Performance Work Statement - Wastewater Removal Final.pdf
PDF 136 KB Posted
- Attached to
- Waste Water / Grey Water Removal Federal contract opportunity
- Solicitation number
- FA489724QC080
About this file
This document is a Performance Work Statement (PWS) for Wastewater Removal Services at Mountain Home Air Force Base in Idaho. The contractor shall provide all personnel, equipment, and services necessary to remove black and gray wastewater from the bed down site at Wendover Airfield, Utah from 15 October to 03 November. The estimated quantities of wastewater range from 3,000 to 21,000 gallons per day. The contractor must follow all applicable regulations, coordinate with government personnel for access, and dispose of the wastewater properly. The government reserves the right to modify the work requirements as needed. Quality control and assurance procedures are outlined, and the contractor shall not interfere with regular government operations.
The related federal contract opportunity is a combined synopsis/solicitation for Waste Water / Grey Water Removal services, issued as a Total Small Business Set-Aside Request for Quotation (RFQ). The solicitation number is FA489724QC080, and responses are due by 10:00 AM MST on 16 September 2024. The Department of the Air Force Air Combat Command is the procuring agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Wage Determination.pdf | ||
| COMBO - Waste Water Removal Final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work
Statement (PWS)
For
Wastewater Removal
Services
Mountain Home AFB (MHAFB), ID
7 OCT 2024
1. GENERAL INFORMATION.
1.1. Description of Work. The contractor shall provide all personnel, labor, supervision, management, supplies, tools, equipment, parts, materials, transportation, shipping & delivery, and all other items and services necessary to remove black and gray wastewater from the bed down site at Wendover Airfield, Utah, from 15 October to 03 November. All work shall be accomplished in accordance with this Performance Work Statement (PWS), and all applicable federal, state, local laws, regulations, manufacturer’s specifications, and commercial practices.
1.2. Contract Changes/Additional Work. At future dates, the government reserves the right to incorporate, add, remove, and/or modify quantities of work within the scope of this requirement.
At times, due to the nature of work, it may be necessary to modify this requirement on an as-needed basis. Additionally, there may be a need for ‘one-time’ requirements or special sub-contracting opportunities in order to fulfill the requirement needs. Any future changes to this requirement will be negotiated and incorporated in the contract via contract modification, whether by negotiation, or based on priced line items currently incorporated within the contract.
1.3. Publications. The contractor shall perform all work associated with this requirement in accordance with all applicable OSHA and Environmental publications. The latest editions of the following publications and standards shall apply.
1.4. Hours of Operation. The contractor shall be available 7 days/week on an as needed basis.
Immediate responses to any “as needed” service calls are not required, but a response within a reasonable amount of time considering the site’s location is required (four hours maximum).
The storage bladder shall be pumped and emptied once every evening (1400-1600) to avoid freezing temperatures. These are the “normal” hours of operation.
1.4.1. Holidays/weekends. The contractor is required to provide normal services/work during weekends. No federal holidays occur during the period of performance for this requirement.
2. REQUIREMENTS.
The contractor shall completely empty the (1) wastewater storage bladder (25K Capacity) located at Wendover Airfield, Utah, each evening from 15 October to 03 November, including weekends. Estimated quantities are shown above. The contractor must coordinate with government personnel for access and escort to the site as it is located in a secure area. All wastewater must be disposed of IAW applicable local and federal guidelines.
The enclosed bladder has a standard quick disconnect connection for contractor trucks to hook up to. Contractor personnel must closely monitor the waste tank when suction is applied. The enclosed bladder must be suctioned from the bottom gate valve with the gate valve at the top of the bladder opened when suction is applied.
All wastewater from portable latrines and kitchen will be collected in (1) 25K capacity enclosed storage bladder. This bladder requires emptying each evening to avoid overfilling and freezing.
Estimated quantities of waste are shown:
October 15th – estimated 3,000 gallons.
October 16th-17th – estimated 7,200 gallons.
October 18th-19th – estimated 11,400 gallons.
October 20th – 16,000 gallons.
October 21st-November 1st – estimated 21,000 gallons.
November 2nd – 3rd – 7,200 gallons.
The quantities above are an estimate and only intended to provide a scope of the requirement and are subject to change. The government intends to only pay for services rendered (per gallon).
