This document provides responses to industry questions regarding Solicitation FA489024RACCM for Aviation Command and Control Operations and Maintenance (ACCOMS) II services. Key details include responses to 77 questions on requirements clarification, primarily relating to locations and services in Iraq, the pricing matrix, and optional locations/CLINs. The solicitation involves providing ATC, airfield management, and equipment maintenance at multiple DoD sites in Southwest Asia and requires an organizational chart and pricing for optional locations in the proposal. The response date was extended to March 5, 2024 to allow consideration of the answers. Pricing is to be provided using the revised Section L & M pricing matrix, which offers flexibility to propose positions. Insurance requirements were also clarified.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 FA489024R0008 Aviation Command and Control Operations and Maintenance Services (ACCOMS) II Questions and Answers - 6 Feb 2024
| No. | Reference (i.e. document - PWS) | Reference Text (i.e. paragraph #) | Vendor Question/Comment | Government Response |
| 1 | PWS | Where do Iraq resources get their PPE? | Contractors based in Iraq shall get their PPE from either Ali Al Salem or Al Udeid prior to entering Iraq. Specific PPE issued will be based on current FPCON Levels and Threat Levels at each location in Iraq. Contractors departing Iraq that are not forecasted to return (i.e. departing the Contract, assigned to a different base outside of Iraq, etc.) shall return their PPE to the issuing base. | |
| 2 | Section L - 4.2.2 | This section indicates proposals are due on February 13, 2024, but the Sam.Gov posting summary indicates February 19th. Please clarify which date is accurate. | Proposal due dates have been removed from Section L of the solicitation. | |
| 3 | Posting | The Sam.Gov posting indicates the proposals are due on February 19th, which is a Federal Holiday. We respectfully request that the due date be changed to at least February 20th, 2024. | The proposal due date has been extended to 5 Mar 2024. | |
| 4 | Section L 5 | The numerous spreadsheets required to provide each manning position's annual work capability as well as workload analysis (L 7.2.4.2 and 7.2.5.3) and also schedule information can take up dozens of pages. Given the Technical Volume is only 75 page, we respectfully request that we be allowed to insert a link to an Excel workbook which would contain these numerous pages. | A summary of the annual work capability and workload analysis must be included in the 75 page limit for the Technical Volume. However, a detail breakdown of the analysis/data can be included as embeded (or linked) spreadsheets, and will be considered supporting information. The Excel spreadsheets will count as one (1) page each toward the 75 page limit stated in Section L-5.6. for Volume II: Factor 4 - Technical Solution. Section L-7.2.5.2 and L-7.2.5.3 have been revised to reflect the changes. | |
| 5 | Section L 6.3 | Is the Excel spreadsheet showing all Phase In actions to be considered within the 15 Page limit for Training, Certification and Transition? We respectfully request that it NOT be included within that page limit as a very detailed, site specific plan is more than 15 pages on it's own and shortening it could lead to Phase In challenges. | The Excel spreadsheet required by Section L-6.3.2.2 will count as one (1) page toward the 15 page limit stated in section L-5.6 for Volume I: Factor 3 - Training, Certification and Transition. Section L-6.3.2.2 has been revised to reflect the change. | |
| 6 | Section L.9.4 | Can a major subcontractor submit detailed pricing information, including their Professional Compensation Plan, directly to the government? This information is considered proprietary and would not normally be shared with the prime contractor. | Yes, major subcontractors may submit detailed pricing information considered proprietary directly to the Government. Any submissions from subcontractors after the proposal due date will be considered non-responsive and omitted from evaluation. | |
| 7 | PWS Section 3.1.13 | Numbering goes from 3.1.13.2.2.1 to 3.1.12.2.2.2….should be 3.1.13.2.2.2, etc… | Concur, the PWS has been corrected to reflect the change. | |
| 8 | L.6.3.2.2 | This sentence indicates that the phase-in plan must include “An Excel spreadsheet that clearly depicts all Phase-In actions with start and completion dates which ensures the Offeror will be prepared for full performance on the contract start date.” Yet Section L.4.2.1 says Excel spreadsheet only in Price volume. | Concur, section L 4.2.1 has been revised to allow submittal of the Excel spreadsheet associated with section L 6.3.2.2. | |
| 9 | PWS | Please provide details about the living situation a contractor's resources would experience at Erbil - tents, ISO shelter, trailers? How many people per structure? | Contractors living On-base at Erbil would be living in trailers. Hotels are available in the local Erbil area, and offerors may include off base lodging at their discretion as appropriate with their business approach. | |
| 10 | PWS | For Iraq, it is our understanding that significant travel delays frequently occur due to issues with the MilAir flights between Al Asad and Erbil - the flights are unscheduled and often overfull (so a contractor resource may have to wait several days for another flight to arrive). Will the government allow a waiver to a contractor whose staffing levels are impacted due to these delays? | Government caused delays are not counted against the Contractor in terms of staffing levels. Please note: Commercial flights are available into Erbil. Currently the avg wait for flights between Erbil and Al Asad is 2 days and are dependent upon MilAir missions between Erbil and Al Asad. Contractor personnel have flown from Erbil to Al Asad on the same day or have had to wait 1 - 3 days dependent on when they arrive in Erbil. However, Contractors shall schedule/plan leave, and other forecasted absences to account for travel to avoid staffing shortages (i.e. avoid scheduling employee leave departure back to back with expected arrival of another employee). | |
| 11 | PWS | Will be there be any information that the government desires to access through the MIS that is designated export controlled or CUI? | No for export controlled. |
Yes for CUI.
