This Performance Work Statement (PWS) outlines a requirement for the 366th Communications Squadron at Mountain Home Air Force Base to remove abandoned and unusable copper cable infrastructure. The primary objectives include conducting a comprehensive site survey to identify outside plant (OSP) multi-pair underground and buried cables that are abandoned, deactivated, or providing marginal service. The contractor will be responsible for:

  1. Completing a detailed cable infrastructure survey, documenting cable characteristics such as cable number, size, route, length, and endpoints. 2. Proposing solutions to transfer service from degraded cables if necessary. 3. Removing identified cables and associated equipment at no cost to the government in exchange for possession of the removed materials. 4. Providing color red-line as-built drawings depicting proposed cable and equipment removal. 5. Adhering to strict environmental management, safety, and security requirements throughout the project. The PWS emphasizes comprehensive documentation, careful cable identification and removal techniques, and compliance with federal, state, and local environmental and safety regulations.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

REMOVE ABANDONED/ UNUSABLE COPPER CABLE

INFRASTRUCTURE SERVICES

366th Communications Squadron

Mountain Home Air Force Base, Idaho

THIS IS A DRAFT PWS ONLY

Performance Work Statement (PWS) for

Remove Abandoned/ Unusable Copper Cable Infrastructure Services

1. Description of Services. The contractor shall furnish all equipment, tools, materials, transportation, personnel, labor, supervision, and management to conduct an outside plant (OSP) communications cable infrastructure site survey at Mountain Home AFB(MHAFB), Idaho, to identify OSP multi-pair cables, both underground and buried, that the contractor and 366th Communications Squadron (366 CS) may be candidates for removal. Upon completion of the site survey, the contractor shall provide the 366 CS Project Manager with a site survey report with the work plan for the project to remove abandoned/ unusable copper cable underground cables. Additionally, the survey will also detail and include the bilateral option for the Contractor to remove/decommission any Time Domain Multiplexing TDM system and associated equipment. This includes the identification for the Customer what supplemental fiber projects or copper consolidation projects can be accomplished through the use of the no-cost contract or charged at a mutually agreed to price. The customer shall review and approve which cables and associated appurtenances will be removed by the contractor and any additional work over and above the copper cable removal scope. The contractor shall remove the cables and associated appurtenances (splice cases, terminals, and associated equipment.) at no cost to the Government in exchange for possession of the removed cables and appurtenances.

2. Requirements

2.1. Distribution Systems and OSP Multi-Pair Cables

2.2. Cable Infrastructure Site Survey. The contractor shall complete a cable infrastructure site survey to gather data and identify OSP multi-pair cables now occupying ducts in the underground cable plant (the manhole and duct systems) and buried cables, which are abandoned in-place (AIP), are cut somewhere along the cable route or not connected to a central office main distribution frame (MDF); deactivated (may still be connected to an IDF), but are providing no service; or are providing marginal service (due to degradation of the cables) to a limited number of users; as candidates for removal at each site to be affected by this contract. For those cables that may be providing marginal service, the contractor shall propose a solution to transfer service, if practical, to another cable so the contractor can remove the degraded cable. The site survey methodology and procedure for identifying cables, which may be candidates for removal, is at the contractor's discretion, with final approval of 366 CS. Also, 366 CS may, at the Government's sole discretion, identify the cables that the Government wants to remove. The contractor shall create a site survey report documenting all information relevant to this contract.

The report shall convey to 366 CS the contractor's conclusions and proposed course(s) of action.

366 CS personnel will review the information and identify to the contractor the cables to be removed. The report format is at the contractor's discretion; however, the report shall provide all information and instructions (text, PowerPoint/Visio sketches, drawings) to identify and document existing conditions and all tasks relevant to removing the cables. The site survey report shall include the following:

a. Cable number (unless the cable is AIP and has no number)

b. Count (unless the cable is AIP and has no count).

c. Cable size (number of pairs)

d. Cable sheath type (plastic or lead)

e. Cable route

f. Cable length of each associated segment (for example, the number of feet of each cable size that makes up the entire cable length)

g. Cable point of origin (building number)

h. Cable endpoint (building number)

2.2.1. If a cable is to be removed or terminated on an MDF, the contractor will identify the central office connector type so 366 CS can determine if the connector should be left in place.

