Solicitation_FA489726B0007_Amendment 2.pdf

PDF 616 KB Posted

Attached to
B1610 and 2310 Boiler Replacement
Solicitation number
FA489726Q0008
Issued by

About this file

This is a Sealed Bid Invitation for Bid (IFB) for construction services issued by the U.S. Air Force at Mountain Home Air Force Base in Idaho. The solicitation number is FA489726B0007, issued on April 24, 2026, with sealed bids due by 10:00 AM local time on May 6, 2026.

The contract requires the direct replacement of two boilers located in Buildings B1610 and B2310 in accordance with the attached Statement of Work. This is a firm fixed-price contract with two line items (one for each boiler replacement). The contractor must begin performance within 190 calendar days of award and complete the work within 190 calendar days after receiving the notice to proceed. The contract is set aside for small businesses (100% small business set aside) under NAICS code 238220 with a size standard of $19,000,000 in annual receipts. Performance and payment bonds are required within 10 calendar days of award at 100% of the original contract price. The Government will evaluate offers using a best value tradeoff approach, considering price and technical capabilities/experience. Offers must remain valid for a minimum of 60 calendar days from the due date. An ombudsman is available to address offeror concerns, and contractor personnel will require base identification and vehicle passes for work performed on the Air Force installation. Wage determinations apply per the attached determination DBA-ID20260020. The contract incorporates numerous FAR and DFARS clauses including Buy American provisions for construction materials, and contractors must ensure all construction materials are domestic unless exceptions apply.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION

NUMBER

FA489726B0007

2. TYPE OF SOLICITATION

SEALED BID (IFB) INVITATION

FOR BID

NEGOTIATED (RFP) REQUEST

FOR PROPOSAL

3. DATE ISSUED

24 Apr 2026

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

A060463

7. ISSUED BY CODE: FA4897

FA4897 366 CONS LGCP

366 GUNFIGHTER ST STE 498, ADMINISTRATIVE ONLY NO REQUISITIONS

MOUNTAIN HOME AFB, ID 83648-5296

UNITED STATES

DEIVID BAEZ, Email: deivid.baez.co@us.af.mil Telephone: 2088283115 GAGE BERGMAN, Email: gage.bergman@us.af.mil Telephone: 208-828-3128

8. ADDRESS OFFER TO

9. FOR

INFORMATION

CALL:

a. NAME

DEIVID BAEZ

b. TELEPHONE NUMBER (include area code) (NO COLLECT CALLS) 2088283115

SOLICITATION

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".

10.THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

Project Title: B1610 and 2310 Boiler replacement Project Location: Mountain Home Air Force Base

Contractor shall replace two boilers located in B1610 and 2310 IAW SOW

11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving 190 190 award, notice to proceed. This performance period is mandatory negotiable. (See ). FAR 52.211-10

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES", indicate within how many calendar days after award in Item 12b.)

YES NO

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) 1 10:00 AM local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes 06 May 2026 containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. 60

Computer generated. STANDARD FORM 1442 (REV. 12/2022) Prescribed by GSA-FAR (48CFR) 53.236-1(d)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

CODE FACILITY CODE

15. TELEPHONE NUMBER (Include area code)

16. REMITTANCE ADDRESS (Include only if different than item 14.)

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT

NUMBER

DATE

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20b. SIGNATURE 20c. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED

STATES CODE AT

10 U.S.C 3204(a) ( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document

Contractor agrees to furnish and return copies to issuing office.)

and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)

31a. NAME OF CONTRACTING OFFICER (Type or print)

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA

BY

31c. DATE

Computer generated. STANDARD FORM 1442 (REV. 12/2022) BACK

Section A - Solicitation/Contract Form B1610 and 2310 Boiler replacement

NAICS: 238220

Size Standard: USD 19,000,000.00 Annual receipts

Small Business Type: Small Business Set Aside Percent: 100

Product Service Code: Z2JZ

FA489726B0007

Section B - Supplies or Services & Prices or Costs Additional Information/Notes

Item Supplies / Services Quantity Unit Unit Price Amount

B1610 Boiler replacement IAW SOW

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Job

B2310 Boiler replacement IAW SOW

Product Service Code: Z2JZ Pricing Arrangement: Firm Fixed Price

1 Job

Section C - Description/Specifications/Statement of Work

Requirements Direct replacement of Boilers located in B1610 and B2310 IAW SOW

Section D - Packaging and Marking

Section E - Inspection and Acceptance Overall Contract Inspection/Acceptance Locations

Acceptance Location

Acceptance Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: FA4897 CountryCode: USA