| 12 | Pricing Model | Can positions be added to the pricing model? In addition, can positions that are currently blended on the pricing model be separated? | Offerors may adjust the pricing matrix to fit their proposed staffing solution. However, it is the responsibility of the offerors to ensure all formulas are correct in their submittal. | |
| 13 | PWS 4.3.2 | ATC Tower/Radar Facility Operations Air Traffic Manager (ATM) - This paragraph was added and it assumes the duty of the Chief Controller. The pricing model doesn’t have ATM listed but does list a CCTLR. Please clarify. | Chief Controller and ATM are the same position. The pricing matrix has been updated to reflect this. | |
| 14 | PWS | PWS 4.2.8.2,4.2.15.2, & 4.2.20 |
and Appendix G:
Tables G-14, G-15, & G-16 PWS sections 4.2.8.2, 4.2.15.2, and 4.2.20.2 call for TPS-75 services as optional. Corresponding Appendix G site tables G-14, G-15, and G-16 appear to call for a required onsite TPS-75 SME for 2 systems and optional 24/7 support for one or two systems.
| Is this assumption correct, or is the SME support optional also? | TPS-75 SME support is required. Full TPS-75 maintenance services are optional at this time. The PWS has been revised to reflect the difference in requirements. | |||
| 15 | PWS | PWS 4.2.24.2 | PWS 4.2.24.2 states: One (1) C2 Equipment/Maintenance/Technical Representative/SME position. Location of performance will be at Kingpin MOC, Shaw AFB, SC. Services will be required IAW XXX. |
| What is XXX referencing? | The PWS has been revised to add paragraph 4.5.1.27 to describe the duties and responsibilities. Additionally, please see Appendix F Paragraph 5, for position description. | ||
| 16 | General | In performing our due diligence to prepare for the release of the ACCOM II bid, we have learned that the travel |
and living arrangements in Iraq have changed significantly in recent years. Resources traveling to Al Asad must go through Erbil and stay in an unguarded local hotel to await a military flight to Al Asad. This military flight is not conducted daily and the waiting period changes from week to week. This uncertainty wreaks havoc in managing the duty schedules to ensure the facility is fully staffed, operating within AFI and FAA regulations, and that personnel receive their allocated annual vacations per their employment agreement.
When personnel are trying to schedule leave or departures, the lack of scheduled milair transport creates issues for personnel as they have no real idea of when their forecasted vacation or repatriation to the US will be and their plane ticket prices are far higher than they would be if they could be scheduled in advance.
In addition, resources stationed at Erbil have experienced such risk while living in tents on the Erbil military base that the current contractor has chosen to move them all to unguarded hotels in downtown Erbil. Erbil of course is in northern Iraq which is specifically referenced in current US Travel Department warnings as an area that US Citizens should avoid due to “continued threat of attacks by terrorist groups, armed conflict, aerial bombardment, and civil unrest”. (US State Department Iraqi Travel Advisory, 10/22/2023). The situation in Erbil makes recruiting and retaining quality personnel an even greater challenge.
We are gravely concerned about these travel and living scenarios and hope that AMIC can offer some guidance on travel options and force protection for the contract employees that would be assigned to Iraq under the next contract. While we have operated in war zones and in extremely dangerous scenarios for decades, our employees have always been properly protected by US military resources. We would greatly appreciate AMIC’s input on alternatives to the Iraqi travel and housing scenarios outlined here. On base lodging is the only option for Al Asad. On base lodging is authorized at Erbil, and although facilities are not permanent structures, contractors are provided the same security and protection as Military members. Offerors have the option to secure lodging outside of Erbil at their discretion (to include sites that offer private security); however, this decision is within the discretion of potential offerors to determine in developing their proposed approach to satisfying the PWS requirements.
There are no forecasted changes to the availability of military travel modes in/out of the area. Commercial flights are available into and out of Erbil, Iraq. Travel between Erbil and Al Asad is MilAir only, with an average wait time of 3 days. Wait times are dependent on personnel arrival date and the next available MilAir flight. The Government will continue to engage on this; however, potential offerors will need to include this variance in their proposed approach. Travel for mobilization/demobilization, R&R, and other travel costs associated with the FFP CLINs need to be included as ODC's in the FFP rate for each labor category.
The Government acknowledges the challenges of recruiting and maintaining qualified personnel at these locations. However, potential offerors must provide a proposed approach that will ensure success in meeting the PWS requirements. Travel Advisories are not directive guidance, and potential offerors should take this into consideration. However, it is noted that Iraqi travel advisories are not rare—in fact, they are rather common. As such, on-base housing authorized to contractor personnel affords the same security and protection as Military members.
17 Solicitation Section L & M Pricing Matrix The Section L & M Pricing Matrix appears not to have a CLIN for the C2 Equipment/Maintenance/Technical Representative/SME position.
Where should this labor be captured? The Pricing Matrix has been revised to include the MOC Tech Rep/Liaison labor category in Tab 12. Additionally, CLIN X012 and worksheet 12 have been renamed CONUS Core Rates.
Cost for this position shall be captured in worksheet "3 - Section B", and worksheet "3A - Section B Cost Build Up" against CLIN X012 - CONUS Core Rates. Additionally, hourly rate shall be captured in worksheet 12 - CONUS Core Rates.