For example, if the connector(s) is/are Cook 6800, Reliable 700, Reliable, or Cook303 rather than a " space-saver" type (like R366, R305, R399, or C-388), 366 CS may want the contactor to remove the connector rather than leave it in place because the current generation connectors make much more efficient use of vertical space than do earlier connector types.

2.2.1.1. Identify the cable to which the contractor plans to transfer service if the contractor proposes removing a degraded, but still in service, cable.

2.2.2. Cable Records for Infrastructure Site Survey. The 366 CS Project Manager (Project Manager) at MHAFB will provide the contractor with all relevant records [drawings, diagrams, maps, cable pair assignment records (CAIRS)], to the extent that they exist, in both hard copy and electronic format to identify cable routes and manhole locations; and for determining distribution throughout the areas of interest. The drawing records may be Communications and Information Systems Installation Records (CSIR) in Micro Station format or from the Cyber Infrastructure Planning System(CIPS) Visualization Component (CVC). In cases where the records are incomplete or inaccurate, the contractor shall update them to depict conditions relative to the cables the contractor recommends for removal. The records provided by the Government under this paragraph shall remain the property of the United States Government, treated as controlled unclassified information (CUI). The contractor shall return records provided by the 366 CS to the Project Manager upon contract completion.

2.2.3. Contractor Site Survey. The contractor shall submit the results of its site survey to include the estimated duct space to release and benefits provided by the project. The site survey format is at the discretion of the contractor.

2.3. Integrated Product Team (IPT) Meeting. The contractor shall chair and attend in person, a weekly IPT meeting on MHAFB that includes the 366 CS Project Manager or their representative, the 38 ES/ENIE CSI-B, and base personnel as the 366 CS/SCXP (Plans, Programs and Resources office) representative deems necessary. The contractor shall provide an agenda and a worldwide "Meet Me" teleconference capability for those that cannot attend meetings in person for the duration of the contract. The schedule of the IPT meetings shall be determined and coordinated with the 366 CS representative. The IPT provides a forum for the Government and contractor to exchange information about the current contract status, schedules, known or expected problems, and other information necessary/beneficial to ensure success and timely completion of contract requirements.

2.3.1. IPT Meeting Agenda. Unless otherwise negotiated, the contractor will provide the 366 CS Project Manager with a written agenda no later than one (1) working day before the meeting.

To the maximum extent possible, the contractor shall schedule the weekly meeting for the same time and same day of the week. The contractor shall record meeting minutes and distribute them to all participants within one (1) workday following the meeting.

2.4. CS Point of Contact (POC). 366 CS Project Manager is TSgt Levonna Shockley. If this representative changes the 366th CS will identify another 366 CS Project Manager to coordinate contractor activities.

2.5. Restoration. The contractor may be responsible for surface restoration if prior approval was not obtained and is required in order to perform cable removal work. Restoration at each location may be subject to final inspection and approval by 366th Civil Engineer personnel in accordance with (IAW) guidelines set forth by the Base Civil Engineer.

2.5.1. Grounds Restoration. The contractor, at their expense, may be responsible for grounds restoration if prior approval is not obtained prior to start of work. To include backfilling, soil compacting, reseeding, resodding, or any other necessary material and services required to restore ground conditions to the original condition IAW guidelines set forth by the BCE.

2.5.1.1. Paved Surface Restoration. The contractor, at their expense, will restore asphalt, concrete, brick, paving, and stone at locations damaged due to activities performed by the contractor. Any asphalt, concrete, street, curb, or sidewalk replacement will be in accordance with guidelines set forth by the BCE. At a minimum, the restoration shall match existing strength, color (to the extent practical), and type of material. The contractor shall perform follow-up restoration if that location is not up to its original condition due to surface settling.

2.6. Cable Removal

2.6.1. Sequence of Operations. The sequence of operations is at the contractor's discretion, with prior approval from the 366 CS Project Manager.

2.6.2. Cable Identification. The contractor shall cut no cable until it has been positively identified (by the contractor using the contractor's cable identification methodology) and approved by the 366 CS Project Manager.