FA4897 366 CONS PKP

ADMIN ONLY NO REQTN CP 208 828 4658, 366 GUNFIGHTER AVE STE

MOUNTAIN HOME AFB, ID 83648-5296

UNITED STATES

SrA Deivid Baez Email: deivid.baez.co@us.af.mil Telephone: 2088283115

Inspection Location

Inspection Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F3F3CE CountryCode: USA

366 CES CERF

AF BPN NO MILSBILLS PROCESSES, 1010 LIBERATOR ST

MOUNTAIN HOME AFB, ID 83648-5442

UNITED STATES

Jeffery Jackson Email: jeffrey.jackson.3@us.af.mil Telephone: 2088284009

Acceptance Location

Acceptance Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: FA4897 CountryCode: USA

FA4897 366 CONS PKP

ADMIN ONLY NO REQTN CP 208 828 4658, 366 GUNFIGHTER AVE STE

MOUNTAIN HOME AFB, ID 83648-5296

UNITED STATES

SrA Deivid Baez Email: deivid.baez.co@us.af.mil Telephone: 2088283115

Inspection Location

Inspection Destination Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.

DoDAAC: F3F3CE CountryCode: USA

366 CES CERF

AF BPN NO MILSBILLS PROCESSES, 1010 LIBERATOR ST

MOUNTAIN HOME AFB, ID 83648-5442

UNITED STATES

Jeffery Jackson Email: jeffrey.jackson.3@us.af.mil Telephone: 2088284009

Section F - Deliveries or Performance Overall Contract Delivery Period

Line Item Delivery Schedule Quantity Address and POC

Delivery Schedule From date of lead time event to completion of performance 90 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F3F3CE CountryCode: USA

366 CES CERF

AF BPN NO MILSBILLS PROCESSES, 1010 LIBERATOR ST

MOUNTAIN HOME AFB, ID 83648-5442

UNITED STATES

Jeffery Jackson Email: jeffrey.jackson.3@us.af.mil Telephone: 2088284009

Delivery Schedule From date of lead time event to completion of performance 90 Calendar Days Date of Notice to Proceed Receipt

1 Job Place of Performance DoDAAC: F3F3CE CountryCode: USA

366 CES CERF

AF BPN NO MILSBILLS PROCESSES, 1010 LIBERATOR ST

MOUNTAIN HOME AFB, ID 83648-5442

UNITED STATES

Jeffery Jackson Email: jeffrey.jackson.3@us.af.mil Telephone: 2088284009

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six-position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Electronic invoicing.

Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before WAWF training.

submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol. WAWF methods of document submission.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract WAWF payment instructions.

or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

Construction and Facilities Management Invoice

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Construction and Facilities Management Invoice

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment Document routing.

requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC F87700

Issue By DoDAAC FA4897

Admin DoDAAC FA4897

Inspect By DoDAAC ____

Ship To Code ____

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) FA4897

Service Acceptor (DoDAAC) FA4897

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the Payment request.

payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

deivid.baez.1@us.af.mil

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

Section I - Contract Clauses

RFO Clauses Incorporatedby Reference

Title Effective Date Alternate/ Deviation Variation

Effective Date

52.222-8 Payrolls and Basic Records. (Deviation2026-O0038) Feb2026

RFO Clauses Incorporatedby Full Text

52.225-9 BuyAmerican-Construction Materials. (Deviation 2026-O0038) (Feb 2026)

Buy American-Construction Materials (Feb 2026) (Deviation 2026-O0038)

(a) Denitions. As used inthis clause-

Commercially available off-the-shelf (COTS) item-

(1) Means any item of supply (including construction material) that is-

(i) A commercialproduct (as dened in paragraph (1) of the denition of "commercialproduct" at Federal Acquisition

Regulation (FAR) 2.101);

(ii) Sold in substantialquantities in the commercial marketplace; and

(iii) Offered to theGovernment, under a contract or subcontract at any tier, without modication,in the same form in which it is sold in the commercial marketplace; and

(2) Does not include bulk cargo, as dened in 46 U.S.C. 40102(4), such asagricultural products and petroleum products.

"Construction material" means an article, material, or supplybrought to the construction site by the Contractor or a subcontractor forincorporation into the building or work. The term also includes an item broughtto the site preassembled from articles, materials, or supplies. However,emergency life safety systems, such as emergency lighting, re alarm, and audioevacuation systems, that are discrete systems incorporated into a publicbuilding or work and that are produced as complete systems, are evaluated as asingle and distinct construction material regardless of when or how theindividual parts or components of those systems are delivered to theconstruction site. Materials purchased directly by the Government are supplies,not construction material.

Cost of components means-

(1) For components purchased by the Contractor, the acquisition cost,including transportation costs to the place of incorporation into theconstruction material (whether or not such costs are paid to a domestic rm),and any applicable duty (whether or not a duty-free entry certicate isissued); or

(2) For components manufactured by the Contractor, all costs associatedwith the manufacture of the component, including transportation costs asdescribed in paragraph

(1) of this denition, plusallocable overhead costs, but excluding prot. Cost of components does notinclude any costs associated with the manufacture of the construction material.