18 Solicitation PWS Solicitation Section B and PWS Table 7.1 The Period of Performance dates by contract period references in the Solicitation FA489024R0008 and PWS do not match.
| Can the Government confirm the Period of Performance dates? | The PWS has been revised to delete Table 7.1. | ||||
| 19 | General | Given the quantity of questions that remain outstanding from the draft solicitation, as well as the quantity submitted for the final solicitation, we respectfully request an extension of at least two weeks so that responses can be received and thoroughly considered before bid submission. | The solicitation response date has been extended to 5 Mar 2024. | ||
| 20 | PWS | 6.1.2 | Are contractors allowed to use the Erbil medical facilities and if so, is there a cost to the contractor? | At this time, authorizations for ALL SITES are limited to Emergency Medical Care only. | |
| 21 | PWS | 6.1.3 | Can the government a list of where contractors can eat in the dining facility and the cost per each meal? | Bahrain does not allow contractors use of DFAC. DFAC cost breakdown for locations other than Iraq meals are estimated at $19.52/day and at Iraq meals are estimated at $22.99/day. Cost reimbursement is based on 3 sign-in scans from the same customer for 3 meals/day. Prices are subject to change based on costs to operate USG DFACs. | |
| 22 | PWS | 6.1.5 | OCONUS Billeting: The section notes in part "subject to availability and local policy at each location". Can the government provide a list of the stations/sites that the contractor must lease space outside of the base for | ||
| billeting | The Misc. row in each Table of Appendix G identifies whether a the contractor must reside On-Base, may reside On-base, or must reside Off-Base. Bahrain is the only site where On-Base housing is unavailable and the contractor must reside Off-Base. | ||||
| 23 | Insurance | There is no mention of Air Traffic Control (ATC) Liability insurance, General Liability coverage, or Errors and Omissions coverage. Prior solicitations for work covered by this solicitation included government provided costs to cover these critical insurance items, recognizing the importance of the coverage and the various ways contractors might behave if they were not required to include these costs and these coverages. Each contractor was required to bid these costs and required to procure this insurance. |
General Liability, while appropriate and generally required for non-air traffic specific functions (and we recommend for this solicitation), does not cover claims or litigation arising out of air traffic control services or an accident or incident on contracts of this nature. The vast majority (if not all) of U.S. government contracts (FAA, NIWC, AFCAP, Air National Guard, US Air Force Reserve, US Coast Guard, etc.) for air traffic control require ATC Liability insurance. Absence of such coverage places the government, contractors and their employees at increased risk.
As contractors and their employees are not covered by the TORTS Act, they may face litigation should a claim or claims occur while providing service under this contract. Not requiring minimally acceptable insurance will create an unfair competition as prudent companies who work in this space will provide the necessary coverage, which may result in a higher price that is not based upon an equal evaluation of cost. A company who does not purchase an adequate insurance policy will subject its employees, as well as the government, to the risk of claims and litigation.
The US Government has previously been named in litigation cases (as well as employees, individually) where the air traffic control service provider had low or insufficient limits of liability. Further, plaintiffs tend to focus upon the defendant(s) with the greatest opportunity for collection of any potential for monetary award. If a company should receive a contract that is not properly or adequately insured, the focus of any claim or judgement will turn on the US Government and the presumed collection of any judgement against the Government.
The FAA has been contracting ATC services for decades. There have been a significant number of claims under that program since its inception. Even when the insurance requirements were specified in a solicitation, they have had companies win contracts that did not properly bid adequate (or any) insurance in an effort to keep their costs low. The FAA has been attached to multiple claims under the FAA Contract Tower Program and continues to increase its focus on adequate insurance coverage. In fact, the FAA feels so strongly about the need for ATC liability insurance that they now purchase a base policy for any contractor who receives a contract under the FAA Contract Tower Program. Moreover, based upon loss runs at “VFR only” facilities contracted by the Federal Aviation Administration throughout the U.S. legislative efforts were undertaken in recent years to significantly increase limits of liability coverage. There have been multiple litigation cases arising out of accidents within the AOR - and some are on-going. Fortunately, a proper insurance policy and adequate coverage has been in place. The absence of adequate liability coverage places the government and the entire program at increased risk. We provide this reference to stress the importance of this critical insurance coverage.
We respectfully request that you consider a requirement for both general liability insurance as well as aviation
| liability insurance in the solicitation. Based on our extensive experience in this theatre, we suggest requiring air traffic control liability insurance at a minimum of $100M (non-aggregate, secured through a reputable third party (i.e., no self-insurance). This limit is being recommended due to the requirement of providing positive control (radar) which is dramatically different than “VFR” control and, therefore, imposes an increased risk to the service provider and the government. Companies determining that 100M is insufficient would be allowed to purchase additional, or excess, insurance. However, identifying a minimally acceptable limit of liability allows the government to evaluate all fairly and based upon a specified minimum standard. We also recommend that the solicitation require that the US Government be added as an Additional Insured, which is common in this industry. | The USG will not direct/require Offerors to provide Air Traffic Control (ATC) Liability insurance, General Liability coverage, or Errors and Omissions coverage nor set a baseline minimum requirement. Insurance types and amounts are an offeror's business decision based on the offeror's risk assessment. | ||||
| 24 | PWS | PWS Paragraphs 4.3, 6.1.2. and | |||
