DRAFT_Appendix_G_-_Level_of_Effort_Data_Format.pdf

PDF 10 MB Posted

Attached to
Mobile Air Surveillance System Federal contract opportunity
Solicitation number
FA4890-13-R-0007
Issued by
Department of the Air Force Air Combat Command

About this file

DRAFT Appendix G - Level of Effort Information

View the file

Other files for this federal contract opportunity

Other files attached to Mobile Air Surveillance System, newest first.
File Type Posted
FA4890-13-R-0007-0001.pdf PDF
Appendix_M_-_Foreign_Travel_Clearance_Jan14.pdf PDF
MASS_PPC_Brief_-_20131218.pdf PDF
Appendix_T_-_Transition.pdf PDF
Appendix_O_-_HN_Agreements.pdf PDF
Appendix_R_-_Reports_List.pdf PDF
Appendix_B_-_Work_Management_Information.pdf PDF
Appendix_Y_-_Proposal_Incorporation.pdf PDF
Appendix_C_-_Quality_Mgt_Sys.pdf PDF
Appendix_A_-_Site_Locations.pdf PDF
Appendix_Q_-_Incentive_Plan.pdf PDF
Appendix_F_-_Pubs_and_Forms.pdf PDF
Appendix_J_-_Real_Prop_List.pdf PDF
Appendix_H_-_Optional_Sites.pdf PDF
Appendix_E_-_Contractor_Education.pdf PDF
Appendix_M_-_Foreign_Travel_Clearance.pdf PDF
Appendix_L_-_Gov_Furnished_Vehicles.pdf PDF
Appendix_I_-_Govt_Furnished_Prop.pdf PDF
Appendix_D_-_Circuit_Demarcation_Points.pdf PDF
0_MASS_RFP_FA489013R0007.pdf PDF
4_Atch_4_WD_TBD_NOTICE.pdf PDF
5_Atch_5_Price_Table_MASS_RFP.xlsx XLSX spreadsheet
MASS_solicitation_update.pdf PDF
Q A_12_Nov_13.pdf PDF
Draft_MASS_PWS_Solicitation_20131003.pdf PDF
Draft_Price_Table_MASS_RFP.xlsx XLSX spreadsheet
Draft_MASS_RFP_-_FA4890-13-R-0007.pdf PDF
MASS_Site_Visit_Announcement_-_Schedule_Update.pdf PDF
Price_Table_MASS_RFP_DRFT.xlsx XLSX spreadsheet
Draft_MASS_Incentive_Plan_20130930.pdf PDF
DRAFT_Appendix_Q_-_Incentive_Plan.pdf PDF
DRAFT_Appendix_L_-_Gov_Furnished_Vehicles.pdf PDF
Draft_MASS_RFP_-_FA4890-13-R-0007.pdf PDF
DRAFT_Appendix_N_-_Force_Protection.pdf PDF
WD_TBD-NOTICE.pdf PDF
DRAFT_Appendix_D_-_Circuit_Demarcation_Points.pdf PDF
Draft_MASS_PWS_20130912.pdf PDF
DRAFT_Appendix_I_-_Government_Furnished_Property.pdf PDF
DRAFT_Appendix_R_-_Reports.pdf PDF
Draft_MASS_DD-254.pdf PDF
DRAFT_Appendix_O_-_HN_Agreements.pdf PDF
DRAFT_Appendix_A_-_Site_Locations.pdf PDF
DRAFT_Appendix_E_-_Contractor_Education.pdf PDF
DRAFT_Appendix_S_-_Historical_Data_Format.pdf PDF
DRAFT_Appendix_J_-_Real_Prop_List.pdf PDF
DRAFT_Appendix_W_-_Acronyms.pdf PDF
WD_05-2120_R14_Monroe_FL.pdf PDF
DRAFT_Appendix_C_-_Quality_Mgt_Sys.pdf PDF
DRAFT_Appendix_K_-_Logistics_Data_Fields.pdf PDF
DRAFT_Appendix_Y_-_Proposal_Incorporation.pdf PDF
Show all 50

Mobile Air Surveillance System has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation FA4890-13-R-0007

12 Sep13

APPENDIX G

LEVEL OF EFFORT FORMAT

1. This appendix contains the workload data primarily for use to determine the level of effort associated with the various functions of this contract. This will provide a baseline to project level of effort. 3-4 years of data is listed below.

a. This list contains all consumables and repairables in on hand stock in the warehouses

MASS Consumables Reparables.xlsx

b. List of all equipment contained on the contract.

MASS Equip Assets.xlsx

c. Represents all the purchase orders for specified period.

Purchase Orders FY10-13 (2).xlsx

d. This list contains all charter flights used to support the Colombia functions meeting requirement of PWS.

MASS Charter Flights.xlsx

e. This list contains all outbound cargo shipments in support of all sites in the contract.

Outbound Shipements FY10-13.x

f. List of all work orders opened from Aug 09 – Sep 13

All Work Orders Combined.xlsx

g. FY13 Site PMI Schedule

FY13 Site PMI Schedule.xls

h. FY14 FAC Site PMI Schedule

1027451361C Typewritten Text DRAFT Appendix G-1

1027451361C Typewritten Text

Solicitation FA4890-13-R-0007

12 Sep 13

FY14 FAC Site PMI Schedule.xls

i. Job Plans

Job Plans.pdf

j. Periodic Inspection Workcards

Periodic Inspection Workcards-ocr.pdf

1027451361C Typewritten Text

1027451361C Typewritten Text DRAFT Appendix G-2

1027451361C Typewritten Text

Jul_Sept 2013

Work Order JCN Description Status Equipment Equipment Description PM Code Type Department Organization Class WO Start Date/Time WO Completed Date/Time ETRO Original PM Due Date

252844 3253SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 9/10/13 20:00 9/10/13 20:15 9/10/13

252313 3253KW10 SMOKE DETECTORS MONTHLY Completed KW-FAC-120-B SMOKE DETECTORS 586.028 PM-Preventive Maintenance KW KW FAC 9/10/13 19:30 9/10/13 20:00 9/9/13

252867 3253BZ98A ADMIN WO TO CAPTURE SIF DOWNTIME Completed 030543 RACK ASSEMBLY, IFF AD-Admin BZ BZ SIF 9/10/13 19:20 9/10/13 19:30

252865 3253BZ14 MULTIPLE PROCESSOR FAULTS BZ Completed 030597 RADAR VAN CM-Corrective Maintenance BZ BZ TPS70 9/10/13 19:20 9/10/13 19:30

252864 3253BZ99A ADMIN WO TO CAPTURE RADAR DOWNTIME Completed 030597 RADAR VAN AD-Admin BZ BZ TPS70 9/10/13 19:20 9/10/13 19:30

252784 3253KW09 JUNIPER/CISCO WEEKLY CHECKS Completed 31501 JUNIPER/CISCO 315.007 PM-Preventive Maintenance KW KW COMM 9/10/13 19:15 9/10/13 19:30 9/9/13

252310 3253KW08 MISCELLANEOUS BUILDING MONTHLY Completed KW-FAC-30-Z SATCOM BUILDING 573.028 PM-Preventive Maintenance KW KW FAC 9/10/13 18:30 9/10/13 19:15 9/9/13

252866 3253BZ98 ADMIN WO TO CAPTURE SIF PMI DOWNTIME Completed 030543 RACK ASSEMBLY, IFF AD-Admin BZ BZ SIF 9/10/13 18:00 9/10/13 19:20

252863 3253BZ99 ADMIN WO TO CAPTURE RADAR PMI DOWNTIME Completed 030597 RADAR VAN AD-Admin BZ BZ TPS70 9/10/13 18:00 9/10/13 18:20

252403 3253BZ13 SHELTER CORR CONROL; ANT ASSY CLEANING; TX OIL TEST Completed 030597 RADAR VAN 112.028 PM-Preventive Maintenance BZ BZ TPS70 9/10/13 18:00 9/10/13 19:20 9/9/13

252291 3253KW07 ECU Units Monthly Completed KW-FAC-40-B-3 COMMERCIAL ENVIRONMENT CONTROL UNITS, GROUP #3 530.028 PM-Preventive Maintenance KW KW FAC 9/10/13 17:30 9/10/13 18:30 9/9/13

252290 3253KW06 ECU Units Monthly Completed KW-FAC-40-B-1 COMMERCIAL ENVIRONMENT CONTROL UNITS, GROUP #1 530.028 PM-Preventive Maintenance KW KW FAC 9/10/13 16:30 9/10/13 17:30 9/9/13

252292 3253KW05 ECU Units Monthly Completed KW-FAC-40-B-2 COMMERCIAL ENVIRONMENT CONTROL UNITS, GROUP #2 530.028 PM-Preventive Maintenance KW KW FAC 9/10/13 15:30 9/10/13 16:30 9/9/13

