Attachment 1 - Draft PWS.pdf

PDF 582 KB Posted

Attached to
57th Wing Weapons School CAT/CWD
Solicitation number
FA4890-12-R-0002
Issued by

About this file

DRAFT PWS - Weapons School CAT/CWD

View the file

Other files

File Type Posted
Attachment 3 - Draft DD254.pdf PDF
DRAFT FA4890-12-R-0002.pdf PDF
Attachment 2 - CBA WD.pdf PDF
29 Nov - DRAFT WS PWS v1 8 —
29 Nov-WS Style Guide 2011 Ver 2 2.doc DOC document
WS Sources Sought ATTACHMENT 2_28 Nov 11.docx DOCX document
WS Sources Sought ATTACHMENT 1_28 Nov 11.docx DOCX document
draft DD254 Ver 1.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

57 Wing PWS Contract NO. FA4890-XX-C-XXXX

Solicitation NO. FA4890-12-R-0002

Ver. 2.0 02/06/2012

DRAFT

PERFORMANCE WORK STATEMENT (PWS)

FOR

57th WING CONTRACT AIRCREW TRAINING

AND

COURSEWARE DEVELOPMENT

57 Wing PWS Contract NO. FA4890-XX-C-XXXX ii

TABLE OF CONTENTS

SECTIONS Page

SECTION 1 -- DESCRIPTION OF SERVICES:

1.1 SCOPE OF WORK:

1.2 GOALS:

1.3 RISK MANAGEMENT:

1.4 GENERAL INFORMATION:

1.5 CONTRACT AIRCREW TRAINING:

1.6 COURSEWARE DEVELOPMENT:

1.7 GENERAL TASKS:

SECTION 2 -- SERVICE DELIVERY SUMMARY:

SECTION 3 -- GOVERNMENT-FURNISHED/CONTRACTOR-FURNISHED PROPERTY:

3.1 GENERAL INFORMATION:

3.2 GOVERNMENT-FURNISHED FACILITIES, GOVERNMENT-MAINTAINED:

3.3 GOVERNMENT-FURNISHED MATERIALS, CONTRACTOR-MAINTAINED:

3.4 GOVERNMENT-FURNISHED SERVICES:

3.5 CONTRACTOR FURNISHED EQUIPMENT:

SECTION 4 -- GENERAL INFORMATION:

4.1 CONTRACTOR PERSONNEL:

4.2 SECURITY REQUIREMENTS:

4.3 SITE MANAGER (SM):

4.4 EMPLOYEE QUALIFICATIONS:

4.5 GOVERNMENT RIGHTS TO DELIVERABLES:

4.6 HOURS OF OPERATION:

4.7 GENERAL DEFINITIONS:

4.8 TECHNICAL DEFINITIONS:

4.9 SMALL COMPUTER EQUIPMENT CONFIGURATION:

4.10 LIST OF ACRONYMS:………………………………………………………………………………………………29

APPENDIX 1 -- WORK LOAD ESTIMATES:

APPENDIX 2 -- SYLLABUS INVENTORY:

APPENDIX 3 -- PUBLICATIONS AND FORMS:

APPENDIX 4 – DELIVERABLES:

57 Wing PWS Contract NO. FA4890-XX-C-XXXX

SECTION 1 - DESCRIPTION OF SERVICES

1.1 SCOPE OF WORK

1.1.1 Except for the property and services specifically stated as Government-furnished in Section 3 of this

Performance Work Statement (PWS), the contractor will furnish all personnel, equipment, tools, materials, supervision, and all other items and services that are required to perform 57th Wing (USAF Weapons

School, 57th Operations Group, 57th Adversary Tactics Group, Red Flag, or others, referenced by optional

Contract Line Items ( CLINS) Contract Aircrew Training and Courseware Development (CAT/CWD) at

Nellis AFB, NV and other places of performance as required. The contract may be modified in the future to include additional crew positions and training. The contractor will perform to the standards specified in this contract. The contract contains optional CLINS to include the performance of (1) addition of new

Weapons School Squadrons (2) Additional Support for existing Weapons School CAT/CWD; (3) Air

Ground Operations School (AGOS) CWD; and (4) 57th Adversary Tactics Group (ATG) CAT/CWD.

Estimated workload for CAT/CWD is specified in Appendix 1. This contract is scheduled for a phase-in period, one 10 month base period (FY13) followed by 4, one-year options (FY14-17).

1.2.1 Budget. The Government has budgeted for all CLINS to be exercised for this acquisition. This budget includes the base year, all four option years, all optional CLINs and phase-in. Due to budget constraints levied by the Government, this requirement can undergo negotiations to modify the efforts to meet the Government’s budget objective anytime during contract performance.