2.6.3. Outside Plant Underground Multi-Pair Cable. The contractor will remove underground multi-pair cables as agreed between 366 CS and the contractor. Removal will be by the contractor's cable extraction technique. The technique will not disrupt service or damage cables not to be removed or to the manhole and duct infrastructure. If a cable cannot be removed (hung up in the duct), the contractor will cut the cable and remove the splice (if there is one) so that a minimum of three (3) feet (if possible) of cable extends from the duct into the manhole and abandon the cable in place. Cables that need to be removed back to a splice to an active cable will need to be cut out of the splice, and the splice case end cap will be replaced. The contractor will notify the 366 CS Project Manager of any cables it cannot remove.

2.6.4. Pull Line, Duct Plugs and Micro-duct. The contractor shall install a pull line in all ducts from which the cable is removed. The pull line shall be flat, woven, polyester tape, pre-lubricated, with sequential footage markings with a minimum pull strength of 1800 lbs. After installing the pull line, the duct shall be plugged with a duct plug. The pull line shall be tied to the duct plug (to the integral rope tie attachment on the plug) or in the cable rack to prevent the line from being pulled back into the duct. In certain instances, and as directed by the 366 CS, the contractor will install a 7-way and 4-way 16MM micro-duct provided by the Government in the newly vacated ducts.

2.6.5. Pumping Manholes. The contractor is responsible for pumping out manholes. The contractor will coordinate with the 366th Civil Engineer (366 CES) personnel, or the AHJ, at each site for specific practices relative to where the water to be pumped may be drained (storm drain, surrounding ground, in the street, etc.). If the water is suspected to be contaminated, the contractor will notify the 366 CS Project Manager for prior to removal for resolution.

2.6.6. Buried Multi-Pair Cable. The contractor shall survey and include in the site survey report an option to remove buried multi-pair cables the contractor believes may be candidates for extraction. Upon receipt of the site survey report, 366 CS will review the option and identify any cable(s) that may be removed by the contractor. To the extent possible, the contractor's cable extraction technique will cause no disruption of service or damage to cables not to be removed or damage to other buried utilities or infrastructure. If service is disrupted or damages caused by the contractor to cables not to be removed, the contractor shall immediately notify the 366 CS Project Manager and restore services and repair or replace the damaged cable.

2.6.7. Cables Providing Marginal Service. If either 366 CS or the contractor identifies a cable (or cables), either buried or underground, providing marginal service, the contractor shall propose a solution to transfer the service to another cable, if practical. 366 CS will determine whether or not the contractor will remove the disconnected cable. If the service transfer is deemed appropriate, the 366 CS Project Manager will determine if 366 CS maintenance personnel will make the transfers, which will consist of running jumpers on the MDF and drops in the field at the building entrance terminals, or if the contractor will make the transfers.

Regardless of who makes the transfers, the Government will provide the jumper wire for the MDF and drop wire for the field.

2.6.8. Testing. The following test procedures will apply if it is determined that the contractor will transfer service from a cable providing marginal service to another cable. The contractor will furnish all test equipment and personnel required to conduct testing. During any testing phase, the Government reserves the right to perform or observe any contractor-performed tests to ensure results conform to prescribed requirements. The contractor shall record all tests as they are accomplished and make all test sheets/results available for 366 CS Project Manager review as they are completed. The contractor shall notify the 366 CS Project Manager at least one working day before any testing and shall make available all testing standards and criteria used to accomplish the testing. All testing will be in accordance with accepted telecommunications industry standards for the cable and the type of test being conducted. The contractor will provide test reports to the 366 CS Project Manager within ten days of completing the testing.

2.6.9. Service-Transfer

2.6.9.1. Cable Faults and Splicer's Errors. Only those specific cable pairs to which service is to be transferred shall be tested for grounds, shorts, crosses, opens, splits, reverses, and transpositions. The contractor is not required to locate and repair cable faults and splicer errors in existing cable.

2.6.9.2. Direct Current Insulation Resistance. An insulation resistance measurement shall be made between a conductor and its mate and the shield on cable pairs to which service will be transferred. The contractor is not required to locate and clear low insulation resistance in the existing cable.

2.6.9.3. Shield Continuity. The contractor will verify shield electrical continuity from the MDF to each building entrance terminal (BET) in the field, which contains pairs to which service will be transferred. The contractor is not required to locate and repair the open shield in the existing cable.