252709 3253BZ11 TX WEEKLY PERF ROUTINE Completed 030597 RADAR VAN 103.007 PM-Preventive Maintenance BZ BZ TPS70 9/10/13 15:00 9/10/13 16:00 9/9/13

252710 3253BZ12 FREQ GEN POWER OUTPUT PERFORMANCE Completed 030597 RADAR VAN 104.007 PM-Preventive Maintenance BZ BZ TPS70 9/10/13 14:30 9/10/13 15:00 9/9/13

252692 3253KW04 Operations Building Weekly Completed KW-FAC-30-A BUILDING, OPERATIONS AND MAINTENANCE 575.007 PM-Preventive Maintenance KW KW FAC 9/10/13 14:30 9/10/13 15:30 9/9/13

252829 3253BZ06 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 9/10/13 14:00 9/10/13 14:30 9/10/13

252697 3253KW02 KW SATCOM WEEKLY SHELTER CLEANING & INSPECTION Completed 01800 SHELTER, BBEV 380.007 PM-Preventive Maintenance KW KW COMM 9/10/13 13:30 9/10/13 14:30 9/9/13

252303 3253KW03 KW BBEV SHELTER MONTHLY INSPECTION Completed 01800 SHELTER, BBEV 380.028B PM-Preventive Maintenance KW KW COMM 9/10/13 13:30 9/10/13 14:30 9/9/13

252694 3253KW01 KW SATCOM WEEKLY SHELTER CLEANING & INSPECTION Completed 01700 SHELTER, IEV 380.007 PM-Preventive Maintenance KW KW COMM 9/10/13 12:30 9/10/13 13:30 9/9/13

252712 3253BZ10 UPA-62 WEEKLY CHECKS Completed 030541 PPI Display Radar 132.007 PM-Preventive Maintenance BZ BZ TPS70 9/10/13 11:00 9/10/13 11:15 9/9/13

252711 3253BZ09 GPS-13 MIN PERFORMANCE CHECKS Completed 030543 RACK ASSEMBLY, IFF 124.007 PM-Preventive Maintenance BZ BZ SIF 9/10/13 10:45 9/10/13 11:00 9/9/13

252801 3253BZ08 SATCOM WEEKLY CHECKS Completed 030185 ANTENNA FLYAWAY 381.007 PM-Preventive Maintenance BZ BZ COMM 9/10/13 10:15 9/10/13 10:45 9/9/13

252800 3253BZ07 JUNIPER/CISCO WEEKLY CHECKS Completed 030199 JUNIPER CTP 315.007 PM-Preventive Maintenance BZ BZ COMM 9/10/13 10:00 9/10/13 10:15 9/9/13

252809 3252SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 9/9/13 20:00 9/9/13 20:15 9/9/13

252828 EVALUATION PN 3D55778G01 SN 1071 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 17:25

252826 EVALUATION PN 3D55778G01 SN 203 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 17:20

252825 EVALUATION PN 645A538G01 SN 07421-559 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 17:13

252823 EVALUATION PN UPA-59A SN 7780-010 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 17:05

252822 EVALUATION PN 1D18652G01 SN 1052 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 16:55

252841 3252TE95 Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 9/9/13 16:50 9/9/13 17:00

252769 3252TE01 TADIL / SECURE COMM WEEKLY CHECKS & CLEANING DTS Completed 33822 CABINET, COMMUNICATIONS (#3) 457.007 PM-Preventive Maintenance TQ TQ COMM 9/9/13 16:50 9/9/13 17:00 9/9/13

252821 EVALUATION PN 355D014G01 SN 1145 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 16:49

252820 EVALUATION PN 1D27753G01 SN 1079 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 16:38

252819 EVALUATION PN 3D56988G01 SN 1552 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 16:08

252843 3099TE02Y TADIL SYSTEM DOWN DUE TO LIGHTNING STRIKE Completed TQ-SITE TRES ESQUINAS SITE CM-AFTO95 TQ BW COMM 9/9/13 16:00 9/10/13 11:09 9/10/13

252827 3233BZ04D Jiatf-s KW reports failing height in real time check Awaiting Maint 030597 RADAR VAN CM-Corrective Maintenance BZ BZ TPS70 9/9/13 16:00 9/30/13

252818 EVALUATION PN 1D27308G01 SN 1312 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 15:57

252817 EVALUATION PN 1D24318G01 SN 1857 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 15:45

252816 EVALUATION PN 645A570A01 SN 1617 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 15:34

252815 evalaution pn 1D19596G01 sn 1195 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 15:23

252814 EVALUATION PN 1D27553G01 SN 1017 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 15:16

252813 evaluation pn U-9753-6 sn 1216181 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 15:12

252812 EVALUATION PN 3D56766G01 SN 1225 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 15:06

252811 EVALUATION PN 1D27626G01 SN 1104 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 14:57

252810 3488-1879-1 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/9/13 14:04

252824 3233BZ04C Jiatf-s KW reports failing height in real time check Completed 030597 RADAR VAN CM-Corrective Maintenance BZ BZ TPS70 9/9/13 14:00 9/9/13 16:00 9/30/13

252805 3252BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 9/9/13 13:00 9/9/13 13:30 9/9/13

252675 JUNIPER/CISCO WEEKLY CHECKS Open 31522 JUNIPER/CISCO 315.007 PM-Preventive Maintenance BG BG COMM 9/9/13 12:37 9/9/13

252676 Grounds Keeping Weekly Open BG-FAC-30-V-1 GROUNDS, OPERATIONS AREA 570.007 PM-Preventive Maintenance BG BG FAC 9/9/13 12:37 9/9/13

252687 I-F RECEIVER PERF ROUTINE Open 030597 RADAR VAN 105.007 PM-Preventive Maintenance BZ BZ TPS70 9/9/13 12:37 9/9/13

252737 SATCOM WEEKLY CHECKS Open 22002 EQUIPMENT, TERRESTRIAL 381.007 PM-Preventive Maintenance BG BG COMM 9/9/13 12:37 9/9/13

252738 Cummins Diesel Engine Weekly Open BG-FAC-20-A-1 ENGINE, DIESEL A 521.007 PM-Preventive Maintenance BG BG GEN 9/9/13 12:37 9/9/13

252739 Operations Building Weekly Open BG-FAC-30-A BUILDING, OPERATIONS AND MAINTENANCE 575.007 PM-Preventive Maintenance BG BG FAC 9/9/13 12:37 9/9/13

252750 Cummins Diesel Engine Weekly Open 030595 CUMMINS GENSET A 521.007 PM-Preventive Maintenance BZ BZ GEN 9/9/13 12:37 9/9/13

252751 Cummins Diesel Engine Weekly Open 030538 CUMMINS GENSET B 521.007 PM-Preventive Maintenance BZ BZ GEN 9/9/13 12:37 9/9/13

252752 Fuel System Weekly Open BZ-FAC-70 FUEL SYSTEMS 540.007 PM-Preventive Maintenance BZ BZ FAC 9/9/13 12:37 9/9/13

252753 Grounds Keeping Weekly Open BZ-FAC-30-V-1 GROUNDS, OPERATIONS AREA 570.007 PM-Preventive Maintenance BZ BZ FAC 9/9/13 12:37 9/9/13

252754 WATER TREATMENT SYSTEM WEEKLY Open BZ-FAC-60 WATER SYSTEMS 587.007 PM-Preventive Maintenance BZ BZ FAC 9/9/13 12:37 9/9/13

252775 JUNIPER/CISCO WEEKLY CHECKS Open 015081 JUNIPER/CISCO 315.007 PM-Preventive Maintenance CA CR COMM 9/9/13 12:37 9/9/13

252776 SATCOM WEEKLY CHECKS Open 015050 ANTENNA ASSEMBLY, 2.4 METER 381.007 PM-Preventive Maintenance CA CR COMM 9/9/13 12:37 9/9/13

252777 TADIL / SECURE COMM WEEKLY CHECKS & CLEANING DTS Open 015072 DRS TECH DTS 457.007 PM-Preventive Maintenance CA CR COMM 9/9/13 12:37 9/9/13

252779 Genrac Diesel Engine Weekly Open CA-FAC-20-A-1 ENGINE, DIESEL A 523.007 PM-Preventive Maintenance CA CR GEN 9/9/13 12:37 9/9/13

252781 VEHICLE WEEKLY WASHING Open 10X1413 Frontier 3.2 L 4X4 900.007 PM-Preventive Maintenance CA CR VEH 9/9/13 12:37 9/9/13

252789 VEHICLE WEEKLY WASHING Open 10X8665 TRUCK, FLATBED, PICK UP 900.007 PM-Preventive Maintenance BW BW VEH 9/9/13 12:37 9/9/13