| Appendix G | Controller personnel are required to have annual Class II medical examinations. According to paragraph 6.1.2, "All government-provided medical and dental care is reimbursable to the government." Can the government confirm that at locations not specifically identified as, "Flight Medical Services Needed", that contractors will have access to the government flight surgeon for their annual and non-recurrent flight physical needs. | Contractor can use Doc in a box with non-US citizens as the service provider. For visits that issue a Class II Flight Physical, an FAA certified flight surgeon must be seen. Contractors will not have access to a flight surgeon for their annual and non-recurrent flight physical needs. | |||
| 25 | PWS | PWS Paragraph | |||
| 6.1.2 | According to paragraph 6.1.2, "All government-provided medical and dental care is reimbursable to the | ||||
| government." Can the government provide a schedule of services and related costs. | No cost listing or schedule of services is available. | ||||
| 26 | Federal Tort Claims Act | The U.S. Supreme Court recently declined to hear the case of Badilla v. Midwest Air Traffic Control Service, Inc. As a result, the Second Circuit decision stands, and Midwest, a subcontractor performing air traffic control (ATC) work in Kabul under a program resembling ACCOM, was not immune from state law negligence claims related to wrongful death because its ATC work did not, at least in the Second Circuit, arise out of the combatant activities of the military. Does the customer recognize that, in light of this, bidder will now be forced to consider the extensive additional costs of insurance, and of defending potential lawsuits (even where the awardee or its subs are vindicated)? How does the government propose that potential bidders price this into their bids? Will the government be providing any kind of indemnity protection to would-be bidders? If not, will the government take specific steps (like offering plug numbers) to offerors to | |||
| ensure a level playing field for cost/price evaluation purposes? | The USG will not direct/require Offerors to provide Air Traffic Control (ATC) Liability insurance, General Liability coverage, or Errors and Omissions coverage nor set a baseline minimum requirement. Insurance types and amounts are an offeror's business decision based on the offeror's risk assessment. | ||||
| 27 | PWS | PWS - Appendix G-2 & G-4 | What are the specific experience and training prerequisites for technicians responsible for providing support for Uninterruptible Power Supply (UPS) equipment? | Appendix F, para 25 & 26 list UPS as part of the overall ATCALS and C2 Technicians position description. Both paragraphs also identify education, and experience requirements. Technicians shall have required experience maintaining the identified UPS systems, or equivalent in Appendix G-2 & G-4. | |
| 28 | Section_L__Instructions_to_Offerors__Conditions__and_Notices_to_Offerors | 6.2 Factor 2: Small Business Participation | Section L.6.2 states "...In addition, Offerors are required to complete the DoD Checklist for Reviewing Subcontracting Plans (Attachment 5) along with their subcontracting plan submittal." However, no Attachment 5 is provided in the solicitation package. Please provide Attachment 5. | The checklist has been included as Attachment 3 to Section L. | |
| 29 | Section_M__Evaluation_Factors_for_Award | M.3.1.2 Factor 2: Small Business Participation | Evaluation Factors 3.1.2 states, “an offeror can submit either an approved commercial plan or a negotiated DoD Comprehensive Test Program subcontracting plan as referenced in Section L.6.2 or an individual subcontracting plan.” Will the government accept a DCMA approved Master Small Business Subcontracting Program (SBSP) in place of an Individual Subcontracting Plan? | Yes, Section M-3.1.2 has been updated to reflect the change. | |
| 30 | Section_M__Evaluation_Factors_for_Award | M.3.1.2 Factor 2: Small Business Participation | Is the Small Business Subcontracting Plan to be written to the total annual CONUS subcontract value only, or the overall TCV (which includes OCONUS as well)? | The Small Business Subcontracting Plan shall be written to the annual CONUS subcontract value only. Sections L&M has been revised to reflect this. | |
| 31 | Section_L__Instructions_to_Offerors__Conditions__and_Notices_to_Offerors | 6.2 Factor 2: Small Business Participation | Are there more detailed instructions on how the Small Business Participation document needs to be completed? For example, are we to write to the total annual CONUS subcontract value only, or the overall TCV? | See answer to question 30. No further information is available. | |
| 32 | Section_L_and_M_Pricing_Matrix | Upon opening the file, the following message pops up: "There are one or more circular references where a formula refers to its own cell either directly or indirectly. This might cause them to calculate incorrectly. Try removing or changing these references, or moving the formulas to different cells." Is there an error in the file? If there is an issue, would the government please provide an updated file? | The Pricing Matrix has been revised to remove the Circular Refference. Offerors must adjust and verify accuracy of formulas and may change the Pricing Matrix to fit their accounting standards. | ||
| 33 | Solicitation___FA489024R0008 and Section_L__Instructions_to_Offerors__Conditions__and_Notices_to_Offerors | Block 9 and p. 15, 4.2.2 | Block 9 of SF 33 in Solicitation document states that proposals are due by 4:00 PM on 19 Feb 2024. In Section L, paragraph 4.2.2 on p. 3 states, "Proposals must be received no later than 1:00 PM EST on 13 February 2024." Please be advised that 19 Feb 2024 is a Federal Holiday. Due to the complicated nature of the requirements and in order to provide the best solution possible, we respectfully suggest the deadline be updated across all sections to 26 February 2024. | See answer to questions 2 and 3. | |
| 34 | Performance_Work_Statement__PWS__04_Jan_2024 | Performance Work Statement, Appendix J, p. 109 | Document shows three embedded .pdf documents that cannot be extracted: BC3-T_ULSS_v7_final_June 2016.pdf, GATR_ULSS_Vers11_20160415_Signed, and JR2_PH_II_Upgrade_ULSS_20160425_Sigr. Please provide the three documents separately. | The PWS has been revised to embed attachments into the PDF document. Obsolete attachments have been removed. | |
| 35 | Performance_Work_Statement__PWS__04_Jan_2024 | Performance Work Statement, Appendix K, p. 110 | Document shows an embedded Word file that cannot be extracted: NARAS_Architecture_System_Description_2. Please provide the document separately. | See answer to question 34. | |
| 36 | RFP Section L, Instructions for Volume IV - Price (FACTOR 6) | 9.4 The Total Professional Compensation Plan shall consist of a) Section L & M Pricing Matrix spreadsheet, and b) Professional Compensation Plan Narrative. 9.4.3 Supporting Price Backup Data. Supporting data should explain the methodology used in developing proposed CLIN prices. | Section L states "Supporting data should explain the methodology used in developing proposed CLIN prices. Supporting data shall be provided in Excel, to include, at a minimum, a breakdown (by CLIN) of labor (labor category, number of positions and productive hours and rates used), breakout of Other Direct Costs (ODC), Direct and Indirect Rates, maintenance costs and subcontract costs." To eliminate a cumbersome review of narrative within excel, please confirm this supporting data can be provided in the Compensation Plan Narrative. | Supporting narrative can be provided in the Compensation Plan Narrative. However, the price build-up and formulas must be provided in Excel format. | |