Critical component means a component that is mined, produced, ormanufactured in the United States and deemed critical to the U.S. supply chain.The list of critical components is at FAR 25.105.

Criticalitem means a domestic construction material or domestic end product that isdeemed critical to U.S. supply chain resiliency. The list of critical items isat FAR 25.105.

Domestic construction material means-

(1) For constructionmaterial that does not consist wholly or predominantly of iron or steel or acombination of both-

(i) Anunmanufactured construction material mined or produced in the United States; or

(ii) A construction materialmanufactured in the United States, if-

(A) The cost of itscomponents mined, produced, or manufactured in the United States exceeds 60percent of the cost of all its components, except that the percentage will be65 percent for items delivered in calendar years 2024 through 2028 and 75percent for items delivered starting in calendar year 2029. Components offoreign origin of the same class or kind for which nonavailabilitydeterminations have been made are treated as domestic. Components of unknownorigin are treated as foreign; or

(B) The constructionmaterial is a COTS item; or

(2) For constructionmaterial that consists wholly or predominantly of iron or steel or acombination of both, a construction material manufactured in the United Statesif the cost of foreign iron and steel constitutes less than 5 percent of thecost of all components used in such construction material. The cost of foreigniron and steel includes but is not limited to the cost of foreign iron or steelmill products (such as bar, billet, slab, wire, plate, or sheet), castings, orforgings utilized in the manufacture of the construction material and a goodfaith estimate of the cost of all foreign iron or steel components excludingCOTS fasteners. Iron or steel components of unknown origin are treated asforeign. If the construction material contains multiple components, the cost ofall the materials used in such construction material is calculated inaccordance with the denition of "cost of components".

Fastener means a hardware device that mechanically joins or afxes two ormore objects together. Examples of fasteners are nuts, bolts, pins, rivets,nails, clips, and screws.

Foreign construction material means a construction material other than adomestic construction material.

Foreign iron and steel means iron or steel products not produced in theUnited States. Produced in the United States means that all manufacturingprocesses of the iron or steel must take place in the United States, from theinitial melting stage through the application of coatings, except metallurgicalprocesses involving renement of steel additives. The origin of the elements ofthe iron or steel is not relevant to the determination of whether it isdomestic or foreign.

Predominantly of iron or steel or a combination of both means that thecost of the iron and steel content exceeds 50 percent of the total cost of allits components. The cost of iron and steel is the cost of the iron or steelmill products (such as bar, billet, slab, wire, plate, or sheet), castings, orforgings utilized in the manufacture of the product and a good faith estimateof the cost of iron or steel components excluding COTS fasteners.

Steel means an alloy that includes at least 50 percent iron, between 0.02and 2 percent carbon, and may include other elements.

"United States"means the 50 States, the District of Columbia, and outlying areas.

(b) Domestic preference.

(1) This clauseimplements 41 U.S.C. chapter 83, Buy American, by providing a preference fordomestic construction material. In accordance with 41 U.S.C. 1907, the domesticcontent test of the Buy American statute is waived for construction materialthat is a COTS item, except that for construction material that consists whollyor predominantlyof iron or steel or a combination of both, the domestic content test is appliedonly to the iron and steel content of the construction materials, excludingCOTS fasteners. The Contractor shall use only domestic construction material inperforming this contract, except as provided in paragraphs (b)(2) and (b)(3) ofthis clause.

(1) This requirementdoes not apply to information technology that is a commercial product or to theconstruction materials or components listed by the Government as follows:

none

(2) The ContractingOfcer may add other foreign construction material to the list in paragraph(b)(2) of this clause if the

Government determines that-

(i) The cost of domesticconstruction material would be unreasonable.

(A) For domesticconstruction material that is not a critical item or does not contain criticalcomponents.

(1) The cost of aparticular domestic construction material subject to the requirements of theBuy American statute is unreasonable when the cost of such material exceeds thecost of foreign material by more than 20 percent;

(2) For constructionmaterial that is not a COTS item and does not consist wholly or predominantlyof iron or steel or a combination of both, if the cost of a particular domesticconstruction material is determined to be unreasonable or there is no domestic offerreceived, and the low offer is for foreign construction material that ismanufactured in the United States and does not exceed 55 percent domesticcontent, the Contracting Ofcer will treat the lowest offer of foreignconstruction material that exceeds 55 percent domestic content as a domesticoffer and determine whether the cost of that offer is unreasonable by applyingthe evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.

(3) The proceduresin paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January1, 2030.

(B) For domestic constructionmaterial that is a critical item or contains critical components.