252802 EQUIP ROOM RACK CLEANING & INSPECTION Open BZ-SITE BELIZE SITE 490.007 PM-Preventive Maintenance BZ BZ COMM 9/9/13 12:37 9/9/13

252537 HF Radio BITE test and Filter Cleaning Open 015059 HF RADIO CABINET #3 413.014 PM-Preventive Maintenance CA CR COMM 9/9/13 12:36 9/9/13

252602 SHELTER CLEANING, INSPECTION & SERVICING Open 030597 RADAR VAN 107.014B PM-Preventive Maintenance BZ BZ TPS70 9/9/13 12:36 9/9/13

252604 INDEPENDENT IFF/SIF SYSTEM TEST Open 030543 RACK ASSEMBLY, IFF 107.014A PM-Preventive Maintenance BZ BZ SIF 9/9/13 12:36 9/9/13

252374 Lighting Monthly Open CA-SITE CERRO AZUL SITE 515.028 PM-Preventive Maintenance CA CR FAC 9/9/13 12:36 9/9/13

252377 Auto Transfer Switch Monthly Open CA-FAC-10-I Generac , 600 Amp Automatic Transfer Switch 517.028 PM-Preventive Maintenance CA CR GEN 9/9/13 12:36 9/9/13

252381 TX MONTHLY PERF ROUTINE Open 030597 RADAR VAN 111.028 PM-Preventive Maintenance BZ BZ TPS70 9/9/13 12:36 9/9/13

252383 MONTHLY WASHING FOR SERVICE VEHICLES & MHE Open 92X6666 FORKLIFT TRUCK, 10K 901.028 PM-Preventive Maintenance MW MW VEH 9/9/13 12:36 9/9/13

252385 SAT PHONE MONTHLY OPERATION CHECK Open 90959 Iridium Satellite Phone 480.028 PM-Preventive Maintenance BW BW COMM 9/9/13 12:36 9/9/13

252386 SAT PHONE MONTHLY OPERATION CHECK Open 55547 Iridium SATELLITE PHONE 480.028 PM-Preventive Maintenance BW BW COMM 9/9/13 12:36 9/9/13

252387 SAT PHONE MONTHLY OPERATION CHECK Open 90961 Iridium Satellite Phone 480.028 PM-Preventive Maintenance BW BW COMM 9/9/13 12:36 9/9/13

252391 SATCOM Monthly Checks Open 22002 EQUIPMENT, TERRESTRIAL 381.028 PM-Preventive Maintenance BG BG COMM 9/9/13 12:36 9/9/13

252392 Auto Transfer Switch Monthly Open BG-FAC-10-I AUTOMATIC TRANSFER SWITCH #1 517.028 PM-Preventive Maintenance BG BG GEN 9/9/13 12:36 9/9/13

252398 Auto Transfer Switch Monthly Open BZ-FAC-10-I AUTOMATIC TRANSFER SWITCH 517.028 PM-Preventive Maintenance BZ BZ GEN 9/9/13 12:36 9/9/13

252401 SATCOM Monthly Checks Open 030185 ANTENNA FLYAWAY 381.028 PM-Preventive Maintenance BZ BZ COMM 9/9/13 12:36 9/9/13

252406 Batteries Monthly Open BZ-FAC-20-A-2-D BATTERIES, ENGINE B START 512.028 PM-Preventive Maintenance BZ BZ FAC 9/9/13 12:36 9/9/13

252535 HF Radio BITE test and Filter Cleaning Open 015057 HF RADIO CABINET #1 413.014 PM-Preventive Maintenance CA CR COMM 9/9/13 12:36 9/9/13

252536 HF Radio BITE test and Filter Cleaning Open 015058 HF RADIO CABINET #2 413.014 PM-Preventive Maintenance CA CR COMM 9/9/13 12:36 9/9/13

252299 Lighting Monthly Open BG-FAC-30-E GENSET BUILDING 515.028 PM-Preventive Maintenance BG BG FAC 9/9/13 12:35 9/9/13

252308 Lighting Monthly Open KW-FAC-30-Z SATCOM BUILDING 515.028 PM-Preventive Maintenance KW KW FAC 9/9/13 12:35 9/9/13

252311 Lighting Monthly Open KW-FAC-30-A BUILDING, OPERATIONS AND MAINTENANCE 515.028 PM-Preventive Maintenance KW KW FAC 9/9/13 12:35 9/9/13

252314 ANT/RCVR INTERFACE PERF ROUTINE Open 030597 RADAR VAN 109.028 PM-Preventive Maintenance BZ BZ TPS70 9/9/13 12:35 9/9/13

252315 ANT BEARING LUBE; ANT DRIVE MOTOR GEARBOX Open 030598 TPS 70 ANTENNA 114.028 PM-Preventive Maintenance BZ BZ TPS70 9/9/13 12:35 9/9/13

252316 ANTENNA BULL GEAR LUBRICATION Open 030598 TPS 70 ANTENNA 113.028 PM-Preventive Maintenance BZ BZ TPS70 9/9/13 12:35 9/9/13

252321 KATO Motor Generators Monthly Open 030423 MD-4 Motor 400 HZ 551.028 PM-Preventive Maintenance BZ BZ GEN 9/9/13 12:35 9/9/13

252322 KATO Motor Generators Monthly Open 030215 GENERATOR (KATO ENGINEERING) 551.028 PM-Preventive Maintenance BZ BZ GEN 9/9/13 12:35 9/9/13

252356 SATCOM Monthly Checks Open 015050 ANTENNA ASSEMBLY, 2.4 METER 381.028 PM-Preventive Maintenance CA CR COMM 9/9/13 12:35 9/9/13

252371 Batteries Monthly Open CA-FAC-20-A-1-D BATTERIES, ENGINE A START 512.028 PM-Preventive Maintenance CA CR FAC 9/9/13 12:35 9/9/13

252263 Lighting Monthly Open BZ-SITE BELIZE SITE 515.028 PM-Preventive Maintenance BZ BZ FAC 9/9/13 12:34 9/9/13

252275 ECU Units Monthly Open BZ-FAC-40-B-3 COMMERCIAL ENVIRONMENT CONTROL UNITS, GROUP #3 530.028 PM-Preventive Maintenance BZ BZ FAC 9/9/13 12:34 9/9/13

252279 Batteries Monthly Open BZ-FAC-20-A-1-D BATTERIES, ENGINE A START 512.028 PM-Preventive Maintenance BZ BZ FAC 9/9/13 12:34 9/9/13

252284 Batteries Monthly Open BG-FAC-20-A-1-D BATTERIES, ENGINE START 512.028 PM-Preventive Maintenance BG BG FAC 9/9/13 12:34 9/9/13

252285 Battery Charger Monthly Open BG-FAC-20-A-1-B CHARGER, BATTERY 518.028 PM-Preventive Maintenance BG BG GEN 9/9/13 12:34 9/9/13

252286 ECU Units Monthly Open BG-FAC-40-B-2 COMMERCIAL ENVIRONMENT CONTROL UNITS, GROUP #2 530.028 PM-Preventive Maintenance BG BG FAC 9/9/13 12:34 9/9/13

252297 Lighting Monthly Open BG-FAC-30-A BUILDING, OPERATIONS AND MAINTENANCE 515.028 PM-Preventive Maintenance BG BG FAC 9/9/13 12:34 9/9/13

248893 Electric Panels Quarterly Open CA-FAC-10-A PANELS, ELECTRICAL 511.084 PM-Preventive Maintenance CA CR FAC 9/9/13 12:34 9/9/13

248915 Electric Panels Quarterly Open BZ-FAC-10-A PANELS, ELECTRICAL 511.084 PM-Preventive Maintenance BZ BZ FAC 9/9/13 12:34 9/9/13

250959 Electric Panels Quarterly Open BG-FAC-10-A ELECTRICAL PANELS 511.084 PM-Preventive Maintenance BG BG FAC 9/9/13 12:34 9/9/13

250996 RADAR SUBASSEMBLY QUARTERLY CHECKS Open 030597 RADAR VAN 115.084 PM-Preventive Maintenance BZ BZ TPS70 9/9/13 12:34 9/9/13

245110 ELECTRICAL GROUNDING ANNUAL Open KW-FAC-10-H SITE GROUNDING 516.336 PM-Preventive Maintenance KW KW FAC 9/9/13 12:33 9/9/13

245127 ELECTRICAL GROUNDING ANNUAL Open BG-FAC-10-H SITE GROUNDING 516.336 PM-Preventive Maintenance BG BG FAC 9/9/13 12:33 9/9/13

245449 ELECTRICAL GROUNDING ANNUAL Open CA-FAC-10-H SITE GROUNDING 516.336 PM-Preventive Maintenance CA CR FAC 9/9/13 12:33 9/9/13

247103 ELECTRICAL GROUNDING ANNUAL Open BZ-FAC-10-H SITE GROUNDING 516.336 PM-Preventive Maintenance BZ BZ FAC 9/9/13 12:33 9/9/13