2.6.9.4 Post-Transfer. The contractor will verify that service is restored for all circuits that have been transferred.

2.6.9.4.1. The contractor shall provide "From"-"To" cable information to the 366 CS Project Manager for updating the appropriate cable pair assignment records by the Government.

3. GENERAL INFORMATION

3.1. Applicable Regulations. The contractor will comply with all United States federal laws, codes, regulations, and statutes applicable in the performance of this contract. The contractor will obtain and adhere to all applicable United States federal standards. If there is a conflict between the requirements of this PWS and any applicable document identified in this paragraph or between documents, the most stringent requirement shall prevail.

3.2. Communications and Information Systems Installations Records (CSIR). The 366 CS Project Manager will provide the contractor with three (3) hard copies and an electronic copy of the cable diagrams, manhole racking diagrams, cable vault drawings, IDF drawings, and any other drawings, sketches, and records relevant to this task order as available. These drawings are for informational purposes and to assist the contractor in locating buildings and manholes and identifying cable routes. The 366 CS Project Manager will convey to the contractor all requirements relative to the plant-in-place record system to be used by ITFPP so the deliverables (See PWS paragraph 5) provided by the contractor are compatible with the plant-in-place record systems. CSIRs are the property of the United States government, will be treated as CUI, and will be returned to the United States government by the contractor at the completion of the contract.

3.3. Commercial Standards and Manuals. The contractor shall comply with the following commercial standards where applicable. The following is not an all-inclusive list. The contractor will identify and obtain other standards/manuals not listed that may be relevant to contract implementation.

NUMBER TITLE WEBSITE OR LOCATION

Building Industry Outside Plant Design Reference https://www.bicsi.org Consulting Service Manual (OPDRM) (Current Edition) International

(BICSI)

NFPA 70 (NEC) National Fire Protection Association (NFPA) https://www.nfpa.org/

IEEE Standards National Electric Safety Code (NESC) https://standards.ieee.org/products-services/nesc/index.html

3.4. State, Local, and Site-Specific Regulations. The contractor will comply with all applicable state, local, and site-specific codes, regulations, and statutes related to this contract.

3.5. Contractor Personnel.

3.5.1. Site Visit Request Letter. The contractor will process a Site Visit Request Letter through the 366 CS Project Manager. This letter shall identify the names, social security numbers (or other unique identifiers depending on the person's country of citizenship), driver's license numbers and state of issue, and date of birth of the personnel performing on this contract. This will be used to process contractor employees for base access for the work period and access to base facilities as required to perform the services under this agreement.

3.5.2. Staffing Plan. The contractor's proposal shall include a description of labor categories, the number of personnel in each category, and a short position title indicating a sufficient number of personnel required to meet all contractual obligations.

3.5.3. Key Personnel Listing. The Contractor shall provide a key personnel listing, including the Contractor's POC and contact information, to the 366 CS Project Manager before commencing work and update information continually as changes occur to ensure it is always current and correct throughout the contract's life.

3.5.4. Contract Manager. The contractor shall designate a primary Contract Manager, and at least one alternate Contract Manager who will be responsible for contractor-performed services.

The Contract Manager shall have full authority to act for the contractor on all matters relating to daily execution of the contract. Upon contract award and prior to the contract start date, the contractor shall submit the names and telephone numbers of the primary and alternate(s) Contract Managers, in writing, to the Contracting Officer. The Contract Manager must be available by phone during normal duty hours to discuss any contract issues or problem areas with about:blank about:blank

Government personnel. The Contract Manager and all other contractor employees must read, write, speak, and understand English fluently.

3.5.5. Site Lead. The contractor shall designate a Site Lead responsible for on-site interface for all worksite communications with Government personnel. The Site Lead must be on site during duty hours for the duration of the contract. The contractor shall provide the 366 CS Project Manager

3.5.6. Continuation of Essential Contractor Services. The Government has determined that the services in PWS are not mission essential and does not require continued support during crisis, as defined in accordance with the Defense Federal Acquisition Regulation Supplement (DFARS), Subpart 237.76, Continuation of Essential Contractor Services.