1.2 GOALS

1.2.1 The goals of the 57th Wing CAT/CWD Contract are: 1) Maximize operational effectiveness and combat capability; 2) To preserve Air Force personnel and material resources.

1.3 STRIKE MITIGATION PLAN

1.3.1 The contractor shall formulate and submit a Strike Mitigation Plan that specifically addresses the contractor’s strategy to continue service during any labor dispute. At a minimum, the plan shall address 1)

Alternate sources of manning to replace the striking workforce; 2) Detail priority actions in the event the contractor cannot cover 100 percent of the requirement; 3) Time phase to allow for ramp up of manpower, clearances, etc; 4) Draw clear lines of authority; 5) Identify the company’s Program Manager to be responsible for coordination with the Contracting Office and Quality Assurance Personnel, ACC TRSS PM and Base Leaders if required, both prior to and during a strike; 6) How the contractor plans to maintain security; 7) Acknowledge the company’s responsibility of timely notifications and communications with the Contracting Office from the time a known problem may exist. This plan shall be submitted concurrent with the contractor’s proposal.

1.4 GENERAL INFORMATION

1.4.1 The following sections contain those tasks required to accomplish CAT/CWD in accordance with the requirements of this PWS. Specific tasks for this contract are divided into three categories: (1) CAT, (2)

CWD, and (3) General Tasks.

1.5 CONTRACT AIRCREW TRAINING (CAT)

1.5.1 The contractor will conduct academic instruction in support of formal course syllabi, training plans, event lesson plans, and Continuation Training (CT) to formal course students and permanent party aircrew to accomplish required event objectives and specific event tasks. Academic instruction will be accomplished during the hours of operation as specified in Section 4, paragraph 4.6.1. Academic instruction will include platform academic instruction, remedial training, and monitoring of computer-based and self-paced instruction periods. In addition to the specific tasks outlined below, instructor duties will consist of revision and development of student training lesson plans as syllabus or Air Force

Tactics/Techniques and Procedures (AFTTP) change due to mission/event or safety requirements. At this time there is no training device workload specified for the Weapons School, however, workload could be added by a modification to the PWS. If training devices are added, instructor duties will include providing

57 Wing PWS Contract NO. FA4890-XX-C-XXXX

Air Force or contract maintenance personnel with event data to transform training device events into software format for entry into the training device. The required mix of dual-qualified (academic and training device instructors) contract personnel will be left to the discretion of the contractor. Refer to

Appendix 1 for work load estimates applicable to the CAT.

1.5.2 Standard of Performance for Instructors. The standards of performance for instructors shall be equivalent to completion standards of the applicable instructor upgrade training course and the aAcademic

Instructor Course (AIC). The contractor will provide academic instruction to allow students to achieve the learning objectives associated with applicable syllabi or training plans. In general, accomplishment of learning objectives will be evaluated by written tests, and in-flight instruction. Deficiencies in student academic objective achievements identified by test trend analysis will be presented at the Curriculum

Reviews (refer to Section 1, paragraph 1.7.2.1.). The contractor’s Quality Program Plan will provide measures to correct identified trends. Contract instructors will have a working knowledge of all applicable publications listed in Appendix 3 Para 3.4.1 of this PWS. Air Traffic Control service and radio calls used will be in accordance with the most current edition of the Federal Aviation Administration Order 7110.65P and local directives.

1.5.3 Academic Instruction Specific Tasks. The contractor will perform academic instruction as required by the applicable syllabi or training plans utilizing lesson plans to accomplish required lesson tasks. The contractor will perform the following tasks:

1.5.3.1 Prepare classroom for instruction.

1.5.3.2 Issue, track, and receive any lesson-related student materials or equipment as required. This does not include individual student publications distributed by Government personnel, such as, any operational

Technical Order (T.O.), Air Force Manual (AFM), Air Force Handbook (AFH), Air Force Instruction

(AFI), and/or Wing Instruction.

1.5.3.3 Monitor self-paced and computer-based instruction to provide academic instruction as required.

The contractor will be responsible for the proper use of the equipment and will report any equipment problems IAW the Local Operating Procedures (LOP).

1.5.3.4 Provide make-up instruction of academic lessons to students who have missed class or have failed an examination.

1.5.3.5 Provide remedial student training. Remedial training will be in accordance with the appropriate syllabus or training plan. Remediation will be scheduled IAW LOP. Remedial training will be scheduled to allow continued normal progression in the syllabus or training plan.

1.5.3.6 Provide Instrument Refresher Course (IRC) instruction for Nellis AFB not exceeding 12 times per year.

1.5.3.7 Administer, score, and debrief student examinations IAW established policy.

1.5.3.8 Accomplish and archive trend analysis and evaluation as described in AFMAN 36-2234, AFH 36-

2235, USAFWS OI 36-1 and 36-2. Analyze all examination results for trends toward faulty questions and deficient instruction. Maintain analysis results in corresponding lessons production folder. The contractor will provide measures to correct identified trends.