247120 Perimeter Fence Annual Open BZ-FAC-30-P FENCE, PERIMETER 576.336 PM-Preventive Maintenance BZ BZ FAC 9/9/13 12:33 9/9/13

247292 UPX-27 CIRCUIT CARD INSPECTION & CLEAN Open 030543 RACK ASSEMBLY, IFF 125.336B PM-Preventive Maintenance BZ BZ SIF 9/9/13 12:33 9/9/13

252842 3099TE02X TADIL SYSTEM DOWN DUE TO LIGHTNING STRIKE Completed TQ-SITE TRES ESQUINAS SITE CM-AFTO95 TQ BW COMM 9/9/13 12:00 9/9/13 16:00

252266 3253BZ04 MISCELLANEOUS BUILDING MONTHLY Completed 029785 MSK#1 STORAGE SHELTER 573.028 PM-Preventive Maintenance BZ BZ FAC 9/9/13 3:00 9/9/13 4:00 9/9/13

252281 3253BZ03 MISCELLANEOUS BUILDING MONTHLY Completed 030600 MSK#2 OPS SHELTER 573.028 PM-Preventive Maintenance BZ BZ FAC 9/9/13 2:00 9/9/13 3:00 9/9/13

247124 3253BZ05 SMOKE DETECTORS ANNUAL Completed BZ-FAC-120-B SMOKE DETECTORS 586.336 PM-Preventive Maintenance BZ BZ FAC 9/9/13 1:30 9/9/13 2:00 9/9/13

252320 3253BZ02 Battery Charger Monthly Completed 030536 CUMMINS BATTERY CHARGER B 518.028 PM-Preventive Maintenance BZ BZ GEN 9/9/13 1:00 9/9/13 1:30 9/9/13

252319 3253BZ01 Battery Charger Monthly Completed 030537 CUMMINS BATTERY CHARGER A 518.028 PM-Preventive Maintenance BZ BZ GEN 9/9/13 0:30 9/9/13 1:00 9/9/13

252808 3251SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 9/8/13 20:00 9/8/13 20:15 9/9/13

252799 3251BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 9/8/13 13:00 9/8/13 13:30 9/8/13

252807 3250SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 9/7/13 20:00 9/7/13 20:15 9/9/13

252664 3250BZ04 EQUIP ROOM RACK CLEANING & INSPECTION Completed BZ-SITE BELIZE SITE 490.007 PM-Preventive Maintenance BZ BZ COMM 9/7/13 18:00 9/7/13 19:00 9/2/13

252806 3099TE02W TADIL SYSTEM DOWN DUE TO LIGHTNING STRIKE Completed TQ-SITE TRES ESQUINAS SITE CM-Corrective Maintenance TQ BW COMM 9/7/13 17:00 9/9/13 12:00

252782 3250BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 9/7/13 17:00 9/7/13 17:30 9/7/13

252650 3250BZ03 SATCOM WEEKLY CHECKS Completed 030185 ANTENNA FLYAWAY 381.007 PM-Preventive Maintenance BZ BZ COMM 9/7/13 14:15 9/7/13 14:45 9/2/13

252649 3250BZ02 JUNIPER/CISCO WEEKLY CHECKS Completed 030199 JUNIPER CTP 315.007 PM-Preventive Maintenance BZ BZ COMM 9/7/13 14:00 9/7/13 14:15 9/2/13

252797 3099TE02 TADIL SYSTEM DOWN DUE TO LIGHTNING STRIKE Cancelled TQ-SITE TRES ESQUINAS SITE CM-Corrective Maintenance TQ BW COMM 9/7/13 1:30 9/8/13 14:50 9/10/13

252803 3250TE95A Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 9/7/13 0:00 9/7/13 23:59

252792 3233BZ04B Jiatf-s KW reports failing height in real time check Completed 030597 RADAR VAN CM-Corrective Maintenance BZ BZ TPS70 9/6/13 21:25 9/9/13 14:00 9/30/13

252798 3249BZ05 SIF DOWN DUE TO RADAR TROUBLESHOOTING Completed 030543 RACK ASSEMBLY, IFF CM-Corrective Maintenance BZ BZ SIF 9/6/13 21:00 9/6/13 21:25

252796 3099TE02V TADIL SYSTEM DOWN DUE TO LIGHTNING STRIKE Completed TQ-SITE TRES ESQUINAS SITE CM-AFTO95 TQ BW COMM 9/6/13 21:00 9/7/13 17:00

252795 3249TE95A Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 9/6/13 21:00 9/6/13 23:59

252794 3249Z98A WO TO CAPTURE DOWNTIME ON THE SIF Completed 030543 RACK ASSEMBLY, IFF AD-Admin BZ BZ SIF 9/6/13 21:00 9/6/13 21:25

252793 3249BZ99A ADMIN W/O TO CAPTURE RADAR DAOWNTIME Completed 030543 RACK ASSEMBLY, IFF AD-Admin BZ BZ TPS70 9/6/13 21:00 9/6/13 21:25

252790 3233BZ04A Jiatf-s KW reports failing height in real time check Completed 030597 RADAR VAN CM-Corrective Maintenance BZ BZ TPS70 9/6/13 21:00 9/6/13 21:25

252763 3249SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 9/6/13 20:00 9/6/13 20:15 9/6/13

252654 VEHICLE WEEKLY WASHING Completed 10X8665 TRUCK, FLATBED, PICK UP 900.007 PM-Preventive Maintenance BW BW VEH 9/6/13 18:55 9/6/13 21:26 9/2/13

252783 repair pn 353D582G01 sn 1267(A) Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/6/13 18:22

252788 3249KW05 Thermally protected AC compact fan needs replaced Open 01600 ANTENNA, 9.3M KPC CM-Corrective Maintenance KW KW COMM 9/6/13 18:15 10/31/13

252787 3249KW04 T-Smart CSU ADC Monitor failure Awaiting Maint 030284 ADC MONITOR CM-Corrective Maintenance KW KW COMM 9/6/13 18:00 10/31/13

252196 3249KW03 KW SATCOM ANTENNA MONTHLY INSPECTIONS Completed 01600 ANTENNA, 9.3M KPC 320.028 PM-Preventive Maintenance KW KW COMM 9/6/13 15:30 9/6/13 17:30 9/2/13

252747 3249BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 9/6/13 15:00 9/6/13 15:30 9/6/13

252657 VEHICLE WEEKLY WASHING Completed 10X1413 Frontier 3.2 L 4X4 900.007 PM-Preventive Maintenance CA CR VEH 9/6/13 15:00 9/6/13 16:00 9/2/13

252186 3249KW02 RDIS Monthly Checks Completed 02110 SYSTEM, RADAR DATA INTERFACE 740.028 PM-Preventive Maintenance KW KW COMM 9/6/13 15:00 9/6/13 15:30 9/2/13

252559 3249KW01 JUNIPER/CISCO WEEKLY CHECKS Completed 31501 JUNIPER/CISCO 315.007 PM-Preventive Maintenance KW KW COMM 9/6/13 14:30 9/6/13 15:00 9/2/13

244964 12,000 MILES OR 12 MONTHS CHECKS & SERVICE Open 10X8665 TRUCK, FLATBED, PICK UP 900.12K PM-Preventive Maintenance BW BW VEH 9/6/13 12:55 8/23/13

252762 3249BZ99 ADMIN W/O FOR PROCESSOR FAILED STARTUP Completed 030543 RACK ASSEMBLY, IFF AD-Admin BZ BZ SIF 9/6/13 10:00 9/6/13 10:40

252761 3249BZ99 ADMIN W/O PROCESSOR WOULDN'T LOAD Completed 030597 RADAR VAN AD-Admin BZ BZ TPS70 9/6/13 10:00 9/6/13 10:40 9/30/13

252760 3249BZ03 PROCESSOR FAILED STARTUP Completed 030543 RACK ASSEMBLY, IFF CM-Corrective Maintenance BZ BZ SIF 9/6/13 10:00 9/6/13 10:40

252759 3249BZ02 PROCESSOR WOULDN'T LOAD Completed 030597 RADAR VAN CM-Corrective Maintenance BZ BZ TPS70 9/6/13 10:00 9/6/13 10:40 9/30/13

252791 3249TE95 Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 9/6/13 0:00 9/6/13 21:00

252743 3248SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 9/5/13 20:00 9/5/13 20:15 9/5/13

252606 3248BZ04 Grounds Keeping Weekly Completed BZ-FAC-30-V-1 GROUNDS, OPERATIONS AREA 570.007 PM-Preventive Maintenance BZ BZ FAC 9/5/13 19:00 9/5/13 19:30 9/2/13

252749 shipping cost Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/5/13 18:36