(1) The cost of aparticular domestic construction material that is a critical item or containscritical components, subject to the requirements of the Buy American statute,is unreasonable when the cost of such material exceeds the cost of foreignmaterial by more than 20 percent plus the additional preference factoridentied for the critical item or construction material containing criticalcomponents listed at FAR 25.105.

(2) For constructionmaterial that does not consist wholly or predominantly of iron or steel or acombination of both, if the cost of a particular domestic construction materialis determined to be unreasonable or there is no domestic offer received, andthe low offer is for foreign construction material that does not exceed 55percent domestic content, the Contracting Ofcer will treat the lowest foreignoffer of construction material that is manufactured in the United States andexceeds 55 percent domestic content as a domestic offer, and determine whetherthe cost of that offer is unreasonable by applying the evaluation factor listedin paragraph (b)(3)(i)(B)(1) of this clause.

(3) The proceduresin paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January1, 2030.

(ii) The application of therestriction of the Buy American statute to a particular construction materialwould be impracticable or inconsistent with the public interest; or

(iii) The construction material isnot mined, produced, or manufactured in the United States in sufcient andreasonably available commercial quantities of a satisfactory quality.

(b) Request fordetermination of inapplicability of the Buy American statute. (1)

(i) Any Contractor request touse foreign construction material in accordance with paragraph (b)(3) of thisclause shall include adequate information for Government evaluation of therequest, including-

(A) A description ofthe foreign and domestic construction materials;

(B) Unit of measure;

(C) Quantity;

(D) Price;

(E) Time of deliveryor availability;

(F) Location of theconstruction project;

(G) Name and addressof the proposed supplier; and

(H) A detailedjustication of the reason for use of foreign construction materials cited inaccordance with paragraph (b)(3) of this clause.

(ii) A request based onunreasonable cost shall include a reasonable survey of the market and acompleted price comparison table in the format in paragraph

(d) of this clause.

(iii) The price of constructionmaterial shall include all delivery costs to the construction site and anyapplicable duty (whether or not a duty-free certicate may be issued).

(iv) Any Contractor request for adetermination submitted after contract award shall explain why the Contractorcould not reasonably foresee the need for such determination and could not haverequested the determination before contract award. If the Contractor does notsubmit a satisfactory explanation, the Contracting Ofcer need not make adetermination.

(2) If theGovernment determines after contract award that an exception to the BuyAmerican statute applies and the

Contracting Ofcer and the Contractornegotiate adequate consideration, the Contracting Ofcer will modify thecontract to allow use of the foreign construction material. However, when thebasis for the exception is the unreasonable price of a domestic constructionmaterial, adequate consideration is not less than the differential establishedin paragraph (b)(3)(i) of this clause.

(3) Unless theGovernment determines that an exception to the Buy American statute applies,use of foreign construction material is noncompliant with the Buy Americanstatute or Balance of Payments Program.

(c) Data. To permit evaluation ofrequests under paragraph (c) of this clause based on unreasonable cost, theContractor shall include the following information and any applicablesupporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials Price Comparison

Construction material description Unitof measure

Quantity Price (dollars)*

Item 1:

Foreign construction material.

Domestic construction material.

Item 2:

Foreign construction material.

Domestic construction material.

[* Include all delivery costs to the construction site and any applicableduty (whether or not a duty-free entry certicate is issued)].

[List name, address, telephone number, and contact for supplierssurveyed. Attach copy of response; if oral, attach summary.]

[Include other applicable supporting information.]

(End of clause)

52.225-11 BuyAmerican-Construction Materials under Trade Agreements. (Deviation 2026-O0038) (Feb 2026)

Buy American-Construction Materials under TradeAgreements (Feb 2026) (Deviation 2026-O0038)

(a) Denitions.As used in this clause-

Caribbean Basin country construction material meansa construction material that-

(1) Is wholly the growth, product, or manufacture ofa Caribbean Basin country; or

(2) In the case of a construction material thatconsists in whole or in part of materials from another country, has beensubstantially transformed in a Caribbean Basin country into a new and differentconstruction material distinct from the materials from which it wastransformed.

Commercially available off-the-shelf (COTS) item-

(1) Means any item of supply (including constructionmaterial) that is-

(i) Acommercial product (as dened in paragraph (1) of the denition of"commercial product" at Federal Acquisition

Regulation (FAR) 2.101);

(ii) Soldin substantial quantities in the commercial marketplace; and

(iii) Offeredto the Government, under a contract or subcontract at any tier, withoutmodication, in the same form in which it is sold in the commercialmarketplace; and

(2) Does not include bulk cargo, as dened in 46U.S.C. 40102(4), such as agricultural products and petroleum products.

Component means an article, material, or supplyincorporated directly into a construction material.