3.6. Quality Control Plan (QCP). The contractor will provide a QCP that includes the contractor’s approach to quality control, how the plan will be applied, and methods for handling deficiencies. The contractor will provide quality assurance support for the duration of the contract. This support shall include allowing and assisting the Government personnel in performing random spot checks. The contractor’s quality assurance representative is responsible for identifying and correcting deficiencies related to contract implementation.

3.7. Personnel Qualifications. The contractor is solely responsible for ensuring that sufficient personnel are assigned to this contract and that all personnel are experienced and qualified to perform the tasks associated with this contract.

3.8. Security Requirements

3.8.1. General. Contractor personnel employed under this contract shall meet the requirements of all security requirements addressed in this PWS. The 366th FW Information Protection (IP) office will provide oversight as the Servicing Security Activity (SSA). Sponsoring Air Force organization will ensure Integrated Visitor Groups complete all necessary security training, i.e. Information, Physical Security and Anti-Terrorism. The contractor shall ensure requirements for obtaining Contractor personnel security clearances/background checks, protecting Government property, safeguarding protected information/materials, and shielding Government AISs and non-automated information systems are met. The Contractor shall also perform in accordance with the Compliance with National Industrial Security Program Operating Manual (NISPOM).

NOTE: Not all security requirements will apply to every contract. Please reference contract agreement to determine appropriate requirements.

3.8.2. Notification of Government Security Activity. Upon performance on the military installation, the contractor will notify the SSA and/or host unit security assistant (USA) 30 days prior to contractor operations. In the event the contract starts within 30 days, the contractor will need to notify the SSA within 72 hours of contract start. The contractor shall furnish the SSA/host USA at the performance location all required information (identifying information for personnel working the contract, contract information, etc.).

3.8.2.1 Security Agreement. If deemed as a long-term contract the contractor and sub-contractors shall enter into a security agreement with host base SSA, by reviewing and signing the local security procedures documentation. This agreement shall outline how the contractor integrates security requirements for contract operations with the AF to ensure effective and economical operation on the installation.

3.8.3 Listing of Employees. The contractor shall maintain a listing of all employees performing work under this contract. The list shall be validated and signed by the Contracting Officer Representative (COR), and provided to the Contracting Officer (CO), SSA and host unit supervision. The contractor shall update the list when employees move positions, are replaced, or upon request. The Contract Manager (CM) will also provide visit notification identifying all integrated personnel regardless of clearance level. The list shall include the employees’ Names, Location of Performance, and Security Clearance.

3.8.3.1. Contractor Removal. The CO may direct the removal of a contractor employee from this contract for reasons of security or misconduct. All contractor personnel are subject to Security Forces jurisdiction and the authority of the installation commander while on USAF installations.

3.8.4. Contractor Integration. Contractor personnel will be integrated into individual host unit organizations as applicable to their respective functional position. The contractor will adhere to all wing and squadron level security policies and directives. Respective unit security assistants shall provide security administration, to include training and badging.

3.8.5. Security Support Provided by AF. Security support is provided by the AF to the contractor, including use of base destruction facilities, reproduction facilities, security badges, base visitor control, investigation of security incidents, base traffic regulations, the use of security forms and conducting inspections.

3.8.6. Off-Installation Security. In the event temporary work is required at locations other than Mountain Home Air Force Base (MHAFB), the contractor will ensure applicable security measures and processes are established with the governing SSA or government agency. Performance intended to exceed 90 days will require revision of the contract.

3.8.7. Pass and Identification Items. The Contractor shall ensure the pass and identification items required for contract performance are obtained for employees. Base identification badges will be furnished by the SSA and/or host USA for each contractor employee upon presentation of evidence of assignment. Other required badges will be furnished by the Government as necessary to complete task requirements.

3.8.7.1. Base Access. The Contractor shall provide a completed 366 SFS Form 30 for each employee requiring installation access to the Contracting Representative within five (5) business days following contract award. After approval, the Contracting Representative shall notify the Contractor, who will notify their employees that they can obtain their installation access ID at the MHAFB Visitor’s Center.

The Contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Action (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting and safeguarding For Official Use Only (FOUO) material.

Contractor personnel shall report to an appropriate authority any information or circumstances which they are aware of and may pose a threat to the security of DoD personnel, Contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.

The Contractor shall be responsible for safeguarding all Government property. At the end of each work period, all Government facilities, equipment, and materials shall be secured.