1.5.3.9 Develop, review, and respond to the Training Quality Assurance Personnel (TQAP) and

Courseware Quality Assurance Personnel (CWQAP) issues surfaced during end-of-block, end-of-course critiques, and graduate evaluations. Coordinate all student comments, critiques and courseware corrections, to include errata sheets, with the Government prior to use in the classroom.

57 Wing PWS Contract NO. FA4890-XX-C-XXXX

1.5.3.10 When required, perform as flight evaluation board or mishap (i.e., safety and/or accident) investigation board witness.

1.5.3.11 Manage academic programs (i.e., configuration control) to comply with AF directives.

1.5.3.12 Develop and maintain continuity folders, production folders, and student grade books, as required.

1.5.3.13 Maintain audiovisual library, films, tapes, and lesson courseware. This includes as a minimum, posting changes, maintaining the master lesson courseware for all syllabus required lessons (including Air

Force taught lessons).

1.5.3.14 Manage, control, and operate academic equipment (e.g: projectors, televisions, computers, CBT, smart-board, etc.).

1.5.3.15 Maintain reference materials used in support of academic courseware. This includes any T.O., reference notes, publications, IRC material, publications, etc.

1.5.3.16 Maintain training tasks list (TTL) database for all courses.

1.5.4 Training Workload Management Plan. The contractor will develop a plan which outlines its management approaches, methods, innovations and policies for ensuring all required aircrews will be trained in accordance with this PWS. This plan will include the contractor’s workload analysis to include long and short range planning, as well as the contractor’s proposed scheduling procedures. The plan shall be submitted concurrent with the offeror’s proposal.

1.6 COURSEWARE DEVELOPMENT (CWD)

1.6.1 Contractor personnel shall produce, update, review, and revise all of the courseware materials required to support academic instruction, training device instruction, and flight phases of the training covered under this contract. The contractor will develop all courseware using the most current model of

Instructional Systems Development (ISD) as defined in AFMAN 36-2234 and AFH 36-2235. Courseware materials will support formal course programs and CT programs, and may be used for resident and non-resident training. Courseware materials are affected by aircraft hardware, software, tactics, local course rules, flight information publications, and safety publications.

1.6.2 ISD Management Plan. The plan shall be submitted concurrent with the offeror’s proposal.

1.6.2.1 Format and Content. The report will be in contractor format. The report will include the following sections:

1.6.2.2 Executive Summary. This section will summarize the purpose and scope of the ISD effort and associated support effort. It will address the program management and technical management objectives, quality control methods and procedures, and the standards used to establish the organization, structure, manning, and skill levels of the program team. This section will also describe how ISD organizational functions, responsibilities, and support requirements are implemented in the training system. Summary scheduling information and program phasing of major task breakouts will be included. Program tasks will be correlated with key ISD tasks or events that can be observed and verified. Lastly, this section will summarize the total magnitude of the ISD effort for the training system in terms of the overall work effort, time required, impacts, expected results, and products.

1.6.2.3 Technical Approach. This section will describe the specific technical approach, methods, and procedures used to apply the ISD process to the training system (refer to AFH 36-2235 for guidance). This section will describe the built-in mechanisms used to control and manage the technical requirements for the

57 Wing PWS Contract NO. FA4890-XX-C-XXXX

ISD process. This section will also describe how ISD principles and practices are incorporated into the design and development of the training system. ISD tasks will be correlated with the completion of deliverable products (i.e., data courseware and software). Work units will be identified with the technical requirements of the training program.

1.6.2.4 Program Management. This section will describe how the ISD effort is managed for the total training program. Special emphasis will be given to ISD management of the training system by functional areas of: Management, Administration, Delivery, Evaluation, and Support (refer to AFH 36-2235, Volume

3). Functional areas of the ISD process will be grouped by ISD phases as follows: Analysis, Design, Development, and Implementation (refer to AFH 36-2235, Volume 3).

1.6.2.5 Program Constraints and Assumptions. This section will describe constraints (i.e., limiting factors) to, and assumptions of, the ISD effort. This section will also describe any impacts these constraints and assumptions could, or will, have on the overall training program. Lastly, this section will describe any new or revised procedures, which could affect the managerial, acquisition, or technical aspects of the program as a result of applying ISD constraints and assumptions.

1.6.2.6 Risk Management. This section will describe the systematic approach used to identify and manage the risks associated with the application of the ISD process, especially the CWD effort. This section will also include a description of the technical performance measures (i.e., metrics) used to evaluate the effectiveness of applying ISD principles and practices to the training system over its life cycle. Technical performance measures will include criteria to measure the quantity, quality, and timeliness of performance parameters selected for surveillance of the ISD effort (e.g., development hours required per hour of computer-based instruction).