Construction material means an article, material, orsupply brought to the construction site by the Contractor or subcontractor forincorporation into the building or work. The term also includes an item broughtto the site preassembled from articles, materials, or supplies. However,emergency life safety systems, such as emergency lighting, re alarm, and audioevacuation systems, that are discrete systems incorporated into a publicbuilding or work and that are produced as complete systems, are evaluated as asingle and distinct construction material regardless of when or how theindividual parts or components of those systems are delivered to theconstruction site. Materials purchased directly by the Government are supplies,not construction material.

Cost of components means-

(1) For components purchased by the Contractor, theacquisition cost, including transportation costs to the place of incorporationinto the construction material (whether or not such costs are paid to adomestic rm), and any applicable duty (whether or not a duty-free entrycerticate is issued); or

(2) For components manufactured by the Contractor,all costs associated with the manufacture of the component, includingtransportation costs as described in paragraph

(1) ofthis denition, plus allocable overhead costs, but excluding prot. Cost ofcomponents does not include any costs associated with the manufacture of theconstruction material.

Critical component means a component that is mined,produced, or manufactured in the United States and deemed critical to the U.S.supply chain. The list of critical components is at FAR 25.105.

Critical item means a domestic construction materialor domestic end product that is deemed critical to U.S. supply chainresiliency. The list of critical items is at FAR 25.105.

Designated country means any of the followingcountries:

(1) AWorld Trade Organization Government Procurement Agreement (WTO GPA) country(Armenia, Aruba, Australia, Austria, Belgium, Bulgaria, Canada, Croatia,Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece,Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republicof), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Moldova, Montenegro,Netherlands, New Zealand, North Macedonia, Norway, Poland, Portugal, Romania,Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, Taiwan,Ukraine, or United Kingdom);

(2) AFree Trade Agreement (FTA) country (Australia, Bahrain, Chile, Colombia, CostaRica, Dominican Republic, El

Salvador, Guatemala, Honduras, Korea (Republicof), Mexico, Morocco, Nicaragua, Oman, Panama, Peru, or Singapore);

(3) Aleast developed country (Afghanistan, Angola, Bangladesh, Benin, Bhutan,Burkina Faso, Burundi, Cambodia, Central African Republic, Chad, Comoros,Democratic Republic of Congo, Djibouti, Equatorial Guinea, Eritrea, Ethiopia,Gambia, Guinea, Guinea-Bissau, Haiti, Kiribati, Laos, Lesotho, Liberia,Madagascar, Malawi, Mali, Mauritania, Mozambique, Nepal, Niger, Rwanda, Samoa,Sao Tome and Principe, Senegal, Sierra Leone, Solomon Islands, Somalia, SouthSudan, Tanzania, Timor- Leste, Togo, Tuvalu, Uganda, Vanuatu, Yemen, or Zambia); or

(4) ACaribbean Basin country (Antigua and Barbuda, Aruba, Bahamas, Barbados, Belize,Bonaire, British Virgin Islands, Curacao, Dominica, Grenada, Guyana, Haiti,Jamaica, Montserrat, Saba, St. Kitts and Nevis, St. Lucia, St. Vincent and theGrenadines, Sint Eustatius, Sint Maarten, or Trinidad and Tobago).

Designated country construction material means aconstruction material that is a WTO GPA country construction material, an FTAcountry construction material, a least developed country construction material,or a Caribbean Basin country construction material.

Domestic construction material means-

(1) Forconstruction material that does not consist wholly or predominantly of iron orsteel or a combination of both-

(i) Anunmanufactured construction material mined or produced in the United States; or

(ii) Aconstruction material manufactured in the United States, if-

(A) Thecost of its components mined, produced, or manufactured in the United Statesexceeds 60 percent of the cost of all its components, except that thepercentage will be 65 percent for items delivered in calendar years 2024through 2028 and 75 percent for items delivered starting in calendar year 2029.Components of foreign origin of the same class or kind for whichnonavailability determinations have been made are treated as domestic.Components of unknown origin are treated as foreign; or

(B) Theconstruction material is a COTS item; or

(2) Forconstruction material that consists wholly or predominantly of iron or steel ora combination of both, a construction material manufactured in the UnitedStates if the cost of foreign iron and steel constitutes less than 5 percent ofthe cost of all components used in such construction material. The cost offoreign iron and steel includes but is not limited to the cost of foreign ironor steel mill products (such as bar, billet, slab, wire, plate, or sheet),castings, or forgings utilized in the manufacture of the construction materialand a good faith estimate of the cost of all foreign iron or steel componentsexcluding COTS fasteners. Iron or steel components of unknown origin aretreated as foreign. If the construction material contains multiple components,the cost of all the materials used in such construction material is calculatedin accordance with the denition of "cost of components".

Fastener means a hardware device that mechanicallyjoins or afxes two or more objects together. Examples of fasteners are nuts,bolts, pins, rivets, nails, clips, and screws.

