molds, component build kits, tooling, technical instructions, and on-site instructional services required to manufacture the sUAS, rather than the acquisition of pre-assembled, turnkey flyaway airframes.

2. CONTRACT DELIVERABLES & LINE ITEM

STRUCTURE

The contractor shall deliver the following items to support the fabrication of between one (1) and twenty-five (25) complete, airworthy Group 2 VTOL sUAS airframes (scalable by sub-CLIN / delivery order):

• CLIN 0001: Airframe Tooling and Reusable Mold Sets

• Full-scale negative molds for all fuselage halves, wing panels, and airfoils.

• Molds must be durable, chemical-resistant, and engineered for repeated field layups (wet composite, prepreg, or approved additive/subtractive rapid methods) with a minimum tool life expectancy of at least 25 demolding cycles without dimensional degradation and must not require power.

• CLIN 0002: Critical Component Build Kits (Quantity: Scalable 1 to 25 Shipsets + Spares)

• NDAA-compliant flight controllers/autopilot units certified or approved under DoD/DIU "Blue UAS" guidelines.

• C2 link transceivers, telemetry radios, RF modules, and precision GPS/INS navigation modules as necessary for airframe flight.

• Electric propulsion suites (VTOL lift motors, forward propulsion motor, electronic speed controllers [ESCs], tilt mechanisms if applicable).

• industry Standard Compliant lithium battery packs or smart power distribution boards.

• CLIN 0003: Non-Critical Component & Hardware Kits (Quantity: Scalable 1 to 25 Shipsets + 20% Consumable Spares)

• Structural raw consumables (Composite, core materials, room-temperature/field-curable resin systems, structural adhesives). Where required for airframe operation.

• Mechanical hardware: Composite spar tubes, control horns, linkage pushrods, clevises, bearings, hinges, and vibration-isolation mounts. Where required for airframe operation.

• Pre-terminated internal wiring harnesses, servo actuators, standard connectors, and payload mounting rails. Where required for airframe operation.

• CLIN 0004: Field Fabrication Tooling and Assembly Kit

• Hand tools, mold release agents, balancing rigs, soldering stations, wire-stripping tools, and platform calibration stands (if necessary).

• CLIN 0005: Technical Data Package (TDP) & Interactive Assembly Guides

• Step-by-step, illustrated assembly manuals, build checklists, wiring schematics, Bill of Materials (BOM), and troubleshooting SOPs designed specifically for general-entry Airmen without formal aircraft manufacturing AFSCs.

• CLIN 0006: On-Site Mobile Training Team (MTT) Instruction

• Three-day comprehensive vendor instruction at Mountain Home AFB for up to ten (10) Government personnel covering mold preparation, airframe layup/assembly, systems integration, bench testing, and flight operations.

3. SALIENT CHARACTERISTICS OF FABRICATION

MOLDS & COMPONENT KITS

3.1. Reusable Tooling and Mold Performance

• Dimensional Accuracy: Molds shall maintain dimensional tolerances to create a flyable airframe with thermal and mechanical cycling across at least 25 consecutive fabrication cycles.

• Portability & Field Durability: Mold cases must be ruggedized, man-portable or palletized, and engineered for rapid cleaning and zero-specialist mold release.

• Registration & Alignment: All two-part or modular molds must feature alignment without need for pins/keys to guarantee structural joint fitment without specialized machining.

3.2. Critical Component Compliance (Blue UAS / NDAA)

• All autopilots, radios, electronic speed controllers, and mission sensors must fully comply with Section 848 of the National Defense Authorization Act (NDAA) and Defense Innovation Unit (DIU) Blue UAS clearing requirements.

• Open-architecture autopilot capability (e.g., PX4 or ArduPilot ecosystem) running on secure, non-covered microcontrollers.

• Zero foreign-manufactured firmware or covered PRC components inside the RF, GNSS, or compute chain.

3.3. Multi-Capable Airman (MCA) Field Manufacturability

• The system must not require specialized facilities (autoclaves, industrial spray booths, or precision CNC machinery).

• Chemical components (resins, adhesives) must cure effectively within standard field ambient temperatures or include portable heating blankets

• Total field assembly time from raw kit/mold to ready-for-flight inspection must not exceed 24 cumulative labor hours per airframe when executed by trained Airmen.

4. SALIENT CHARACTERISTICS OF THE

RESULTING ASSEMBLED sUAS The mold sets and component kits, once fabricated and assembled in accordance with the contractor's provided technical documentation, must yield completed aircraft meeting or exceeding the following minimum flight and physical parameters:

Parameter Minimum Requirement Notes / Verification Method

DoD Classification Group 2 sUAS Max Gross Takeoff Weight ≤ 55 lbs

Gross Takeoff Weight

(MTOW)

≤ 55 lbs(24.95 kg) Must accommodate designated payload reserve

Launch & Recovery Mode

Vertical Take-Off & Landing (VTOL)

Runway-independent;

zero launch rail or capture net required

Wingspan ≤ 10.0 ft(3.05m) Modular detachability for transit preferred

Propulsion System All-Electric Self-Propelled Brushless DC electric motors (dedicated VTOL + forward pusher/tractor)