1.6.2.7 Milestones. This section will identify milestones and time phasing of each task included in the

Services Delivery Summary (SDS) of this contract (refer to Section 2). Special emphasis will be given to the development, review, revision, and delivery of courseware.

1.6.2.8 Quality Control. This section will describe the minimum contents of the contractor's Quality

Program Plan (QPP). As a minimum, the QPP will contain the items listed in the PWS.

1.6.2.8.1 Describe the inspection system used to cover all services listed in the SDS (refer to Section 2).

The description will include specifics as to the areas to be inspected on both a scheduled and unscheduled basis, frequency of inspections, and the title and organizational placement of the inspectors. Areas will include, but are not limited to, in-progress training, reviewing documentation, utilizing student critiques, questioning personnel on instructional techniques, review of courseware drafts, and review of finalized courseware materials.

1.6.2.8.2 Describe the records to be kept to document inspections and corrective or preventive actions taken. The records of inspections will be kept and made available to the Government upon request and throughout the contract performance period and for the period after contract completion until final settlement of any claim made under this contract.

1.6.2.8.3 Specify the contractor's control procedures for Government-provided cipher combinations, keys, lock combinations, and safe combinations (refer to PWS, Section 1.7.11).

1.6.2.9 Organization and Staffing. This section will describe the organizational structure that will meet the

ISD requirements of the training program. The organizational elements responsible for implementing the

ISD process in the training program will also be described, along with their relationship to other supporting organizational elements (e.g., System Engineering, Logistics, Test, etc.). The extent of authority delegated to each element for accomplishment of the ISD effort will be clearly defined. Organizations participating in the management of, or contribution to, the ISD effort will be identified and their specific roles, responsibilities, functions, and interactions will be delineated and will be displayed in a functional matrix.

57 Wing PWS Contract NO. FA4890-XX-C-XXXX

1.6.2.10 Coordination and Communication. This section will describe the plans for ensuring effective communications among all ISD participants. The processes and procedures to be used for coordination of the ISD effort and data exchange between agencies, and within the chain of authority will also be described.

1.6.2.11 Acquisition and Utilization of Resources. This section will describe how resources will be acquired and utilized for accomplishment of the ISD effort over the life cycle of the training system. This section will also identify and describe the quantities and types of resources required for the total ISD effort.

Resources include manpower, personnel, equipment, materials, and facilities. Long-lead items and critical items such as those that may affect concurrence of the training system with the parent system will also be identified in this section. Lastly, this section will identify resource problem areas, which could affect scheduling, funding, or personnel-loading and will describe feasible solutions to these problem areas.

1.6.2.12 Training of personnel. This section will describe the training provided to personnel to accomplish the ISD effort. Special emphasis will be placed on a description of any required training in the specific technical approach, methods, and procedures used to apply the ISD process to the training system. This section will also identify the quantities, types, and skills of personnel requiring ISD training. This section will present scheduling information for ISD training and include a description of the events, periods, and duration of training. Scheduling information should be tied to, and correlated with, other significant program milestones.

1.6.2.13 Other considerations. This section will contain any ISD considerations that are not addressed in other sections of the contractor's ISD management plan.

1.6.3 Existing Courseware. All existing courseware is Air Force property, and will be transferred to the contractor in its current condition. Courseware will not be destroyed or disposed of without knowledge and consent of the TQAP. During solicitation, all interested parties will have a chance to view existing courseware at a date and time specified by the Contracting Officer. The Government shall transfer existing courseware to the new contractor during the phase-in period on a noninterference basis.

1.6.4 Courseware Delivery Schedule (CDS). The contractor will develop, coordinate, and produce a definitive CDS that will identify the milestones and time phasing of courseware delivery that will occur during the next fiscal year. Special emphasis will be given to milestones at which key ISD tasks or events produce deliverable data or intermediate products of the courseware delivery process. The contractor will provide the initial CDS to the CWQAP no later than 45 days after contract award. For subsequent option years, the contractor will provide the CDS to the CWQAP annually no later than 30 calendar days prior to the beginning of each fiscal year in which it is to be effective. The CWQAP will have 15 calendar days to notify the contractor of acceptance of, or the required modifications to, the CDS. The CDS will be updated as necessary to accommodate out-of-cycle or urgent action courseware development.

1.6.5 Courseware Deliverables / Materials. The contractor shall develop and produce the courseware materials in the format prescribed and agreed to in the style guide. The courseware includes the following:

Lesson Strategy Report, Course Syllabus, Syllabus Review Report, Phase Manual, Lesson Overview, Lesson Plan, Simulator Lesson Plan, Lesson Presentation Package, Instructor Guide, Lesson Study Guide, Student Handbooks, Test Package, and Courseware Revision Summary Report.