Foreign construction material means a constructionmaterial other than a domestic construction material.

Foreign iron and steel means iron or steel productsnot produced in the United States. Produced in the United States means that allmanufacturing processes of the iron or steel must take place in the UnitedStates, from the initial melting stage through the application of coatings,except metallurgical processes involving renement of steel additives. Theorigin of the elements of the iron or steel is not relevant to thedetermination of whether it is domestic or foreign.

Free Trade Agreement country construction materialmeans a construction material that-

(1) Iswholly the growth, product, or manufacture of a Free Trade Agreement (FTA)country; or

(2) Inthe case of a construction material that consists in whole or in part ofmaterials from another country, has been substantially transformed in a FTAcountry into a new and different construction material distinct from thematerials from which it was transformed.

Least developed country construction material meansa construction material that-

(1) Iswholly the growth, product, or manufacture of a least developed country; or

(2) Inthe case of a construction material that consists in whole or in part ofmaterials from another country, has been substantially transformed in a leastdeveloped country into a new and different construction material distinct fromthe materials from which it was transformed.

Predominantly of iron or steel or a combination ofboth means that the cost of the iron and steel content exceeds 50 percent ofthe total cost of all its components. The cost of iron and steel is the cost ofthe iron or steel mill products (such as bar, billet, slab, wire, plate, orsheet), castings, or forgings utilized in the manufacture of the product and agood faith estimate of the cost of iron or steel components excluding COTSfasteners.

Steel means an alloy that includes at least 50percent iron, between 0.02 and 2 percent carbon, and may include otherelements.

United States means the 50 States, the District ofColumbia, and outlying areas.

WTO GPA country construction material means aconstruction material that-

(1) Iswholly the growth, product, or manufacture of a WTO GPA country; or

(2) Inthe case of a construction material that consists in whole or in part ofmaterials from another country, has been substantially transformed in a WTO GPAcountry into a new and different construction material distinct from thematerials from which it was transformed.

(b) Constructionmaterials.

(1) Thisclause implements 41 U.S.C. chapter 83, Buy American, by providing a preferencefor domestic construction material. In accordance with 41 U.S.C.1907, thedomestic content test of the Buy American statute is waived for constructionmaterial that is a COTS item, except that for construction material thatconsists wholly or predominantly of iron or steel or a combination of both, thedomestic content test is applied only to the iron and steel content of theconstruction material, excluding COTS fasteners. In addition, the ContractingOfcer has determined that the WTO GPA and Free Trade Agreements (FTAs) applyto this acquisition. Therefore, the Buy American restrictions are waived fordesignated country construction materials.

(2) The Contractor shall use only domestic ordesignated country construction material in performing this contract, except asprovided in paragraphs (b)(3) and (b)(4) of this clause.

(3) Therequirement in paragraph (b)(2) of this clause does not apply to informationtechnology that is a commercial product or to the construction materials orcomponents listed by the Government as follows:

none

(4) TheContracting Ofcer may add other foreign construction material to the list inparagraph (b)(3) of this clause if the

Government determines that-

(i) Thecost of domestic construction material would be unreasonable.

(A) Fordomestic construction material that is not a critical item or does not containcritical components.

(1) Thecost of a particular domestic construction material subject to the restrictionsof the Buy American statute is unreasonable when the cost of such materialexceeds the cost of foreign material by more than 20 percent;

(2) [Reserved]

(3) [Reserved]

(B) Fordomestic construction material that is a critical item or contains criticalcomponents.

(1) Thecost of a particular domestic construction material that is a critical item orcontains critical components, subject to the requirements of the Buy Americanstatute, is unreasonable when the cost of such material exceeds the cost offoreign material by more than 20 percent plus the additional preference factoridentied for the critical item or construction material containing criticalcomponents listed at FAR 25.105.

(2) [Reserved]

(3) [Reserved]

(ii) Theapplication of the restriction of the Buy American statute to a particularconstruction material would be impracticable or inconsistent with the publicinterest; or

(iii) Theconstruction material is not mined, produced, or manufactured in the UnitedStates in sufcient and reasonably available commercial quantities of asatisfactory quality.

(c) Requestfor determination of inapplicability of the Buy American statute. (1)

(i) AnyContractor request to use foreign construction material in accordance withparagraph (b)(4) of this clause shall include adequate information forGovernment evaluation of the request, including-

(A) Adescription of the foreign and domestic construction materials;

(B) Unitof measure;

(C) Quantity;

(D) Price;

(E) Timeof delivery or availability;

(F) Locationof the construction project;

(G) Nameand address of the proposed supplier; and

(H) Adetailed justication of the reason for use of foreign construction materialscited in accordance with paragraph (b)(3) of this clause.