252607 3248BZ03 WATER TREATMENT SYSTEM WEEKLY Completed BZ-FAC-60 WATER SYSTEMS 587.007 PM-Preventive Maintenance BZ BZ FAC 9/5/13 18:30 9/5/13 19:00 9/2/13

252653 3248BZ02 Fuel System Weekly Completed BZ-FAC-70 FUEL SYSTEMS 540.007 PM-Preventive Maintenance BZ BZ FAC 9/5/13 18:00 9/5/13 18:30 9/2/13

252748 QPAC D Containers and Pallets Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/5/13 16:54 9/9/13 15:33

252280 3248BZ07 CUMMINS DIESEL ENGINE EVERY 250 HRS Completed 030595 CUMMINS GENSET A 521.0250 PM-719 BZ BZ GEN 9/5/13 16:00 9/5/13 18:00

252714 3248BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 9/5/13 15:00 9/5/13 15:30 9/5/13

252746 repair pn 353D582G01 sn 117 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/5/13 14:15

252744 repair pn d18198G01 sn 1524 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/5/13 13:01

252629 3248TE01 TADIL / SECURE COMM WEEKLY CHECKS & CLEANING DTS Completed 33822 CABINET, COMMUNICATIONS (#3) 457.007 PM-Preventive Maintenance TQ TQ COMM 9/5/13 12:00 9/5/13 12:10 9/2/13

252528 3248BZ06 Cummins Diesel Engine Weekly Completed 030538 CUMMINS GENSET B 521.007 PM-Preventive Maintenance BZ BZ GEN 9/5/13 12:00 9/5/13 13:00 9/2/13

252527 3248BZ05 Cummins Diesel Engine Weekly Completed 030595 CUMMINS GENSET A 521.007 PM-Preventive Maintenance BZ BZ GEN 9/5/13 10:00 9/5/13 11:00 9/2/13

252758 3248TE95 Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 9/5/13 0:00 9/5/13 23:59

252700 3247SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 9/4/13 20:00 9/4/13 20:15 9/4/13

252735 3247BZ99 Admin work order to capture Radar CM, Inverter Load Fault Completed 030597 RADAR VAN AD-Admin BZ BZ TPS70 9/4/13 19:50 9/4/13 20:40

252734 3247BZ07 Radar, Inverter Load Fault Completed 030597 RADAR VAN CM-AFTO95 BZ BZ TPS70 9/4/13 19:50 9/4/13 21:29

252733 DODGE RAM TRUCK C41349 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 19:40 9/9/13 18:59

252732 JEEP PATRIOT C44201 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 19:39 9/9/13 18:56

252731 INVOICE 30114271 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 19:26 9/9/13 18:53

252730 POWER SERVICE 17JUL-16AUG13 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 19:17 9/9/13 18:50

252729 2507938182 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 19:07 9/9/13 18:25

252728 2507488045 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 18:59 9/9/13 18:22

252727 2-388-38013 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 18:50 9/9/13 18:14

252726 2-381-18527 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 18:49 9/9/13 18:12

252725 2-374-91480 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 18:47 9/9/13 18:07

252724 2-374-00200 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 18:46 9/9/13 18:05

252723 2-373-80394 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 18:44 9/9/13 18:01

252722 shipping for line item 2 invoice TBH805 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 18:21 9/9/13 18:29

252721 Invoice 45327 freight Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/4/13 18:07

252720 M19332463 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 17:46 9/9/13 17:58

252719 M19332322 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 17:45 9/9/13 17:56

250706 Harness and Lanyards Quarterly Completed CA-SITE CERRO AZUL SITE 690.084 PM-Preventive Maintenance CA CR FAC 9/4/13 17:45 9/4/13 18:00 9/2/13

252718 M19332195 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 17:44 9/9/13 17:51

252717 M19332192 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 17:42 9/9/13 17:32

252534 Genrac Diesel Engine Weekly Completed CA-FAC-20-A-1 ENGINE, DIESEL A 523.007 PM-Preventive Maintenance CA CR GEN 9/4/13 17:00 9/4/13 17:30 9/2/13

252160 3247BG04 OPERATIONS BUILDING MONTHLY Completed BG-FAC-30-A BUILDING, OPERATIONS AND MAINTENANCE 575.028 PM-Preventive Maintenance BG BG FAC 9/4/13 17:00 9/4/13 18:00 9/2/13

252612 3247BG03 Operations Building Weekly Completed BG-FAC-30-A BUILDING, OPERATIONS AND MAINTENANCE 575.007 PM-Preventive Maintenance BG BG FAC 9/4/13 16:00 9/4/13 17:00 9/2/13

252227 EQUIP ROOM RACK CLEANING AND INSPECTION Completed CA-SITE CERRO AZUL SITE 490.028 PM-Preventive Maintenance CA CR FAC 9/4/13 16:00 9/4/13 16:45 9/2/13

252742 3247CA97 Administrative work order to capture downtime for COMM. Completed 015072 DRS TECH DTS AD-Admin CA CR COMM 9/4/13 15:40 9/4/13 15:50

252529 3247CA01 TADIL / SECURE COMM WEEKLY CHECKS & CLEANING DTS Completed 015072 DRS TECH DTS 457.007 PM-Preventive Maintenance CA CR COMM 9/4/13 15:40 9/4/13 15:50 9/2/13

252530 JUNIPER/CISCO WEEKLY CHECKS Completed 015081 JUNIPER/CISCO 315.007 PM-Preventive Maintenance CA CR COMM 9/4/13 15:30 9/4/13 15:40 9/2/13

252708 repair pn D27738G01 sn 1043 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 15:13 9/11/13 14:06

252707 repair pn 1D27738G01 sn 1084 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/4/13 15:05

252682 3247BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 9/4/13 15:00 9/4/13 15:30 9/4/13

252613 3247BG02 Cummins Diesel Engine Weekly Completed BG-FAC-20-A-1 ENGINE, DIESEL A 521.007 PM-Preventive Maintenance BG BG GEN 9/4/13 15:00 9/4/13 16:00 9/2/13

252531 SATCOM WEEKLY CHECKS Completed 015050 ANTENNA ASSEMBLY, 2.4 METER 381.007 PM-Preventive Maintenance CA CR COMM 9/4/13 15:00 9/4/13 15:30 9/2/13

252706 invoice IN0017524 freight Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 14:59 9/9/13 18:43

252705 repair pn 1D18291G02 sn 1169 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/4/13 14:58

252704 invoice 4163 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 14:53 9/9/13 18:40

252703 Invoice 53047 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 14:44 9/9/13 18:35

252582 3247BG01 SATCOM WEEKLY CHECKS Completed 22002 EQUIPMENT, TERRESTRIAL 381.007 PM-Preventive Maintenance BG BG COMM 9/4/13 14:00 9/4/13 15:00 9/2/13

252702 INVOICE FLWES85009 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/4/13 13:28 9/9/13 18:47

252701 SERVICES : REPAIR PUMP P/N: 3522080 GENSET C-9 TO MD Completed BW BOGOTA WAREHOUSE LG-Admin BW BW FAC 9/4/13 12:39 9/4/13 12:47

252217 3247BZ08 COMPR/DEHY DUTY CYCLE & RUN HOURS CHECK Completed 030597 RADAR VAN 130.028 PM-Preventive Maintenance BZ BZ TPS70 9/4/13 12:00 9/4/13 12:30 9/2/13

252495 3247bz06 SYSTEM ORIENTATION PERF CHECK Completed 030597 RADAR VAN 106.014 PM-Preventive Maintenance BZ BZ TPS70 9/4/13 11:40 9/4/13 11:50 9/2/13

252552 3247bz05 UPA-62 WEEKLY CHECKS Completed 030541 PPI Display Radar 132.007 PM-Preventive Maintenance BZ BZ TPS70 9/4/13 10:30 9/4/13 10:40 9/2/13

252550 3247BZ04 GPS-13 MIN PERFORMANCE CHECKS Completed 030543 RACK ASSEMBLY, IFF 124.007 PM-Preventive Maintenance BZ BZ SIF 9/4/13 10:00 9/4/13 10:30 9/2/13

252551 3247BZ03 FREQ GEN POWER OUTPUT PERFORMANCE Completed 030597 RADAR VAN 104.007 PM-Preventive Maintenance BZ BZ TPS70 9/4/13 9:30 9/4/13 10:00 9/2/13

252549 3247BZ02 TX WEEKLY PERF ROUTINE Completed 030597 RADAR VAN 103.007 PM-Preventive Maintenance BZ BZ TPS70 9/4/13 9:00 9/4/13 9:30 9/2/13

252741 3247TE95 Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 9/4/13 0:00 9/4/13 23:59

252685 3246SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 9/3/13 20:00 9/3/13 20:15 9/3/13

252695 3246BZ03 processor reset Completed 030597 RADAR VAN CM-Corrective Maintenance BZ BZ TPS70 9/3/13 18:53 9/3/13 18:57