1.6.5.1 Courseware Media. The contractor shall develop master files for courseware media IAW the formats directed in paragraph 1.7.1.1.

1.6.5.2 Courseware Development Specific Tasks. The contractor will perform the following:

1.6.5.2.1 Analyze, develop, and review all scheduled courseware and related materials.

1.6.5.2.2 Analyze test items and cumulative data to identify trends for all courseware (as defined in

AFMAN 36-2234 and AFH 36-2235, Volume 2). Maintain analysis results in corresponding lesson production folder.

57 Wing PWS Contract NO. FA4890-XX-C-XXXX

1.6.5.2.3 Pursue the use of current technology, teaching tools, and techniques that are compatible with

Government media systems.

1.6.5.3 Courseware Development Standards. Contractors shall build CW training materials IAW

Instructional Systems Development (ISD) guidance set forth in AFI 36-2201 and AFH 36-2235 Vols. 1-11.

Contractor shall use DoDI 1322.20, Development and Management of Interactive Courseware (ICW) for

Military Training. The contractor shall use the following standards and objectives to develop courseware:

1.6.5.3.1 Advanced Distributed Learning (ADL) Network, Sharable Courseware Object Reference Model

(SCORM) 2004 (4

th

Edition). Courseware interchange and run time requirements (such as SCORM) shall allow flexibility of content use and deployment of the courseware.

1.6.5.3.1.1 Employ metadata characteristics including a listing of commonly defined fields for each learning object. These fields shall adhere to an accepted set of rules. Creating, handling, and storing the data and electronically transferring the information shall use common standards of operability.

1.6.5.4 All training material must be developed to run on the current Air Force Network Integration Center

(AFNIC) Approved Products List (APL) and Standard Desktop Configuration (SDC)-compliant computer hardware and software configurations.

1.6.5.4.1 Contractor-developed Computer Based Training (CBT) will be a minimum of level-2 interactivity as defined in ACCI 36-2250.

1.6.5.5 Defense Instructional Technology Information System (DITIS). The contractor shall report all

Interactive Courseware (ICW) produced thru HQ TRSS to the DITIS for inclusion, or waiver of inclusion, into the DoD ICW inventory in accordance with DoDI 1322.20. The contractor shall provide a copy

(electronic) of any DITIS report to the CWQAP when a CBT lesson is developed and/ or revised IAW the

DITIS reporting requirements.

1.6.5.6 Courseware Deliverable Turn-In Schedule. Contractor courseware deliveries are scheduled by quarter. The Government will have a set period of time in the Style Guide to either accept or return a deliverable. The acceptance period provided to the Government is based upon a relatively steady flow of deliverables from the contractor. The contractor shall turn in as a minimum, 50% of the quarterly deliverables by the end of the second month. Waiver of the turn in schedule timeline shall be at the discretion of the CWQAPs.

1.6.5.7 Courseware Review and/or Revision. Courseware materials are reviewed and/or revised on scheduled, out-of-cycle, and urgent requirements. The contractor will review and/or revise courseware materials as stated in Appendix 1.

1.6.5.7.1 Scheduled review and/or revision occurs during the normal revision cycle which is approximately once per year changes. Review during the normal cycle is assigned a revision rate of 0.10 and is intended to evaluate the courseware for further revision and to incorporate minor courseware changes. Revision during the normal cycle involves a more substantial work effort and is assigned a higher revision rate, for example, 0.35. As a minimum, all courseware materials and lessons will go through the review/revision process once every other year.

1.6.5.7.2 Out-of-Cycle Changes. These revisions occur outside the normal review and/or revision cycle.

The contractor will update existing academic and training device courseware in response to formal syllabus, T.O., equipment modification, or AFI changes which affect the content of the lesson. The TQAE will notify the contractor of the requirement for the change and will furnish all required event details. The revised courseware will be completed by the contractor within 14 calendar days of notification, or completed and approved by the TQAE prior to instruction (whichever is later).

57 Wing PWS Contract NO. FA4890-XX-C-XXXX

1.6.5.7.3 Urgent Action Directive (UAD). The contractor will develop new courseware or revise existing courseware in response to each UAD issued by HQ ACC on an as-required basis. The TQAE will furnish all required event details. New or revised courseware will be completed within 48 hours after notification by the TQAE or completed and approved by the TQAE prior to instruction (whichever is later).