| 37 | PWS 6.1.5 of the PWS and Table 8.1 - SPOT LOA Authorization Government Life Support | ||||
| Table 8.1 SPOT LOA Authorization Government Life Support | PWS 6.1.5: OCONUS Billeting: The government will authorize contractor use of/access to on-base billeting, subject to availability and local policy at each location. At some locations, these services may be at the lower expeditionary standard (e.g., tents or shared living spaces). |
And Table 8.1 - SPOT LOA Authorization Government Life Support
| Notes 1. Contractor authorized on-base Billeting. The contractor may request permission to reside off-base for locations outside of Iraq or designated austere locations, as part of the contractor’s recruitment and retention plan. | Will the government please identify any locations where on-base housing is unavailable? | See answer to question 22. | |||
| 38 | L 4.2.1 & 6.3.2.2 | L. 4.2.1: Offeror’s proposals shall be created and saved using Microsoft Word 2016 (.docx format only) or later, and/or searchable Adobe PDF Version XI or later for all volumes, except for the Section L & M Pricing Matrix Excel workbook, referenced/contained in Volume IV: Factor 6 – Price/Cost, which shall be submitted in MS Excel format only. | |||
| L. 6.3.2.2: An Excel spreadsheet that clearly depicts all Phase-In actions with start and completion dates which ensures the Offeror will be prepared for full performance on the contract start date | L.4.2.1 states "Offeror’s proposals shall be created and saved using Microsoft Word 2016 (.docx format only) or later, and/or searchable Adobe PDF Version XI or later for all volumes, except for the Section L & M Pricing Matrix Excel workbook, referenced/contained in Volume IV: Factor 6 – Price/Cost, which shall be submitted in MS Excel format only." L.6.3.2.2 states "An Excel spreadsheet that clearly depicts all Phase-In actions with start and completion dates which ensures the Offeror will be prepared for full performance on the contract start date." Please update L.4.2.1 to allow the submission of an MS Excel spreadsheet to satisfy L.6.3.2.2 | ||||
| Section L 4.2.1. has been revised to allow submission in Excel. | |||||
| 39 | PWS | 4.2.24.2 One (1) C2 Equipment/Maintenance/Technical Representative/SME position. Location of performance will be at Kingpin MOC, Shaw AFB, SC. Services will be required IAW XXX. | 4.2.24.1 states Services will be required IAW XXX. Please provide XXX. | See answer to question 15. | |
| 40 | PWS and Solicitation | PWS Table 7.1 CLIN Ceilings and Solicitation page 3, Section B Note 5 | The base year and option dates in PWS Table 7.1 do not match the dates in the Solicitation page 3, Section B Note 5. Please clarify the correct dates. | See answer to questions 2 and 3. | |
| 41 | PWS | Table E.1 Deliverables Listing | The government refers to Contract Award and Contract Start, please identify the number of anticipated days between contract award and contract start. | The government has updated the PWS. | |
| 42 | PWS | Table E.1 Deliverables Listing | Deliverable D-041, Mission- Essential Contactor Services Plan is due 15 days prior to contract award date. This requirement seems incorrect. Can the government please clarify how offerors are to submit this deliverable prior to an award? Should this be due at contract start? | In accordance with DFARS provision 252.237-7024, the Mission Essential Contractor Services Plan is required at time of proposal. The PWS has been revised to reflect the submittal requirements for deliverable D-041. | |
| 43 | PWS | Table E.1 Deliverables Listing | At contract award, will the awardee be given a Notice to Proceed? | The contract award document will indicate performance start date. | |
| 44 | PWS | Can the government please confirm the use of PPE is not needed in the execution of this PWS? | Contractors based in Iraq shall get their PPE from either Ali Al Salem or Al Udeid prior to entering Iraq. Specific PPE issued will be based on current FPCON Levels and Threat Levels at each location in Iraq. Contractors departing Iraq and are not forecasted to return (i.e. departing the Contract, assigned to a different base outside of Iraq, etc.) shall return their PPE to the issuing base. | ||
| 45 | Solicitation & Section L | pg 1, block 9 & pg 3, para 4.2.2 | PWS 4.2.2 states: Proposals must be received no later than 1:00 PM EST on 13 February 2024. However, the first page of the solicitation shows the due date being 4:00 PM Locally on 19 February 2024. Will the Government please clarify the proposal due date? | See questions 3 and 18. | |
| 46 | Solicitation & PWS | pg 3, Note 5 & PWS pg 49, Para 7.4, Table 7.1 | The solicitation in Section B, Note 5 provides the contract estimated period of performance for Transition and each option period and within the PWS in Table 7.1 it displays the same contract periods although the estimated periods of performance are different. | ||
| Question: Can the government reconcile the estimated periods of performance? | The PWS has been revised to remove Table 7.1. | ||||
| 47 | PWS | pg 19, para 4.2.24.2 | PWS 4.2.24.2 requires one (1) C2 Equipment/Maintenance/Technical Representative/SME position. It states "Services will be required IAW XXX." Will the Government provide clarification on what the "IAW XXX" is referring to? | See question 15. | |
| 48 | PWS | pg 19, para 4.2.24.2 & pg 105, Table G-13 | The PWS para 4.2.24.2 requires one (1) C2 Equipment/Maintenance/Technical Representative/SME position to work a standard eight (8) hour workday (0730L-1630L). Within Table G-13 it states in additional site data "Works within AFCENT/A3-8 MOC lead liaison to ensure continuous C2 equipment, maintenance, and technical representation." | ||
| Question: Can the Government clarify the para 4.2.24.2 requirement for one day shift 8 hour workday vice the Table G-13 requirement for continuous representation? | The USG confirms the position is to work a standard eight (8) hour workday (0730L-1630L) Mon - Friday. | ||||
| 49 | Pricing Matrix and Section L | Summary Tab and Pg. 11 Section L.9.1 | Section L.9.1 states: "The breakout of costs for CLIN 0040 and its subsequent option CLINs will include the fully burdened FFP rates strictly used for any future contingency requirements under those CLINs and will be captured in worksheets 4 - 10. Although these rates will not be included in TOEP the Government will evaluate them IAW FAR 15.404-1(b)." |
However, the pricing matrix Sheet "2 - Summary" has a "TOTALS" row (row 25) that sums all CLINS including the Optional CLINs for the entire period of performance and is included in the sum for the TOEP in cell C27.