252691 3246BZ99a WO TO CAPTURE DOWNTIME ON THE RADAR Completed 030597 RADAR VAN AD-Admin BZ BZ TPS70 9/3/13 18:53 9/3/13 18:57

252690 3246BZ98a WO TO CAPTURE DOWNTIME ON THE SIF Completed 030543 RACK ASSEMBLY, IFF AD-Admin BZ BZ SIF 9/3/13 18:53 9/3/13 18:57

252686 EVALUATION PN 1D27107G01 SN 1347 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 9/3/13 17:55

252689 3246BZ98 WO TO CAPTURE PMI DOWNTIME ON THE SIF Completed 030543 RACK ASSEMBLY, IFF Select Type BZ BZ SIF 9/3/13 17:00 9/3/13 18:15

252688 3246BZ99 WO TO CAPTURE PMI DOWNTIME ON THE RADAR Completed 030597 RADAR VAN AD-Admin BZ BZ TPS70 9/3/13 17:00 9/3/13 18:15

252605 3246BZ02 I-F RECEIVER PERF ROUTINE Completed 030597 RADAR VAN 105.007 PM-Preventive Maintenance BZ BZ TPS70 9/3/13 17:00 9/3/13 18:15 9/2/13

252684 freight Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/3/13 16:57 9/5/13 18:37

252683 ProSeal dispensing gun 09-38530 for van refurb Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 9/3/13 16:41 9/5/13 18:34

250725 3246KW06 Harness and Lanyards Quarterly Completed KW-SITE KEY WEST ET SITE 690.084 PM-Preventive Maintenance KW KW FAC 9/3/13 16:00 9/3/13 16:30 9/2/13

252677 3246bz01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 9/3/13 15:00 9/3/13 15:30 9/3/13

252557 3246KW05 KW SATCOM WEEKLY SHELTER CLEANING & INSPECTION Completed 01800 SHELTER, BBEV 380.007 PM-Preventive Maintenance KW KW COMM 9/3/13 15:00 9/3/13 15:45 9/2/13

252558 3246KW03 KW SATCOM WEEKLY SHELTER CLEANING & INSPECTION Completed 01700 SHELTER, IEV 380.007 PM-Preventive Maintenance KW KW COMM 9/3/13 14:00 9/3/13 14:45 9/2/13

252130 3246KW04 KW IEV SHELTER MONTHLY INSPECTION Completed 01700 SHELTER, IEV 380.028A PM-Preventive Maintenance KW KW COMM 9/3/13 14:00 9/3/13 15:00 9/2/13

252556 3246KW01 Operations Building Weekly Completed KW-FAC-30-A BUILDING, OPERATIONS AND MAINTENANCE 575.007 PM-Preventive Maintenance KW KW FAC 9/3/13 13:00 9/3/13 13:45 9/2/13

252128 3246KW02 OPERATIONS BUILDING MONTHLY Completed KW-FAC-30-A BUILDING, OPERATIONS AND MAINTENANCE 575.028 PM-Preventive Maintenance KW KW FAC 9/3/13 13:00 9/3/13 14:00 9/2/13

252699 3246TE95 Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 9/3/13 0:00 9/3/13 23:59

252804 3182CA02B Transceiver shows VSWR Fault during Bite Test Awaiting Maint 015100 SUNAIR HF/ISB DATA TRANSCEIVER CM-AFTO95 CA CR COMM 9/2/13 20:00 10/31/13

252674 3245SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 9/2/13 20:00 9/2/13 20:15 9/2/13

250627 3245BG03 Harness and Lanyards Quarterly Completed BG-SITE BOGOTA HNCC SITE 690.084 PM-Preventive Maintenance BG BG FAC 9/2/13 17:15 9/2/13 17:15 9/2/13

250803 Harness and Lanyards Quarterly Cancelled BZ-SITE BELIZE SITE 690.084 PM-Preventive Maintenance BZ BZ FAC 9/2/13 16:53 9/7/13 22:09 9/2/13

252672 3245BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 9/2/13 15:30 9/2/13 16:00 9/2/13

252546 3245BG02 Grounds Keeping Weekly Completed BG-FAC-30-V-1 GROUNDS, OPERATIONS AREA 570.007 PM-Preventive Maintenance BG BG FAC 9/2/13 14:15 9/2/13 17:15 9/2/13

252545 3245BG01 JUNIPER/CISCO WEEKLY CHECKS Completed 31522 JUNIPER/CISCO 315.007 PM-Preventive Maintenance BG BG COMM 9/2/13 14:00 9/2/13 14:15 9/2/13

252679 3245TE95 Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 9/2/13 0:00 9/2/13 23:59

252669 3222BZ04B MULTIPLE PROCESSOR FAULTS Awaiting Maint 030597 RADAR VAN CM-AFTO95 BZ BZ TPS70 9/1/13 20:00 9/30/13

252667 3244SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 9/1/13 20:00 9/1/13 20:15 9/1/13

252671 3244BZ98 Radar down due to troubleshooting multiple processor faults Completed 030597 RADAR VAN AD-Admin BZ BZ SIF 9/1/13 19:00 9/1/13 20:00

252670 3244BZ99 Radar down due to troubleshooting multiple processor faults Completed 030597 RADAR VAN AD-Admin BZ BZ TPS70 9/1/13 19:00 9/1/13 20:00

252668 3222BZ04A MULTIPLE PROCESSOR FAULTS Completed 030597 RADAR VAN CM-AFTO95 BZ BZ TPS70 9/1/13 19:00 9/1/13 20:00 9/30/13

252220 JUNIPER/CISCO MONTHLY CHECKS Completed 015032 JUNIPER CTP 315.028 PM-Preventive Maintenance AS CR COMM 9/1/13 18:00 9/1/13 18:15 9/2/13

252221 EQUIP ROOM RACK CLEANING AND INSPECTION Completed AS-SITE SAN JOSE AIR SURVEILLANCE SITE 490.028 PM-Preventive Maintenance AS CR FAC 9/1/13 17:45 9/1/13 18:15 9/2/13

252224 EQUIP ROOM RACK CLEANING AND INSPECTION Completed CO-SITE SAN JOSE COSESNA SITE 490.028 PM-Preventive Maintenance CO CR FAC 9/1/13 17:00 9/1/13 17:30 9/2/13

252659 3244BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 9/1/13 16:00 9/1/13 16:30 9/1/13

252222 EQUIP ROOM RACK CLEANING AND INSPECTION Completed CE-SITE SAN JOSE CENCE SITE 490.028 PM-Preventive Maintenance CE CR FAC 9/1/13 14:45 9/1/13 15:15 9/2/13

252834 3244MD01 Fuel Level Check Open MD-FAC-70-A TANK, FUEL #1 540.001 PM-Preventive Maintenance MD MD FAC 9/1/13 13:00 9/1/13 13:05 9/9/13

252223 EQUIP ROOM RACK CLEANING AND INSPECTION Completed CG-SITE SAN JOSE COAST GUARD SITE 490.028 PM-Preventive Maintenance CG CR FAC 9/1/13 12:45 9/1/13 13:20 9/2/13

252673 3244TE95 Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 9/1/13 0:00 9/1/13 23:59

252666 3243SA02 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 8/31/13 20:00 8/31/13 20:15 9/1/13

252519 3243BZ04 EQUIP ROOM RACK CLEANING & INSPECTION Completed BZ-SITE BELIZE SITE 490.007 PM-Preventive Maintenance BZ BZ COMM 8/31/13 20:00 8/31/13 21:00 8/26/13

252077 3243BZ03 MISCELLANEOUS BUILDING MONTHLY Completed BZ-FAC-30-U-1 BUILDING, OPERATION AREA GUARDHOUSE 573.028 PM-Preventive Maintenance BZ BZ FAC 8/31/13 19:00 8/31/13 20:00 8/26/13

252660 3243BZ05 Water Pump leaking from outlet to reservoir Completed BZ-FAC-60 WATER SYSTEMS CM-AFTO95 BZ BZ FAC 8/31/13 18:15 8/31/13 20:15 9/30/13

252076 3243BZ02 MISCELLANEOUS BUILDING MONTHLY Completed BZ-FAC-30-D BATHROOM BUILDING 573.028 PM-Preventive Maintenance BZ BZ FAC 8/31/13 18:00 8/31/13 19:00 8/26/13

252651 3243BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 8/31/13 16:00 8/31/13 16:30 8/31/13

252833 3243MD01 Fuel Level Check Completed MD-FAC-70-A TANK, FUEL #1 540.001 PM-Preventive Maintenance MD MD FAC 8/31/13 15:00 8/31/13 15:05 9/9/13

252098 VEHICLE MONTHLY WAXING Completed 10X1413 Frontier 3.2 L 4X4 900.028 PM-Preventive Maintenance CA CR VEH 8/31/13 13:00 8/31/13 14:00 8/26/13