(ii) Arequest based on unreasonable cost shall include a reasonable survey of themarket and a completed price comparison table in the format in paragraph (d) ofthis clause.

(iii) Theprice of construction material shall include all delivery costs to theconstruction site and any applicable duty

(whether or not a duty-freecerticate may be issued).

(iv) AnyContractor request for a determination submitted after contract award shallexplain why the Contractor could not reasonably foresee the need for suchdetermination and could not have requested the determination before contractaward. If the Contractor does not submit a satisfactory explanation, theContracting Ofcer need not make a determination.

(2) Ifthe Government determines after contract award that an exception to the BuyAmerican statute applies and the

Contracting Ofcer and the Contractornegotiate adequate consideration, the Contracting Ofcer will modify thecontract to allow use of the foreign construction material. However, when thebasis for the exception is the unreasonable price of a domestic constructionmaterial, adequate consideration is not less than the differential establishedin paragraph (b)(4)(i) of this clause.

(3) Unlessthe Government determines that an exception to the Buy American statuteapplies, use of foreign construction material is noncompliant with the BuyAmerican statute.

(d) Data.To permit evaluation of requests under paragraph (c) of this clause based onunreasonable cost, the Contractor shall include the following information andany applicable supporting data based on the survey of suppliers:

Foreign and Domestic Construction Materials PriceComparison

Construction material description Unit of measure Quantity Price (dollars)*

Item 1:

Foreign construction material.

Domestic construction material.

Item 2:

Foreign construction material.

Domestic construction material.

[* Include all delivery costs to the constructionsite and any applicable duty (whether or not a duty-free entry certicate isissued)].

[ List name, address, telephone number, and contactfor suppliers surveyed. Attach copy of response; if oral, attach summary. ]

[ Include other applicable supporting information. ]

(End of clause)

52.228-15 Performanceand Payment Bonds-Construction (Deviation 2020-O0016) (Jun 2020) Deviation 2020-O0016 (Apr 2020)

PERFORMANCE AND PAYMENTBONDS-CONSTRUCTION (APR 2020) (DEVIATION 2020-O0016)

(a) Denitions.As used in this clause-

Original contract price means the award price of thecontract; or, for requirements contracts, the price payable for the estimatedtotal quantity; or, for indenite-quantity contracts, the price payable for thespecied minimum quantity. Original contract price does not include the priceof any options, except those options exercised at the time of contract award.

(b) Amountof required bonds. Unless the resulting contract price is $150,000 or less, thesuccessful offeror shall furnish performance and payment bonds to theContracting Ofcer as follows:

(1) Performancebonds (Standard Form 25, except that no seal is required). The penal amount ofperformance bonds at the time of contract award shall be 100 percent of theoriginal contract price.

(2) Paymentbonds (Standard Form 25A, except that no seal is required). The penal amount ofpayment bonds at the time of contract award shall be 100 percent of theoriginal contract price.

(3) Additionalbond protection.

(i) TheGovernment may require additional performance and payment bond protection ifthe contract price is increased.

The increase in protection generally willequal 100 percent of the increase in contract price.

(ii) TheGovernment may secure the additional protection by directing the Contractor toincrease the penal amount of the existing bond or to obtain an additional bond.

(c) Furnishingexecuted bonds. The Contractor shall furnish all executed bonds, including anynecessary reinsurance agreements, to the Contracting Ofcer, within the timeperiod specied in the Bid Guarantee provision of the solicitation, orotherwise specied by the Contracting Ofcer, but in any event, before startingwork.

(d) Suretyor other security for bonds. The bonds shall be in the form of rm commitment,supported by corporate sureties whose names appear on the list contained inTreasury Department Circular 570, individual sureties, or by other acceptablesecurity such as postal money order, certied check, cashier's check,irrevocable letter of credit, or, in accordance with Treasury Departmentregulations, certain bonds or notes of the United States. Treasury Circular 570is published in the Federal Register or may be obtained from the U.S.Department of the Treasury, Financial Management Service, Surety Bond Branch,3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internetat http://www.fms.treas.gov/c570/.

(e) Noticeof subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of theright to sue on the payment bond is void unless it is in writing, signed by theperson whose right is waived, and executed after such person has rst furnishedlabor or material for use in the performance of the contract.

(End of clause)

Ombudsman

(a) An ombudsman has been appointedto hear and facilitate the resolution of concerns from offerors, potentialofferors, and others forthis acquisition. When requested, the ombudsman will maintain strict condentialityas to the source of the concern. The existence of the ombudsman does not affectthe authority of the program manager, contracting ofcer, or source selection ofcial. Further, the ombudsman does not participate in thee valuation of proposals, the source selection process, or the adjudicationof protests or formal contract disputes. The ombudsman may refer the interestedparty to another ofcial who can resolve the concern.