Will the Government please clarify if the Optional CLINs listed below will be evaluated in Total Overall Evaluated Price (TOEP)?
(OPTIONAL) - Det 5 - Iraq - Core Labor - CLINS (0050-6050) (OPTIONAL) - Det 9 - Jordan - Core Labor - CLINS (0051-6051) (OPTIONAL) - Det 3 - Qatar - Core Labor - CLINS (0052-6052) (OPTIONAL) - Det 4 - UAE - Core Labor - CLINS (0053-6053) (OPTIONAL) - Regional Maintenance Center - AUAB - Core Labor - CLINS (0054-6054) Yes, costs for CLINS X050 Det 5 - Iraq, X051 Det 9 - Jordan, X052 Det 3 - Qatar, X053 Det 4 - UAE shall be included in worksheet 3 - Section B, and worksheet 3A - Section B Cost Buildup.
Pricing Matrix worksheets 4 - 12 will be evaluated for use in future contingency requirements as per Section L-9.1, and will not be included in the TOEP.
Rates from worksheets 4-12 shall only be used to established pre-negotiated rates for use with CLIN X040 - Overtime/Surge, or contingency situations. These rates shall not be linked to worksheets 3 - Section B, and 3A - Section B Cost Buildup.
| 50 | Solicitation Section L | Follow up to Question Above | If Optional CLINs are included in the TOEP, is it also expected that offerors will include all optional sites in their organizational chart and technical narrative? | Yes |
| 51 | Solicitation Section L | pg. 7 para 6.2.1 | 6.2.1 states that offerors are required to complete the DoD Checklist for Reviewing Subcontracting Plans (Attachment 5) along with their subcontracting plan submittal. It does not appear that Attachment 5 was released with the final solicitation. Will the Government please provide Attachment 5 to ensure all offerors use the desired format? | See question 28. |
| 52 | PWS | Page 85, Table E-1 - Deliverables | Deliverable D-041 requires the Minimum Essential Contractor Services Plan (MECSP) to be submitted 15 days prior to contract award date. Is it the Government's intent for the MECSP to be submitted 15 days prior to contract award? This date is not known by offerors. If yes, please provide the date for contract award. Note: Recommend: "15 days after contract award" | See answer to question 42. |
| 53 | PWS, App F | pg. 89-100, numerous positions | There are numerous positions (10-21, 30-32) within Appendix F that list the SCA code in the position title even though they are exclusively OCONUS positions. It seems appropriate to list this SCA code for CONUS positions such as TERPS (22a & b), but can the Government please clarify the intent for listing SCA codes for exclusively OCONUS positions? Listing these codes in the job title in App F may lead offerors to use these SCA rates for bidding purposes despite the fact that they are not applicable. | The PWS has been revised to remove SCA Codes from OCONUS positions. |
| 54 | PWS | pg. 17, para. 4.2.12 | 4.2.12 states: " Exercises will be held at Jaber. During exercises, the following services are required:" Can the government please provide the expected frequency and duration of such exercises for the ACCOMS-II Period of Performance? | Exercises are approximately quarterly. Duration is normally 2 -3 days but could last up to a week dependent on the size of the exercise |
| 55 | PWS | pg. 36, Table 4.5.6 and pg. 107, Table G-22 | Table 4.5.6 and Table G-22 both detail the optional requirement to provide CARS System support for Main Operating Base, UAE. There appears to be no Optional CLIN associated with this work in the pricing matrix. Can the Government please clarify if this work is intended to be priced into an existing CLIN or if showing this optional requirement if for informational purposes only? | This will be for informational purposes only. The Government foresee no significant increase in workload in the event of activation of CARS Caretaker responsibilities at Main Operating Base, UAE. As such, no cost impact is expected if activated. |
| 56 | PWS | pg. 34, Table 4.5.1 | In Table 4.5.1 under AAAB, there is an "O" for optional for the RICC/MRICC C2 system. This requirement does not appear anywhere else in the PWS or seem to tie to any of the optional CLINS in the pricing matrix for ACCOMS-II. Can the Government please clarify if this RICC/MRICC requirement is intended to be priced under an existing CLIN or if it is just shown as optional for informational purposes only? | The PWS has been amended to remove the RICC/MRICC C2 system. |
| 57 | PWS | pg. 15, para 4.2.2 and pg. 39, para 4.6 | PWS 4.2.2 scope of work for NSA Bahrain lists PWS 4.6 "First Touch Maintenance" as a reference; however, there is no mention of first touch maintenance requirements in any other location in the PWS. Will the Government please clarify if there are any first touch maintenance requirements at NSA Bahrain? | There are no First Touch Maintenance requirements at NSA Bahrain. See Appendix G, Table G-1 NSA Bahrain. PWS Par 4.2.2 has been revised to remove the reference to Par 4.6. |
NOTE: Each table in Appendix G provides information on equipment and maintenance requirements. An asterisk "*" denotes equipment/systems where the contractor will have "First Touch Maintenance" responsibilities.