1.6.6 USAF Weapons Review (WR) Magazine (optional CLIN). When directed, the contractor will be required to receive articles from various Government sources and professionally edit, format, publish, and distribute quarterly the USAF Weapons Review (WR). The contractor will publish and distribute two (2) classified and two (2) unclassified editions per year to present these articles efficiently, aesthetically, and expeditiously to authorized members of the Department of Defense (DoD). Coordination with Government from individual USAFWS squadrons to 57 th

Wing level will be required. Work shall be performed at Nellis

AFB, NV. The contractor will furnish all personnel, equipment, tools, materials, supervision, and all other items and services required to produce, publish, and distribute approximately 8,800 copies of the WR, which will be published four (4) times per year. Contractor interface for publication of the WR will be

Nellis Air Force Base, Nevada, and other places as required. The contract may be modified in the future to include increased page length based on USAFWS growth or classification level change requirements. The contractor will perform to the standards specified in this contract.

1.6.6.1 The contractor will make available personnel who are fully trained and competent in editorial and journal design assistance. They will provide advance design and planning expertise to include assistance with editorial content assembly, layout sheets, artwork, and graphic design for publication and distribution of the WR. The contractor shall identify which employee shall serve as a WR Manager, who is the single point of contact for the Government and shall be responsible for the performance of the work, overseeing all phases of designing, printing, and distributing of the WR. It is extremely desirable and of significant benefit to the Government for the WR Manager to be a USAFWS graduate.

1.6.6.2 The Government will provide a Style Guide. The Style Guide will be used to coordinate desired editing and format for WR. The contractor must coordinate with the Government to ensure all applicable areas are included and the style is acceptable. The Government will use the Style Guide as the baseline to provide the contractor with a known acceptable format and to provide continuity between personnel. The contractor will proofread and ensure all editorial content complies with WS approved style guides. Any changes must be precoordinated and approved by Government. The contractor shall be responsible for maintaining a revision log to include requesting official, date, and summary of changes to the Style Guide.

1.6.6.3 The contractor shall file U.S. Postal Service (USPS) Form 3526, Statement of Ownership, Management, and Circulation with USPS in September of each year.

1.6.6.4 The contractor shall maintain the WR webpage for posting of partial or complete WR editions on unclassified Local Area Network (LAN) or Secure Protocol Routing Network (SIPRNET).

1.7 GENERAL TASKS

1.7.1 Government Right to Deliverables. The Government shall have unlimited rights to any and all items delivered under this contract. These rights apply as soon as the Government explicitly or constructively accepts the delivered item.

1.7.1.1 Master Files. All master files and databases are the property of the Government. At the completion of this contract, the contractor shall provide the Government with the master files, databases, data and any source code for all products developed under this contract. The Government may request access to completed and accepted Master File materials at any time. All classified courseware shall be maintained in the appropriate storage facility. The following table reflects the required working documents and related

Master Files for the products of the ISD process.

1.7.1.2 Training System Media Chart

WORKING DOCUMENT MASTER FILES

57 Wing PWS Contract NO. FA4890-XX-C-XXXX

Lectures: Instructor-Led Lesson Package

Lesson Strategy Report Lesson Strategy Report

Lesson Overview Lesson Overview

Lesson Study Guides Lesson Study Guides

Lesson Plan Lesson Plan

Lesson Presentation Lesson Presentation

Test Question Bank Test Question Bank

Digitized Text, Photos, Graphics Art Boards

Lesson Disks

Graphics Disks

Computer Aided Instruction (CAI): ICW/CBT Instructional Media Package

Program Disks Program Disks

Study Guides Study Guides

Test Question Bank Test Question Bank

Lesson Disks

Graphics Disks

Lesson Hard Copies

Master Video Tape

Tests (Paper and Current CBT Version):

Test - Current Version Question Bank and answer key

Answer Key Graphics

Test Item Analysis Test Item Analysis

Test Trend Analysis Test Trend Analysis

Videotape:

Videocassette None

Training Devices:

Briefing Guides Briefing Guides

Instructor Guides Instructor Guides

Grade Sheets Grade Sheets

Instructional Handbook:

Handbooks Handbooks

Graphics files and text files

Syllabi:

Syllabus Review Report Syllabus Review Report

Syllabi Syllabi Disks

57 Wing PWS Contract NO. FA4890-XX-C-XXXX

Phase Manuals Phase Manuals

BRI materials (if required) BRI materials (if required)

Courseware data base Courseware data base

Local Training Programs Local Training Programs Disks

1.7.2 Conferences and Meetings

1.7.2.1 Curriculum Reviews. As required, curriculum review meetings will be conducted on dates recommended by the contractor and approved by the Government. These meetings will be held at the place of performance in a facility designated by the Government. The purpose of these meetings is to develop class schedules and to review course updates and the impact of hardware and software problems. Training problem areas, scheduling, and open training issues will be discussed and resolved. If resolution of problem areas or training issues requires action outside the scope of this contract then required actions must be approved by the Contracting Officer.