(b) Beforeconsulting with an ombudsman, interested parties must rst addresstheir concerns, issues,disagreements, and/or recommendations to the contracting ofcer forresolution. Consulting an ombudsman does not alter or postpone the timelinesfor any other processes(e.g., agency level bid protests, GAO bid protests,requests for debriengs, employee-employer actions, contests of OMB CircularA-76 competition performance decisions).

(c) If resolution cannot be made by thecontracting ofcer, the interested party may contact the ombudsman, DeputyDirector of Contracting, AFICC/KC (OL-ACC), 114 Thompson Street, Bldg 586, Room129, Langley AFB, VA23665, telephone (757) 764-5372 (DSN 574-5372) email: acc.a7k1@us.af.mil.Concerns,issues, disagreements, and recommendations that cannot be resolved at theCenter/ MAJCOM/DRU/SMC ombudsman level, may be brought by the interested partyfor further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC,1060 Air ForcePentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number(571)256-2431.

(d) The ombudsman has no authorityto render a decision that binds the agency.

(e) Do not contactthe ombudsman to request copies of the solicitation, verify offer due date, or clarify technicalrequirements. Such inquiries shall be directedto the contracting ofcer.

Contractor Access to Air Force Installations

(a) The contractor shallobtain base identication and vehicle passes, if required, for all contractor personnel who make frequentvisits to or perform work on the Departmentof the Air Force installation(s)cited in the contract.Contractor personnel are required to wear or prominentlydisplay installation identication badges or contractor-furnished, contractor identicationbadges while visiting or performing work on the installation.

(b) The contractor shall submit a written requeston company letterhead to the contracting ofcer listing the following: contractnumber, location of work site, start and stop dates, and names of employees and subcontractor employees needing accessto the base. The letterwill also specify the individual(s) authorized to sign for a requestfor base identication credentials or vehicle passes. The contractingofcer will endorse the request and forward it to the issuing base pass andregistration ofce or Security Forces for processing. When reporting to theregistration ofce, the authorized contractor individual(s) should provide avalid driver's license, current vehicle registration, valid vehicle insurancecerticate, and pass a background check to obtain a vehicle pass.

(c) During performance of the contract,the contractor shall beresponsible for obtainingrequired identication for newly assigned personnel and for prompt return of credentials and vehicle passes for any employeewho no longer requires access to the work site.

(d) When work under this contractrequires unescorted entry tocontrolled or restricted areas, unescortedentry requests will becoordinated through the Government Project .Manager

(e) Upon completion or termination of the contractor expiration of the identication passes,the prime contractor shall ensure that allbase identication passes issued to employees and subcontractor employees arereturned to the issuing ofce.

(f) The contractor shall provide an after-hours contact number or after-hours email in the Emergency Mass Notication System (EMNS)for each of their personnel, whose normal place of duty is on a DoD installationor within a DoD facility. The contractor shall comply with any additionalrequirements in DAFMAN 10-206 for emergency operational reporting. ForeignNationals may participate and may remove themselves from the Emergency MassNotication System at any time. To update information, personnel can access theglobe icon on their system desktop screens and choose the "Access Self-Service"option.

(g) Failureto comply with these requirements may result in withholding of nal payment.

Elimination of Use of Class I Ozone Depleting Substances (ODS)

(a)Contractors shall not:

(1) Provideany service or product with any specication, standard, drawing,or other documentthat requires the use of a Class I ODS inthe test, operation, or maintenance of any system, subsystem,item, component, or process; or

(2) Provideany specication, standard,drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class IODS as part of this contract/order.

(b) For the purposesof Department of the Air Force policy, the following products that are pure (i.e., they meet the relevant product specication identiedin AFI 32-7086) are Class I ODSs:

(1) Halons:1011, 1202, 1211, 1301, and 2402;

(2) Chlorouorocarbons (CFCs): CFC-11, CFC-12,CFC-13,CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212,CFC-213,CFC-214, CFC-215, CFC-216, and CFC-217,and the blends R-500,R-501, R-502, andR-503; and

(3) CarbonTetrachloride, Methyl Chloroform, and Methyl Bromide.

[NOTE: Materialthat uses one or more of theseClass I ODSs as minorconstituents do not meet the Department of the Air Force denitionof a Class I ODS.]

FAR Clauses Incorporated by Reference

Number Title Effective Date Alternate/ Deviation

Variation Effective Date

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026-O0038) Feb 2026

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026-O0038) Feb 2026 52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation 2026-O0038) Feb 2026 52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026-O0038) Feb 2026 52.222-3 Convict Labor. (Deviation 2026-O0038) Feb 2026 52.222-36 Equal Opportunity for Workers with Disabilities.

This is the start of the file's text. The full file is on GovTribe.