252521 VEHICLE WEEKLY WASHING Completed 10X1413 Frontier 3.2 L 4X4 900.007 PM-Preventive Maintenance CA CR VEH 8/31/13 12:30 8/31/13 13:00 8/26/13

252029 3243SA01 Fuel Delivery Visual Quality Sample Completed SA-FAC-70 FUEL SYSTEMS 540.AR CM-Corrective Maintenance SA SA FAC 8/31/13 12:00 8/31/13 13:00

252680 3243RH01 Fuel Level Check Completed RH-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance RH RH FAC 8/31/13 6:00 8/31/13 8:00 9/3/13

252663 3243TE95 Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 8/31/13 0:00 8/31/13 23:59

252645 3242SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 8/30/13 20:00 8/30/13 20:15 8/30/13

252510 VEHICLE WEEKLY WASHING Completed 10X8665 TRUCK, FLATBED, PICK UP 900.007 PM-Preventive Maintenance BW BW VEH 8/30/13 18:33 8/30/13 21:23 8/26/13

252091 VEHICLE MONTHLY WAXING Completed 10X8665 TRUCK, FLATBED, PICK UP 900.028 PM-Preventive Maintenance BW BW VEH 8/30/13 18:32 8/30/13 21:26 8/26/13

252484 3242BZ03 Fuel System Weekly Completed BZ-FAC-70 FUEL SYSTEMS 540.007 PM-Preventive Maintenance BZ BZ FAC 8/30/13 18:30 8/30/13 19:00 8/26/13

251945 3242BZ02 Fire Fighting Equipment Monthly Completed BZ-SITE BELIZE SITE 584.028 PM-Preventive Maintenance BZ BZ FAC 8/30/13 18:00 8/30/13 18:30 8/26/13

252614 3242BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 8/30/13 15:00 8/30/13 15:00 8/30/13

252505 3242BZ03 SATCOM WEEKLY CHECKS Completed 030185 ANTENNA FLYAWAY 381.007 PM-Preventive Maintenance BZ BZ COMM 8/30/13 14:15 8/30/13 14:45 8/26/13

252648 EVALUATION SN 1D17712G01 PN 1069 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 8/30/13 13:30

252832 3242MD01 Fuel Level Check Completed MD-FAC-70-A TANK, FUEL #1 540.001 PM-Preventive Maintenance MD MD FAC 8/30/13 13:00 8/30/13 13:05 9/9/13

248264 6 MONTH OR 400 HOUR SERVICING FOR FORKLIFT Completed 03X0268 FORKLIFT TRUCK, ELECTRIC 910.168 PM-Preventive Maintenance BW BW VEH 8/30/13 11:58 8/30/13 13:20 8/19/13

252644 3242RH01 Fuel Level Check Completed RH-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance RH RH FAC 8/30/13 6:00 8/30/13 8:00 8/30/13

252656 3242TE95 Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 8/30/13 0:00 8/30/13 23:59

252633 repair pn UPA-59A sn 7230-002 Awaiting Maint MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW 8/29/13 21:13

252632 PURCHASE SERVICE: TOOLS AND COMSUMABLES WORK MDM - MD Completed BW BOGOTA WAREHOUSE LG-Admin BW BW FAC 8/29/13 21:10 8/29/13 21:22

252630 repair pn 1D18189G02 sn 1550 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 8/29/13 21:07 9/4/13 13:10

252631 BATTERY 12V LUV D MAX ECN: 10X8665 BW Awaiting Maint BW BOGOTA WAREHOUSE LG-Admin BW BW VEH 8/29/13 21:06

252628 repair pn 1D27749G02 sn 1014 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 8/29/13 20:49 9/4/13 13:34

252627 repair pn 1D24351G01 sn 204 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 8/29/13 20:41 9/4/13 14:39

252343 3241TE03 HF Radio BITE test and Filter Cleaning Completed 029768 Equipment Rack with Patch Panels 413.014 PM-Preventive Maintenance TQ TQ COMM 8/29/13 20:10 8/29/13 20:20 8/26/13

252611 3241SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 8/29/13 20:00 8/29/13 20:15 8/29/13

252344 3241TE02 HF Radio BITE test and Filter Cleaning Completed 029766 Sunair Equipment Rack, (sunair rack #2) 413.014 PM-Preventive Maintenance TQ TQ COMM 8/29/13 20:00 8/29/13 20:10 8/26/13

252626 repair pn 1D27270G01 sn 1098 Completed MW-SITE MELBOURNE WAREHOUSE SITE LG-Admin MW MW * 8/29/13 19:08 9/4/13 13:53

252471 3241TE01 TADIL / SECURE COMM WEEKLY CHECKS & CLEANING DTS Completed 33822 CABINET, COMMUNICATIONS (#3) 457.007 PM-Preventive Maintenance TQ TQ COMM 8/29/13 15:50 8/29/13 16:00 8/26/13

252598 3241bz01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 8/29/13 15:00 8/29/13 15:30 8/29/13

252831 3241MD01 Fuel Level Check Completed MD-FAC-70-A TANK, FUEL #1 540.001 PM-Preventive Maintenance MD MD FAC 8/29/13 13:00 8/29/13 13:05 9/9/13

252035 3241DMET03 JUNIPER CISCO MONTHLY CHECKS Completed 030687 Circuit-to-Packet AC Chassis 315.030 PM-Preventive Maintenance DMET DMET COMM 8/29/13 13:00 8/29/13 13:30 9/2/13

252028 3241DMET04 Grounds Keeping Weekly Completed 030803 Equipment Shelter 570.030 PM-Preventive Maintenance DMET DMET FAC 8/29/13 13:00 8/29/13 14:00 9/2/13

252037 3241DMET02 SATCOM Carrier Monthly Checks Completed 030803 Equipment Shelter 381.030 PM-Preventive Maintenance DMET DMET COMM 8/29/13 11:00 8/29/13 13:00 9/2/13

250467 3241DMET01 SATCOM QTRLY INTERNAL EQUIP CHECKS & CLEAN Completed 030803 Equipment Shelter 380.090 PM-Preventive Maintenance DMET DMET COMM 8/29/13 11:00 8/29/13 13:00 9/5/13

252643 3241RH01 Fuel Level Check Completed RH-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance RH RH FAC 8/29/13 6:00 8/29/13 8:00 8/30/13

252451 3241BG02 Cummins Diesel Engine Weekly Completed BG-FAC-20-A-1 ENGINE, DIESEL A 521.007 PM-Preventive Maintenance BG BG GEN 8/29/13 1:30 8/29/13 2:30 8/26/13

252480 3241BG01 Operations Building Weekly Completed BG-FAC-30-A BUILDING, OPERATIONS AND MAINTENANCE 575.007 PM-Preventive Maintenance BG BG FAC 8/29/13 0:30 8/29/13 1:30 8/26/13

252646 3241TE95 Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 8/29/13 0:00 8/29/13 23:59

252506 3240BZ07 WATER TREATMENT SYSTEM WEEKLY Completed BZ-FAC-60 WATER SYSTEMS 587.007 PM-Preventive Maintenance BZ BZ FAC 8/28/13 21:00 8/28/13 21:30 8/26/13

252579 3240SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 8/28/13 20:00 8/28/13 20:00 8/28/13

252483 3240BZ06 Grounds Keeping Weekly Completed BZ-FAC-30-V-1 GROUNDS, OPERATIONS AREA 570.007 PM-Preventive Maintenance BZ BZ FAC 8/28/13 20:00 8/28/13 21:00 8/26/13

252609 3240BZ99A ADMIN WO TO CAPTURE RADAR DOWNTIME Completed 030597 RADAR VAN AD-Admin BZ BZ TPS70 8/28/13 19:25 8/28/13 19:55

252608 3240BZ08 TRANSMITTTER OIL OUT OF SPECS - REPLACE Completed 030597 RADAR VAN CM-Corrective Maintenance BZ BZ TPS70 8/28/13 19:25 8/28/13 19:55

252516 3240BZ05 I-F RECEIVER PERF ROUTINE Completed 030597 RADAR VAN 105.007 PM-Preventive Maintenance BZ BZ TPS70 8/28/13 18:40 8/28/13 19:55 8/26/13

252399 3240BZ04 INDEPENDENT IFF/SIF SYSTEM TEST Completed 030543 RACK ASSEMBLY, IFF 107.014A PM-Preventive Maintenance BZ BZ SIF 8/28/13 17:45 8/28/13 18:00 8/26/13

251944 3240BZ03 FREQ GEN COHO REF OUTPUT CHECK Completed 030597 RADAR VAN 110.028 PM-Preventive Maintenance BZ BZ TPS70 8/28/13 17:30 8/28/13 17:45 8/26/13