3.8.7.2. Retrieving Identification Items. The Contractor shall retrieve all identification items from employees who depart for any reason before the contract expires, e.g. terminated for cause, retirement, etc.

3.8.8. Security Clearance/Background Check. When applicable all personnel performing on this PWS will have a security clearance/background check equivalent to the requirements listed in the contract. Personnel will complete the appropriate documentation (SF-85, Questionnaire for Non- Sensitive Positions or SF-86, Questionnaire for National Security Positions) through National Background Investigation Services (NBIS) website. Documentation of a completed/adjudicated application is required prior to issuance of a Common Access Card (CAC).

3.8.9. Controlled/Restricted Areas. The Contractor shall implement local base procedures for entry to Air Force controlled/restricted areas where contractor personnel will work. When applicable an AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by the sponsoring agencies Security Manager before a Restricted Area Badge will be issued.

3.8.10. Controlled Unclassified Information. The contractor shall comply with DoDI 5200.48_DAFI16-1403, Controlled Unclassified Information, for identification, protection, and training requirements of CUI. The contractor shall be responsible for training their personnel and accomplishment of the out-processing procedures identified in DoDI 5200.48_DAFI16-1403. The contractor shall comply with DoDM 5400.07_AFMAN33-302, Freedom of Information Act (FOIA) Program, requirements. Unclassified DoD information not approved for public release on non-DoD Information Systems will be protected IAW DoDI 8582.01, Security of Non-DoD Information Systems Processing Unclassified Nonpublic DoD Information.

3.8.10.1 Foreign Disclosure. Due to the nature of the MHAFB mission, foreign integration and sensitivity of information and materials, the contractor will ensure all personnel are aware of and comply with foreign disclosure procedures. Release of CUI and Classified Military Information must be approved by the 366 FW Foreign Disclosure Officer (FDO).

3.8.11. Operations Security (OPSEC). The contractor shall comply with 366 FW OPSEC requirements and countermeasures to protect critical information as defined in AFI 10-701, Operations Security. Contractors shall receive unit specific OPSEC briefing prior to the start of work. Briefing documentation must be completed by the respective unit OPSEC coordinator. The unit OPSEC personnel will provide guidance on protecting critical information, training materials and other instructions as needed. The contractor will comply with the 366 FW OPSEC Policy that imposes a 100% shred requirement of all government related paper products using NSA approved devices only.

3.8.12. Antiterrorism (AT). IAW DFARS 252.204-7004, Antiterrorism Awareness Training for Contractors, and DoDI O-2000.16 Volume 1, DoD Antiterrorism Program Implementation: DoD Antiterrorism Standards, contractor personnel who require routine physical access to MHAFB shall complete Level I AT Awareness Training within 30 days of requiring access and annually thereafter.

Routine physical access is defined as any contractor issued a Common Access Card (CAC), any contractor having installation access for a year or more, any contractor requiring a security clearance, or any contractor requiring access to specific secure areas (e.g., SAPF, SCIF, etc.).

Level I AT training shall be complete through a DoD-sponsored/certified computer or web-based distance learning instruction, or under the instruction of a Level I AT Instructor. Contractor personnel can complete DoD Level I AT Training at https://jko.jten.mil/. If the Contractor has personnel who can’t access the DoD Level I AT Training site, they notify the COR to arrange access to the training site or to coordinate other Level I AT Training. Certificates of Completion of initial and annual training will be maintained by the prime contractor and Unit Antiterrorism Representative (UATR) and will be readily available for review as needed.

All personnel, to include contractors, on MHAFB will comply with directed/implemented Force Protection Condition (FPCON) and/or AT measures, unless specifically exempted by the 366 FW Commander (CC). Contractor personnel will submit requests for exceptions to FP/AT Measures through the COR, who will submit the request to 366 FW Antiterrorism Officer (ATO) for submittal to 366 FW/CC.

During periods of increased threat or raised FPCONs, contractor access to the installation, or specific parts of the installation, may be limited or denied. The COR will, when possible, notify contractor personnel before the limitations/restrictions are implemented. Contractor personnel will coordinate with the COR regarding possible affects limited/restricted access will have on contract completion. Contractor personnel will coordinate with the COR on assignment of Mission Critical Contractor status as needed.