3. SURVEILLANCE & QUALITY ASSURANCE.
3.1. Quality Control. The contractor shall employ their commercial quality control program and procedures to identify, prevent, and ensure non-recurrence of defective services. Through implementation of the contractor’s quality control program/procedures, the Government shall receive quality services meeting the requirements of this contract. All quality control records shall be kept and made available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.
3.2. Quality Assurance. The Government may use various quality assurance methods to determine the contractor’s compliance with the PWS and the contract requirements in accordance with FAR Clause 52.212-4, Contract Terms and Conditions – Commercial Items (a)
Inspection/Acceptance.
3.3. Re-Performance of Non-Conforming Work. Upon inspection of work, any work found to not be in accordance with this PWS/contract shall be re-performed by the contractor at no additional cost to the government.
4. CONTRACT ADMINISTRATION. During performance under contract, the contractor shall participate in administrative tasks inherent to the administration, surveillance, and oversight of contract performance.
4.1. Contract Employees. All contract personnel must be able to read, write, speak, and understand English fluently. Contract personnel shall present a neat appearance, and be easily identified as a contract employee. The contractor shall not employ persons for work on this contract identified to the contractor as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population. Each employee will be easily identified by wearing distinctive clothing bearing the name of the company or by wearing appropriate badges that contain the company name and employee name(s). The contractor shall not employ any person who is an employee of the Government, if employing that person would create a conflict of interest.
4.2. Interferences. The contractor shall not unduly interfere with regular scheduled government operational activities in the performance of contract requirements. In the event a government supervisor so requests, the contractor shall temporarily cease work in the area and report the issue, to include the name of the government personnel involved to Contracting Officer immediately. The contractor shall notify the Contracting Officer verbally of disputes with customers or other base contractors and follow-up in writing.
4.3. Records Management. The contractor shall create, handle, and maintain records for the
Air Force, regardless of medium, in accordance with the requirements established in AFRIMS
Records Disposition Schedule (RDS), AFI 33-322, Records Manage Program, AFI 33-364, Records Disposition Procedures and Responsibilities, and AFM 33-363, Management of
Records. Full text versions of these publications are available for free download at http://www.e-publishing.af.mil. Inquiries as to the specific actions necessary to meet the requirements established in the above referenced publication may be directed to the Mountain
Home Records Management Office at 366 CS/SCOKR, Bldg. 512, Mountain Home AFB, ID, 83648.
5.0. ENVIRONMENTAL CONTROLS.
5.1. Material Storage and Handling. The contractor shall follow applicable guidelines and professional recommendations for cleanliness and materials handling.
5.2. Notification of Environmental Spills. If a spill occurs, the person discovering the spill will make every effort to stop the product flow (if possible), warn personnel, shut off ignition sources, contain the spill, make notifications, and begin cleanup. If the spill is considered an emergency and there is a potential life, health, or other safety hazard, the Local Fire Department will be notified IMMEDIATELY. Recovered product and contaminated materials will be packaged and staged for disposal in accordance with the applicable hazardous waste procedures. Contact the Environmental Office (208-828-6351) for guidance. The liability for the spill or release of such substances rests solely with the contractor and its agent.
5.3. Waste. Identify, label, handle, store, and dispose of hazardous waste or debris in accordance with federal, state, and local regulations. Ensure all waste has undergone the appropriate hazardous waste determination and documentation is retained for these determinations. All hazardous waste generated must be disposed of at an approved treatment storage or disposal facility. Do not dispose of hazardous waste on Government property. Do not discharge any waste to a sanitary sewer, storm drain, or to surface waters or conduct waste treatment or disposal on Government property without written approval of the Contracting Officer and
Environmental. Consult with the Hazardous Waste Program Manager (366 FW/A7IE) at 208-
828-1684/6351 prior to disposal of any waste.
6. SECURITY, OPSEC, & ANTITERRORISM. All contract employees shall carry contractor photo identification at all times. Contractor employees shall comply with any base security measures implemented at all times. This includes, but is not limited to, vehicle and goods searches and identification checks during times of increased security.
6.1. Operations Security: The contractor shall comply with 366 FW OPSEC requirements and countermeasures to protect critical information as defined in AFI 10-701, Operations Security.
ADDITIONAL INFO:
The wastewater we're producing qualifies as a biohazard due to its content of over 1% solids. It is regulated under RCRA rules and remains very pumpable. This waste includes black water from latrines and grey water from showers, with human waste (fecal matter and urine) present.
The fecal matter alone results in more than 1% solid waste.
File details come from the government source that posted it. Updated .