| 58 | Solicitation Section L | pg. 8 para 7.2.5.1, Subfactor A: Program Management | Does the Government require offerors to show Optional CLIN staffing in the Org chart required by RFP Section L.7.2.5.1? Recommend that the Organizational chart only depict the organization that will accomplish PWS requirements on Day 1 of the contract vs. also showing potential future requirements. | See answer to question 50. |
| 59 | Solicitation Section L | pg. 8 para 7.2.5 Subfactor A: Program Management | Does the Government require offerors to show Optional CLIN staffing methodology in Subfactor A of the technical proposal? Recommend that the Technical Narrative only address core work required by the PWS on Day 1 of the contract vs. potential future requirements. | Yes. |
| 60 | Section L & M Pricing Matrix | All | The job titles/positions shown in the Section L & M Pricing Matrix do not match the titles provided and expected by the ACCOMS-II PWS. Will the Government please consider updating the Pricing Matrix to match all required job titles in the PWS? | Contractor has the flexibility to provide updated job titles as long as they match the require job description listed in the PWS. |
| 61 | Section L & M Pricing Matrix | Tab 1 - Worksheet Instructions | The current instructions of the Section L & M Pricing Matrix appear to not allow the addition of new labor categories/job titles in the form of a new row within a sheet. In order to allow offerors more flexibility to provide new/unique/combined job titles at individual sites outside of the PMO, would the Government please consider allowing offerors the ability to add new rows for these job titles? | The Pricing Matrix has been updated to clarify that Government provided dollar values only cannot be changed. Offerors can edit, add, or combine positions in accordance with their approach. Instructions have been added to block 1 of the matrix. |
| 62 | Section L & M Pricing Matrix | Tab 1 - Worksheet Instructions | Discussion: The introduction of an In-theater PMO introduces the opportunity for offerors to fill that PMO with additional personnel/specialties outside of those required by the PWS; however, the Section L & M Pricing Matrix does not allow for addition of rows (new job titles) within the sheet for 5 - Qatar Rates. |
| Recommendation: Recommend that the Government allow the ability to add rows for new job titles within sheets to enable offerors the opportunity to provide unique solutions. | See answer to questions 12, 49, and 61. Note that price build-up details for FFP CLINS shall be provided in worksheet 3A - Section B Cost Build Up. Worksheets 4 - 12 shall be used to establish pre-negotiated rates for future use in accordance with Section L Par 9.1, and shall also reflect positions proposed in worksheets 3 and 3A. | ||||
| 63 | Section L & M Pricing Matrix | Tab 1 - Worksheet Instructions | In the event that the Government does not wish to allow addition of new rows (job titles) within the pricing matrix, is it the Government's intent that offerors provide blended direct rates for the existing job titles? As an example, there are no titles designated as Site Lead. Depending on the site, a site lead could be ATC, AM, or Maintenance personnel of varying titles. These Site Leads have additional responsibility and therefore have a higher direct rate. In this scenario (if we are not allowed to add new rows (job titles)) does the Government wish offerors to provide a blended rate that includes all variations of each title? | See answer to questions 12, 61, and 62. Offerors shall determine and identify positions designated as Site Leads in accordance with PWS Section A, Par 3.1.12.1. | |
| 64 | Solicitation Section L, App F and Section L & M Pricing Matrix | pg. 9 para 3.1.1 and pg. 99 para. 32 | The Section L & M Pricing Matrix (Qatar Rates Tab) lists a "Logistics - AOR Functional Lead" position in the OCONUS PMO. PWS 3.1.1 states that "The C-PM shall identify an in-theater technical representative/Subject Matter Expert (SME) for each functional area, to include air traffic control, airfield management, and equipment maintenance", but does not mention Logistics. The PWS makes no mention of a Logistics Functional SME type position. The only logistics position referenced in the PWS is the "Logistics/Material Management Technician in Appendix F. Will the Government please clarify if there is an additional "Logistics - AOR Functional Lead" position expected within the OCONUS PMO? | The Pricing Matrix has been updated to match the position title in PWS Appendix F Par 32. | |
| 65 | Solicitation Section L and Section L & M Pricing Matrix | pg. 43 para 4.8.1 | PWS 4.8.1 requires that the contractor establish and maintain a TODO/TODA IAW TO 00-5-1, AF Technical Order System, and AF 21-101 paara. 6.11. There is no TODO/TODA position within the Section L & M Pricing Matrix. Is it the Government's intent that this position is implemented as an additional duty? If not, will the Government please consider adding the position to the Section L & M Pricing Matrix document? | The Government intends for this position to be an additional duty at each site under the overarching C2/ATCALS/ATC Weather Equipment and Support Equipment O&M Services. | |
| 66 | Solicitation Section L and PWS | pg. 7 para 6.3.2.4 and PWS pg 12 para 3.1.14-3.1.14.3 | Section L 6.3.2.4 requires a discussion of phase out at the end of the contract to assure a smooth and efficient transition and contract close out. PWS 3.1.14.3 states that "The contractor shall update and provide the government with current operating and maintenance manuals, drawings, specifications, procedures, inventories, software, and all other data or documentation developed for or acquired under this contract (and its predecessor contracts)" |
Discussion: In 2019, we encountered many challenges when assuming the current ACCOM contract from previous incumbents. Previous incumbents engaged in what could be deemed as malicious activity such as refusing to provide or destroying training records, taking all supplies on site, emptying the contents of first aid kits, etc. These actions not only put the mission at risk, but also the health and safety of site personnel.
| Recommendation: Recommend that the Government add language to PWS 3.1.14.2 or 3.1.14.3 clarifying that all training records and historical program data necessary for incoming contractor performance be provided to the Government NLT Transition Start Date to ensure successful handover. Additionally, recommend the Government consider ways to disincentivize this behavior in the future. | PWS Par 3.1.14.3 has been updated to include all training records and historical program data. | |||
| 67 | Solicitation Section M | pg. 9 para 3.2.4.7 | M.3.2.4.7 states that "The Government may award without interchanges/discussions but reserves the right to conduct interchanges/discussions if in the Government's best interests. The burden is on the offeror to demonstrate and explain proposed pricing clearly and specifically." |
Discussion: Some anticipated offerors are known for arbitrarily cutting tens of millions of dollars out of their bids during discussions without adequate support or rationale other than to make their TOEP more attractive to evaluators. Although a large, last minute price cut may look attractive at first, this approach almost always invalidates the technical approach and places mission execution at extreme risk.
| Recommendation: If the Government opens discussions, recommend that the Government require offerors to provide sufficient detail on all areas where cost is added or removed from the TOEP and ensure those changes do not invalidate any portion of the proposed technical approach to avoid putting the program at undue risk. | Sufficient detail will be requested and prices will be evaluated to ensure the Government received a fair, reasonable, realistic, and balanced price IAW Section M Par 3.2.3. | ||
| 68 | PWS and Pricing Matrix | PWS, Table G-19 |
PWS Table 4.5.6 Pricing Matrix Spreadsheet Table G-19 lists the service requirements for the Main Operating Base, Jordan.