Cruising Speed ≥ 50 knots(57.5 mph) In level horizontal flight

Normal Operating Altitude

≤ 1,000 ftAGL Structural/propulsion operational ceiling ≤ 5,000 ft AGL

Endurance ≥ 60 minutes Continuous flight time at cruise speed with nominal payload

Operational Range ≥ 3 nautical/statute miles Line-of-Sight (LOS) C2 link stability throughout operating envelope

Environmental Resilience

Wind tolerance: ≥ 5 kts steady / 9 kts gust

Moisture-resistant electronics enclosures

5. TECHNICAL DATA AND ASSEMBLY

DOCUMENTATION

The contractor shall deliver one (1) master digital copy and three (3) laminated field-hardened physical copies of the complete Technical Manual Suite:

1. Fabrication Manual: Mold preparation, release agent application, composite layup schedules, cure monitoring, trimming, and joint bonding.

2. Assembly & Rigging Guide: Installation of control linkages, motor mounts, wiring harness routing, center-of-gravity (CG) balancing procedures, and control deflection calibrations.

3. Avionics Integration & Bench Test Guide: Autopilot sensor calibration, compass/magnetometer declination setup, ESC throttle calibration, radio failsafe verification, and ground station pairing.

4. Illustrated Parts Breakdown (IPB) & Sourcing BOM: Commercial part numbers, Blue UAS alternate source vendors, and MIL-SPEC hardware cross-references.

6. TRAINING REQUIREMENT

6.1. Vendor-Led Mobile Training Team (MTT)

• Location: 366 FW facilities, Mountain Home Air Force Base, ID.

• Duration: Three (3) consecutive days (minimum 8 hours/day).

• Audience: Up to ten (10) active-duty Air Force personnel (no prerequisite aviation fabrication AFSC required).

6.2. Training Syllabus Outline

• Day 1 (Molding & Fabrication): Tooling inspection, surface preparation, wet-layup / molding execution, safety and PPE protocols, composite curing techniques.

• Day 2 (Airframe Extraction & Systems Integration): Demolding, flash trimming, structural reinforcement, motor/servomotor mounting, avionics and C2 wiring harness installation.

• Day 3 (Ground Checkout & Flight Operations): Pre-flight BIT (Built-In-Test), weight & balance checks, ground tether/hover checkouts, transition from VTOL to horizontal flight, autonomous mission flight profiles, emergency failsafe procedures, and maintenance logs.

7. QUALITY ASSURANCE AND WARRANTY

7.1. Hardware & Tooling Warranty

• The contractor shall provide a commercial warranty covering all molds, mechanical hardware, electronics, motors, and wiring harnesses against manufacturing defects and material failure for a minimum of 180 calendar days commencing upon final Government acceptance.

• Prompt replacement (within 14 calendar days) of any defective components discovered during unboxing or training assembly.

7.2. Government Acceptance Testing

• Final acceptance of the molds and kits will occur at Mountain Home AFB upon the successful completion of the 3-day training evolution and the demonstration of an airworthy hover and forward flight transition of at least one (1) field-built airframe.

8. PACKAGING, SHIPPING, AND DELIVERY

8.1. Shipping Terms

• Prices shall be quoted FOB Destination. All shipping, transit insurance, and freight handling costs shall be included in the contractor's quoted firm-fixed price.

8.2. Delivery Address

• Consignee: 366th Operations Support Squadron (366 OSS)

• Address: 1050 Desert Street, Building 2215, Mountain Home AFB, ID 83648

8.3. Period of Performance / Lead Time

• All molds, hardware kits, technical publications, and tooling shall be delivered on-site No Later Than (NLT) 180 calendar days After Date of Contract

(ADC).

• Training schedule to be coordinated with the 366 OSS Contracting Officer Representative (COR) within 30 days following physical delivery.

STATEMENT OF SALIENT CHARACTERISTICS / SPECIFICATION SHEET
1. SCOPE AND OBJECTIVES
1.1. Purpose
1.2. Acquisition Focus
2. CONTRACT DELIVERABLES & LINE ITEM STRUCTURE
3. SALIENT CHARACTERISTICS OF FABRICATION MOLDS & COMPONENT KITS
3.1. Reusable Tooling and Mold Performance
3.2. Critical Component Compliance (Blue UAS / NDAA)
3.3. Multi-Capable Airman (MCA) Field Manufacturability
4. SALIENT CHARACTERISTICS OF THE RESULTING ASSEMBLED sUAS
5. TECHNICAL DATA AND ASSEMBLY DOCUMENTATION
6. TRAINING REQUIREMENT
6.1. Vendor-Led Mobile Training Team (MTT)
6.2. Training Syllabus Outline
7. QUALITY ASSURANCE AND WARRANTY
7.1. Hardware & Tooling Warranty
7.2. Government Acceptance Testing
8. PACKAGING, SHIPPING, AND DELIVERY
8.1. Shipping Terms
8.2. Delivery Address
8.3. Period of Performance / Lead Time

File details come from the government source that posted it. Updated .