1.7.2.2 Courseware Review Meetings. As required, courseware review meetings will be conducted on dates recommended by the contractor and approved by the CWQAP. These meetings will be held at the place of performance in a facility designated by the CWQAP. The purpose of these meetings is to discuss revisions to the current training systems and CWD progress. Courseware problem areas and open courseware issues will be discussed and resolved. If resolution of problem areas or training issues requires action outside the scope of this contract then required actions must be approved by the Contracting Officer.

1.7.2.3 Conference/Meeting Minutes/Agendas. The Contractor shall deliver conference/meeting agendas to the Government no later than 48 hours prior to the scheduled conference/meeting. The contractor shall prepare and submit the minutes from the all conferences/meetings required by the terms of this contract.

The meeting minute’s format shall be IAW the agreed standards in the Style Guide. The contractor shall publish and distribute the minutes to each attendee and the Chief QAP NLT 5 business days of the conference/meeting. For Performance Evaluation Meetings, the contracting office will prepare the minutes and submit them to the contractor and appropriate Government personnel.

1.7.2.4 Initial Planning Conferences (IPC). The contractor shall conduct an IPC within two weeks of contract award to present calendars, and their approach to tasks, and receive Government inputs. One week after the IPC, the contractor shall deliver all final versions of the project’s approved timelines.

1.7.2.5 Contractor personnel shall attend scheduled phase briefings, flight safety meetings, commander calls, crewmember meetings, and intelligence briefings as required. Attendance will not be required if it precludes performance during academic events.

1.7.3 Academic Scheduling. The contractor will develop, produce, and provide a definitive academic training schedule for contractor taught academic sessions. The training schedule will be delivered to the

TQAP IAW LOP. The contractor shall develop the academic training schedule to closely integrate academic requirements with flying training requirements to ensure maximum training efficiency.

1.7.4 Contract Transition. Phase-In and Phase-Out Plan: The contractor will provide the initial cadre of instructors to be trained during the defined phase-in period. The contractor will provide training to qualify replacement, or additional contract instructors (other than the initial cadre). The initial cadre of instructors will be certified IAW the contractor's approved training and certification plan, prior to the beginning of their training responsibilities. The contractor will interface with Government personnel in a manner that minimizes disruption of training activities during the phase-in period.

1.7.4.1 The contractor will develop a Phase-In Plan which details how it will meet these requirements, including discussions of workload estimates, priority allocations of personnel and resources, scheduled

57 Wing PWS Contract NO. FA4890-XX-C-XXXX completion dates of key events and plans for mitigating risk factors. This plan will be submitted concurrent with the offeror's proposal.

1.7.4.2 Phase-Out Plan. The Phase-Out portion of this plan shall address how the contractor will ensure continuity of services in the event the incumbent contractor does not receive the follow-on award. The contractor will train the initial instructor cadre of the follow-on contractor when the contract is re-competed. The contractor will also provide all continuity books and software user guides. All Continuity

Books and User Guides will be made available to the Government upon request. The contractor will coordinate with appropriate agencies IAW LOP to establish transfer of site licenses for contractor provided software that will be retained by the Government.

1.7.5 Required Reports. The contractor will prepare and submit reports as required by this contract. For a list of required reports, refer to Appendix 4 and the Style Guide.

1.7.6 USAFWS Academic/Training Database. The contractor shall be responsible for the USAFWS academic/training database. The database shall provide an internet based Courseware Management System and electronic grade book that identifies and tracks student deficiencies, tracks sortie/mission effectiveness, provides graduate evaluations (IAW ACCI36-2250) , and serves as the primary source for all instructor/staff academic and courseware needs.

1.7.6.1 All approved unclassified USAFWS courseware material shall be accessible from the USAFWS unclassified LAN, while all classified and unclassified material shall be located on a classified server that can be accessed via a SIPRNET and/or JWICS web pages as applicable, with password controls.

Individual passwords will be provided to all USAFWS instructors, students and staff. LAN access shall be approved IAW Local Operating Procedures (LOP).

1.7.6.2 The contractor shall provide academic/training database access to all approved (classified and unclassified) lessons to USAFWS graduates AF-wide with password controlled access.

1.7.6.3 This capability shall be provided with no additional workload on the USAFWS LAN and information management staff. The contractor will possess network operating and maintenance capability sufficient to support this database and to meet the computer/network needs of all contractor personnel. The contractor will provide the expertise to program and manipulate the academic database at the root level allowing maximum flexibility and responsiveness to emerging USAFWS database requirements.

1.7.6.4 All systems must be compatible with and approved by the USAFWS LAN manager. Additionally, all systems and their operation must be in compliance with all Government security regulations.