Table 4.5.6 shows the Main Operating Base, Jordan requirements are "required" and not "optional".
| The Pricing Matrix Spreadsheet, tab 3 - Schedule B, does not provide a CLIN associated with this location. Which CLIN is to be used for pricing for this location? | Services under table G-19 shall be associated with CLIN X006. | ||
| 69 | PWS and Pricing Matrix | PWS, Table G-20 |
PWS Table 4.5.6 Pricing Matrix Spreadsheet Table G-20 lists the service requirements for the Main Operating Base, Kuwait.
Table 4.5.6 shows the Main Operating Base, Kuwait requirements are "required" and not "optional".
| The Pricing Matrix Spreadsheet, tab 3 - Schedule B, does not provide a CLIN associated with this location. Which CLIN is to be used for pricing for this location? | Services under table G-20 shall be associated with CLIN X007. | ||
| 70 | PWS and Pricing Matrix | PWS, Table G-21 |
PWS Table 4.5.6 Pricing Matrix Spreadsheet Table G-21 lists the service requirements for the Main Operating Base, Saudi Arabia.
Table 4.5.6 shows the Main Operating Base, Saudi Arabia requirements are "required" and not "optional".
| The Pricing Matrix Spreadsheet, tab 3 - Schedule B, does not provide a CLIN associated with this location. Which CLIN is to be used for pricing for this location? | Services under table G-21 shall be associated with CLIN X010. | ||
| 71 | PWS and Pricing Matrix | PWS, Table G-18 |
PWS Table 4.5.4 Pricing Matrix Spreadsheet Table G-18 lists the service requirements for Det 6, Iraq.
Table 4.5.4 shows the Det 6 Iraq requirements are "required" and not "optional".
| The Pricing Matrix Spreadsheet, tab 3 - Schedule B, does not provide a CLIN associated with this location. Which CLIN is to be used for pricing for this location? | Services under table G-18 shall be associated with CLIN X005. | ||
| 72 | PWS and Pricing Matrix | PWS Table 4.5.4 | |
| Pricing Matrix Spreadsheet | Table 4.5.4 list numerous requirements for Det 3 Qatar and Det 4 UAE that are "required" and not "optional", including: |
JRE, 400 hz generators, AMMPS generators, 60 hz generators, automatic transfer switches, and HVAC.
The pricing matrix spreadsheet, tab 3 - Schedule B, lists Det 3 and Det 4 as OPTIONAL locations (CLINs X053 and X054). Is it the Government's intention that bidders include the "required" support items from Table 4.5.4 for Det 3 Qatar and Det 4 UAE in the Pricing Matrix tab 3 - Schedule B and exclude the "optional" items for these CLINs?
| Services listed as required in PWS table 4.5.4 shall be included in the corresponding location FFP CLIN. Det 3 Qatar shall be included in CLIN X009. Det 4 UAE shall be included in CLIN X011. Services listed as optional, shall be included in the corresponding location Option CLINS. Det 3 Qatar optional services shall be included in CLIN X052. Det 4 UAE optional services shall be included in CLIN X053. | |||
| 73 | PWS and Pricing Matrix | PWS Table 7.1 | |
| Pricing Matrix Spreadsheet | Table 7.1 list the NTE amount for CLIN X040, Option Period 6 as "$1,194,050". However, the Pricing Matrix spreadsheet, tab 3 - Section B, cell G144 lists the amount as "$1,994,050.00". Request clarification of the correct amount. | The PWS has been revised to remove Table 7.1. The Pricing Matrix has been revised to include the correct ceiling of $1,194,050 for CLIN 6040. | |
| 74 | PWS and Pricing Matrix | PWS Table 4.5.5 | |
| Pricing Matrix Spreadsheet | The Table 4.5.5 title states that the listed RMC O&M and Supply Support are an "(Optional Requirement)". The table also lists that the numerous requirements are "Y=Required" at a total of seven location. |
The Pricing Matrix, tab 3 - Section B, lists CLIN X054 as being the Regional Maintenance Center (RMC) at the AUAB location as being OPTIONAL.
a) Request clarification for whether all RMC requirements are OPTIONAL and should not be priced or whether only some requirements are optional?
| b) If only some RMC requirements are optional, please clarify where the costs for the required items/locations should be priced. | Services listed under PWS Table 4.5.5 are optional and will be required if CLIN X054 is exercised. | ||
| 75 | PWS and Pricing Matrix | PWS para 9.1 | |
| Pricing Matrix Spreadsheet | PWS para 9.1 state: "The Offeror shall complete Section L & M Pricing Matrix spreadsheet. This includes a worksheet for Section B of the solicitation, entitled “3 – Section B”, which will be completed by inserting the UNIT PRICE for all Firm Fixed Price (FFP) contract line item numbers (CLINS), including Transition, Base Period and Options." The Pricing Matrix, tab 3 - Section B, lists CLINs X050, X051, X052, X053, and X054 as being OPTIONAL and also FFP. Is it the Government's intention that bidders should include pricing for these OPTIONAL FFP CLINs in the Schedule B tab of the Pricing Matrix? | Yes | |
| 76 | PWS and Pricing Matrix | Section L, para 7.2.5.1 |