During periods of increased threat or raised FPCONs, personnel, to include contractors, may be required to be escorted while on MHAFB. When being escorted, personnel will always remain with their escort. If personnel become separated from their escort, they will remain where they are and notify the 366 Security Forces Squadron (SFS) at 208-828- 2256/2257/2258.

The Contractor shall include the DFARS 252.204-7004, Antiterrorism Awareness Training for Contractors, clause as well as all other above identified AT items, in all subcontracts, including subcontracts for commercial items, when subcontractor performance requires routine physical access to MHAFB.

3.8.13. Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, contractor personnel, resources, and classified or unclassified defense information.

Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.

3.8.14. Physical Security. The Contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, all government facilities, equipment, and materials shall be secured.\

3.8.14.1 Key Control/Access Badge Control. The Contractor shall establish and implement methods of making sure all keys/badges issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The Contractor shall not duplicate any keys issued by the Government.

3.8.15. Traffic Laws. The Contractor and its employees shall comply with base traffic regulations.

3.8.16 Weapons, Firearms, and Ammunition. Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on DOD Installations.

3.8.16.1 Domestic Violence/Lautenberg Amendment. Contractor personnel who have duties in, have access to, or are otherwise involved in the storage, issue, disposition of, or transporting firearms or ammunition shall complete DD Form 2760, Qualification to Possess Firearms or Ammunition, annually. The DD Forms 2760 shall be maintained by the CM and be made available to the KO and COR office upon request. Any person who has been convicted of a crime of domestic violence is not eligible to perform these duties. All personnel have an affirmative, continuing obligation to inform their supervisors if they have, or later obtain, a qualifying conviction. Candidates selected to fill these positions certify they have not been convicted of a crime of domestic violence, or who is subject to a protective order for domestic violence prior to assuming the duties of the position. These activities are covered by 18 U.S.C. § 922.

4. Government Furnished Services (GFS).

4.2. Emergency Services. The Government will provide security forces services (call 208-828- 8501 & 208-828-2251 for emergencies only), and fire protection services (call 208-828-6292).

There are no emergency medical services available on MHAFB, therefore the contractor must call 208-590-6962 for emergency medical services.

5. Deliverables

5.1. Required Deliverables. All deliverables are subject to Government acceptance and approval. They shall meet professional standards and the requirements outlined in this PWS. All deliverables shall be produced using recommended versions as accepted by the Government. The contractor shall submit the following deliverables electronically.

5.2. Site Survey Report. The contractor shall provide a site survey report as outlined in this document.

5.3. As-Built Drawings. Any existing as-built amendments relevant to this task order will be provided to the contractor by 366 CS Project Manager. The contractor shall provide color red-line (as-built) drawings, with the site survey report, which depict the proposed removal of cables (both buried and underground) and associated equipment (building entrance terminals, central office connectors, etc.).

5.4. Schedule. The contractor shall provide a milestone schedule that denotes significant activities, including time-phased start and completion dates.

5.5. Status Report. The contractor will submit a weekly report indicating project progress/status and listing any deficiencies detected and corrective action taken.

6.0. Environmental Protection Compliance

6.1. Environmental Management. The contractor will comply with the most stringent environmental federal, state, and local laws and regulations and Air Force policies, instructions, and plans. The United States Government is not exempt from compliance with environmental regulations. The contractor shall maintain an awareness of changing environmental regulatory requirements to avoid environmental deficiencies for activities on MHAFB during the work associated with this contract.

6.2. Adherence to the MHAFB Contractor Environmental Guide (CEG). Adherence to CEG is mandatory and will help increase the contractor’s awareness of the installation’s Environmental Management System (EMS) and environmental regulatory requirements that impact MHAFB. The guide covers the significant environmental aspects and impacts that contractors often influence at MHAFB. A list of these aspects can be found in Appendix F, Environmental Management System (EMS) Most Significant Environmental Aspects Awareness Form, of the guide. Upon contract award, the contractor shall complete Appendix F and submit it to the Contracting Officer. The CEG is available in the attachments of the solicitation.

6.3. Environmental Management System (EMS) Awareness Training. The contractor shall comply with the MHAFB CEG in completing the required EMS Awareness Training prior to start of work. The training is a requirement for project managers, on-site managers, supervisors, and contractor personnel who have a direct influence on the significant aspects identified in Appendix F of the guide. Training registration and login instructions can be found in Appendix E, EMS Awareness Level Training Login and Registration Instructions, of the CEG. The contractor shall submit a completed copy of the training certificate along with Appendix F to the Contracting Officer upon contract award to document completion of training.

6.4. Environmental Laws and Regulations. The contractor shall comply with all applicable Federal, State, and local laws, regulations, and requirements regarding environmental protection.

In the event environmental laws/regulations/requirements change during the term of the contract, the contractor shall comply with such law/regulation as changed. The contractor is responsible for any penalties, fines, etc. resulting from violations. The contractor shall immediately notify the COR when violations occur, and cooperate fully with fire department personnel and Government investigators.

6.5. Environmental Permits. Contractors shall comply with all regulatory requirements to include permits if applicable. Elmore County Department of Environmental Quality (EDEQ) and Idaho Department of Environmental Quality (IDEQ) require permits for asbestos removal or demolition as well as projects that require earth-moving or soil disturbance. These requirements may include storm protections. The contractor shall treat areas subject to dust producing activities with liquid palliatives which will not harm regrowth of vegetation, or other methods of dust control. The contractor shall also ensure methods to protect native plants, birds and wildlife are included in projects where required. All permit costs shall be considered as having been included as a factor in the contractor's bid price.

6.6. Hazardous Materials/Waste. The contractor shall be responsible for the proper management of both hazardous and non-hazardous waste. The contractor shall segregate hazardous or regulated materials and non- hazardous or non-regulated materials and handle, transport, store, and dispose of those materials, in accordance with the Resource Conservation and Recovery Act, all applicable federal, state, and local statutes and regulations, and in accordance with Appendix C, Hazardous, PCB, and Universal Waste: Proper Management and Disposal, of the CEG. The contractor shall coordinate all hazardous shipments with the 366th Civil Engineer Squadron Hazardous Waste Program Manager (366 CES/CEIE) at 828-2726.

6.7. Hazardous Material (HAZMAT) Handling. The contractor shall have approval from Hazardous Waste Program Manager (366 CES/CEIE) at 828-6351 in accordance with the CEG, prior to handling, using, and storing any chemicals, solvents, lubricants, and other products that require Safety Data Sheet (SDS) or Material Safety Data Sheet (MSDS) on the installation. The contractor shall plan, fill out, and submit a HAZMAT worksheet to the COR prior to bringing HAZMAT on the base - see Appendix A, Guidance For Submission Of Safety Data Sheets For Hazardous Material (HAZMAT) and Reporting of Hazmat Usage, and Attachment(s) A-1 to A-3 of the CEG for details. The contractor shall maintain one copy of the MSDS’s for each HAZMAT line item used within the work center.

6.8. Prohibited Substances/Chemicals. The contractor shall not use products that are, or contain Extremely Hazardous Substances (EHS), Ozone Depleting Substances (ODS), and/or Persistent Bio-accumulative and Toxic (PBT) chemicals. Any HAZMAT containing one of these banned substances will not be allowed on base. Contact the MHAFB Environmental Office (366 CES/CEIE) at 828-2726 if you have any questions on materials.

6.9. Hazardous Materials/Waste Spills. The contractor shall take every reasonable precaution to prevent spills of HAZMAT, and immediately report any HAZMAT spills to the COR and base fire department by calling 828-6351 in accordance with Appendix J, HAZMAT Incident Response Procedures, of the MHAFB Spill Prevention, Control, and Countermeasure (SPCC) Plan. The contractor shall comply with this plan when handling and storing all oils and fuels. The Government Project Manager will provide the SPCC Plan to the contractor, upon contract award.

The contractor shall clean and dispose of all HAZMAT spills in accordance with local, state, and federal laws and regulations and the CEG. The contractor shall bear full financial obligation incurred from cleaning and disposing of HAZMAT spills, or release of HAZMAT within the confines of MHAFB by contractor employees.

6.10. Spill Containment Kits. The contractor shall ensure that all vehicles used for transport of HAZMAT on MHAFB, carry a spill containment kit capable of containing a spill, until first responders arrive. The contractor shall make spill containment kits available for inspection by Government personnel, upon request.