252600 3240BZ99 ADMIN WORKORDER TO CAPTURE RADAR PMI DOWNTIME Completed 030597 RADAR VAN AD-Admin BZ BZ TPS70 8/28/13 17:00 8/28/13 19:25

252599 3240BZ98 ADMIN WORKORDER TO CAPTURE SIF PMI DOWNTIME Completed 030543 RACK ASSEMBLY, IFF AD-Admin BZ BZ SIF 8/28/13 17:00 8/28/13 19:55

252402 3240BZ02 SHELTER CLEANING, INSPECTION & SERVICING Completed 030597 RADAR VAN 107.014B PM-Preventive Maintenance BZ BZ TPS70 8/28/13 17:00 8/28/13 19:00 8/26/13

252022 3240DMET07 Lighting Monthly Completed 030803 Equipment Shelter 515.030 PM-Preventive Maintenance DMET DMET FAC 8/28/13 16:00 8/28/13 16:15 9/2/13

252555 3240BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 8/28/13 15:30 8/28/13 16:00 8/28/13

250469 3240DMET08 SATCOM ANTENNA QUARTERLY INSPECTION Completed 030806 Earth Station Antenna, 7.3m 320.090 PM-Preventive Maintenance DMET DMET COMM 8/28/13 15:00 8/28/13 17:00 9/5/13

252026 3240DMET04 ECU Units Monthly Completed 030801 Wall-Mount Air Conditioner 530.030 PM-Preventive Maintenance DMET DMET FAC 8/28/13 14:00 8/28/13 15:00 9/2/13

252601 3247MD01 Fuel Level Check Completed MD-FAC-70-A TANK, FUEL #1 540.001 PM-Preventive Maintenance MD MD FAC 8/28/13 13:00 8/28/13 13:05 8/28/13

252027 3240DMET03 ECU Units Monthly Completed 030800 Wall-Mount Air Conditioner 530.030 PM-Preventive Maintenance DMET DMET FAC 8/28/13 13:00 8/28/13 14:00 9/2/13

252023 3240DMET06 Auto Transfer Switch Monthly Completed 030765 Generac Transfer System 517.030 PM-Preventive Maintenance DMET DMET GEN 8/28/13 13:00 8/28/13 13:30 9/2/13

252021 3240DMET05 GENERAC GENERATOR MONTHLY CHECKS Completed 030766 Generac 40KW Generator Set 523.030 PM-Preventive Maintenance DMET DMET GEN 8/28/13 13:00 8/28/13 14:00 9/2/13

252583 PURCHASE SERVICE: BATTERY MAC P/N: 34R950 FOR LUV D - MAX ECN: 10X8665 BW Completed BW BOGOTA WAREHOUSE LG-Admin BW BW VEH 8/28/13 11:36 8/28/13 11:40

252038 3240DMET02 SATCOM MONTHLY SHELTER AND SERVER ROOM CLEANING & INSPECTION & REDUNDANT CHECKS Completed 030803 Equipment Shelter 380.030 PM-Preventive Maintenance DMET DMET COMM 8/28/13 8:00 8/28/13 12:00 9/2/13

252642 3240RH01 Fuel Level Check Completed RH-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance RH RH FAC 8/28/13 6:00 8/28/13 8:00 8/30/13

252449 3240BG03 SATCOM WEEKLY CHECKS Completed 22002 EQUIPMENT, TERRESTRIAL 381.007 PM-Preventive Maintenance BG BG COMM 8/28/13 5:00 8/28/13 6:00 8/26/13

252002 3240BG02 Fire Fighting Equipment Monthly Completed BG-SITE BOGOTA HNCC SITE 584.028 PM-Preventive Maintenance BG BG FAC 8/28/13 1:30 8/28/13 2:30 8/26/13

252149 SIG PROC CKT CARD CLEAN & SF6 FAN REPLACE Open 40052 RADAR SET GROUP, AN/TPS-70(v)5 119.336 PM-Preventive Maintenance RH RH TPS70 8/28/13 0:56 4/29/13

252001 3240BG01 Fire Alarm System Monthly Completed BG-FAC-120-A FIRE ALARM SYSTEM 582.028 PM-Preventive Maintenance BG BG FAC 8/28/13 0:30 8/28/13 1:30 8/26/13

252610 3240TE95 Administrative work order to capture downtime for COMM Completed SATCOM SATCOM SYSTEM AD-Admin TQ TQ COMM 8/28/13 0:00 8/28/13 23:59

252543 3239SA01 Fuel Level Check Completed SA-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance SA SA FAC 8/27/13 20:00 8/27/13 20:15 8/27/13

252565 3239KW06 IEV floor tiles need replaced Open KW-FAC-30-Z SATCOM BUILDING CM-Corrective Maintenance KW KW FAC 8/27/13 18:00 9/27/13

252567 3239BZ10 Processor reset Completed 030543 RACK ASSEMBLY, IFF CM-Corrective Maintenance BZ BZ SIF 8/27/13 17:50 8/27/13 17:58

252566 3239BZ98 ADMIN W/O TO CAPTURE SIF DOWNTIME Completed 030543 RACK ASSEMBLY, IFF AD-Admin BZ BZ SIF 8/27/13 17:50 8/27/13 17:58

252564 3239BZ99 ADMIN WO to capture RARAR DOWNTIME Completed 030597 RADAR VAN AD-Admin BZ BZ TPS70 8/27/13 17:50 8/27/13 17:58

252563 3239BZ09 Processor reset Completed 030597 RADAR VAN CM-Corrective Maintenance BZ BZ TPS70 8/27/13 17:50 8/27/13 17:58

251973 Fire Fighting Equipment Monthly Completed KW-SITE KEY WEST ET SITE 584.028 PM-Preventive Maintenance KW KW FAC 8/27/13 16:45 8/27/13 17:15 8/26/13

252496 3239KW04 JUNIPER/CISCO WEEKLY CHECKS Completed 31501 JUNIPER/CISCO 315.007 PM-Preventive Maintenance KW KW COMM 8/27/13 16:30 8/27/13 16:45 8/26/13

252526 3239BZ01 Fuel Level Check Completed BZ-FAC-70 FUEL SYSTEMS 540.001 PM-Preventive Maintenance BZ BZ FAC 8/27/13 15:00 8/27/13 15:30 8/27/13

252499 3239KW03 KW SATCOM WEEKLY SHELTER CLEANING & INSPECTION Completed 01700 SHELTER, IEV 380.007 PM-Preventive Maintenance KW KW COMM 8/27/13 15:00 8/27/13 16:00 8/26/13

252498 3239KW02 KW SATCOM WEEKLY SHELTER CLEANING & INSPECTION Completed 01800 SHELTER, BBEV 380.007 PM-Preventive Maintenance KW KW COMM 8/27/13 14:00 8/27/13 15:00 8/26/13

252095 3239bz07 ECU Units Monthly Completed BZ-FAC-40-B-2 COMMERCIAL ENVIRONMENT CONTROL UNITS, GROUP #2 530.028 PM-Preventive Maintenance BZ BZ FAC 8/27/13 13:45 8/27/13 14:15 8/26/13

252000 3239BG03 Power ISO/Bldg Monthly Completed BG-FAC-30-E GENSET BUILDING 572.028 PM-Preventive Maintenance BG BG FAC 8/27/13 13:30 8/27/13 14:30 8/26/13

252544 SERVICE: BENCH VISES TOOL AS SUPPORT FOR REPAIR DEPOT CMR Completed BW BOGOTA WAREHOUSE LG-Admin BW BW FAC 8/27/13 13:09 8/27/13 13:12

252597 3239MD01 Fuel Level Check Completed MD-FAC-70-A TANK, FUEL #1 540.001 PM-Preventive Maintenance MD MD FAC 8/27/13 13:00 8/27/13 13:05 8/28/13

252497 3239KW01 Operations Building Weekly Completed KW-FAC-30-A BUILDING, OPERATIONS AND MAINTENANCE 575.007 PM-Preventive Maintenance KW KW FAC 8/27/13 13:00 8/27/13 14:00 8/26/13

252094 3239bz06 ECU Units Monthly Completed BZ-FAC-40-B-1 COMMERCIAL ENVIRONMENT CONTROL UNITS, GROUP #1 530.028 PM-Preventive Maintenance BZ BZ FAC 8/27/13 13:00 8/27/13 13:45 8/26/13

252447 3239bz05 UPA-62 WEEKLY CHECKS Completed 030541 PPI Display Radar 132.007 PM-Preventive Maintenance BZ BZ TPS70 8/27/13 10:15 8/27/13 10:15 8/26/13

252448 3239bz04 GPS-13 MIN PERFORMANCE CHECKS Completed 030543 RACK ASSEMBLY, IFF 124.007 PM-Preventive Maintenance BZ BZ…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .