This document contains a statement of work and sources sought notice for a roof repair project at Mountain Home Air Force Base. The statement of work outlines requirements to procure and install approximately 1,000 square feet of new metal roof panels and 490 panel clips to match existing panels at Gymnasium 2371 within 30 days. The sources sought notice requests capability statements from small businesses by February 23, 2024 to inform planning for the roof repair project. Interested firms should describe relevant experience and estimated timelines. Responses should be emailed to the listed contracting officer and contract specialist at the 366th Financial Acquisition Squadron of the Department of the Air Force Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B2371 Sec J Current.jpeg | JPEG file | |
| 2371 roof repair drawing.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Title: Repair Metal Roof Section J, Facility 2371
Facility: Base Gymnasium 2371 Period of Performance: 30 days Liquidated Damages: Does not apply to this project Submittals: None Government Furnished Material: None
Work requirements:
Contractor shall procure and install metal roof panels on Gymnasium 2371 to match the existing panels and as shown on attached drawing, approximately 1,000 square feet (approximate area of work highlighted). The Standing Seam Metal Roof Panels are approximately 16” wide X 90’ long.
No asbestos or lead based materials are expected to be encountered during construction.
Repair the roof at Gymnasium 2371 by removing and replacing roof panels (see attached drawing).
Metal roofing materials removed may be disposed of at base recycle center. Re-install all trim metal that had to be removed to enable installation of the new panels. In addition, install approximately 490 panel clips 16 inches on center over each metal roof panel (approximate area of work identified in attached drawing).
The following requirements are part of this project:
1. All materials shall be installed in accordance with manufacturer’s recommendations and installations instructions.
2. Environmental: All work shall be in accordance with latest Mountain Home AFB Environmental Specifications.
3. Safety: All work shall be in accordance with OSHA regulations.
4. During construction the building will remain occupied. Contractor shall provide protection for building occupants entering or leaving the building as necessary. Contractor shall also protect and ensure water does not enter the building and shall be responsible for any damages caused by construction.
5. Clean up project area after repair work complete.