1.7.7 Employee Training

1.7.7.1 Continuation Training for Contractor Personnel. As agreed by both the contractor and the ACC

TRSS Chief QAP, contract personnel shall attend Air Force special schools to enhance the instructors’ expertise (e.g., USAF Weapons Center academics, Electronic Warfare School, etc.) and any other appropriate meeting or conferences as requested by the TQAP. Travel will be IAW the JTR and reimbursed under the Travel CLIN. All travel requests will be coordinated with the TQAP and sent to the

Chief QAP for processing/approval at least two weeks prior to travel.

1.7.7.2 Instructor Training, Certification, Qualification, De-Certification, Retraining and Re-Certification.

Grand-fathering certification/qualification for previously certified/qualified employees shall be at the discretion of the TQAP’s.

1.7.7.2.1 Instructor Training and Certification Plan (ITCP). The contractor will develop, deliver, and implement an Instructor Training and Certification Plan that will ensure contractor instructors meet the standards outlined in this PWS. This plan shall be submitted concurrent with the offeror's proposal. After contract award, the plan will be reviewed by the TQAP. The CO will notify the contractor of acceptance or required modifications to the plan not less than 15 calendar days after contract award. As required, the contractor will make appropriate modifications and obtain acceptance of the revised plan from the CO

57 Wing PWS Contract NO. FA4890-XX-C-XXXX within 15 calendar days of receipt. Upon acceptance of the plan, the contractor will deliver a copy of the plan to each TQAP under this contract within 5 calendar days. The plan will include as a minimum, the instructor qualification requirements for each USAFWS squadron supported, major block of lessons.

1.7.7.2.2 Instructor Qualification. The outgoing contractor will provide qualification training for the initial cadre of contractor instructors. Qualified contractor instructors will accomplish all subsequent instructor qualification training. Instructors will qualify in each lesson that they instruct. Instructor qualification consists of satisfactorily demonstrating instruction of students under the observation of a qualified instructor. The contractor will provide the TQAP written notification that an individual is qualified to instruct prior to actual unsupervised instruction by that instructor in that major block of lessons or training device event. Written notification will be IAW LOP.

1.7.7.2.3 Instructor Certification. The Government (TQAP) will certify all new contract instructors. This certification may be accomplished at any time after the qualification training is complete. The contractor will ensure that each new instructor who will perform instructor duties is certified by the TQAP within six months of initial instructor qualification.

1.7.7.2.4 Instructor De-certification and/or Removal of Substandard Personnel. As a result of observation by a TQAP, valid customer complaint, or student critique, the Chief QAP in close coordination with the

Det/CC and the Contracting Officer, may direct the contractor to de-certify or remove any contract employee under this contract. Reasons for de-certification and/or removal will include, but are not limited to: 1) Substandard performance during academic instruction; 2) Failure to protect or properly care for

Government property or equipment; 3) Acts that endanger the health or safety of Government or contractor personnel.

1.7.7.2.5 Instructor Re-training and Re-certification. Re-training and re-certification of contractor employees de-certified will be done at no expense to the Government. The TQAP and the Chief QAP will review the instructor re-certification plan and approve the re-certification of an individual prior to that individual resuming instructor duty.

1.7.8 Quality Control. In compliance with the contract clause entitled Inspection of Services (Federal

Acquisition Regulation, FAR 52.246-4) part I, Section E of this contract, the contractor shall provide a

Quality Program Plan (QPP) that shall be integral with the Instructional Systems Development (ISD)

Management Plan (refer to Para 1.6.2). This plan shall be submitted concurrent with the offeror's proposal.

All records of inspections shall be kept and made available to the Government throughout the contract performance period and for the period after contract completion until final settlement of any claims that may arise under this contract. Quality control aspects of the ISD Management Plan shall be subject to the terms and conditions of this contract.

1.7.9 Quality Assurance. According to the contract clause entitled Inspection of Services, the

Government will evaluate the contractor’s performance under this contract using the approved Quality

Assurance Surveillance Plan (QASP). For those tasks listed on the Service Delivery Summary (SDS) Chart

(refer to Section 2), the QAP will follow the methods of surveillance specified in this contract and the

QASP. Government personnel will record all surveillance observations. When an observation indicates defective performance, the QAP will require the Site Manager or representative to initial the observation on the Contract Discrepancy Report. The initialing of the observation does not necessarily constitute concurrence with the observation, only acknowledgment that the Site Manager or representative has been made aware of the unsatisfactory or defective performance. Government surveillance of tasks not listed in the SDS, or by methods other than those listed in the SDS (i.e., those provided for in the Inspection of

Services contract clause) may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures or other contract provisions. Any action taken by the

Contracting Officer as a result of surveillance will be according to the terms of this contract and the approved QASP.

1.7.10 Performance Evaluation Meetings. Performance evaluation meetings shall be conducted not less than on an annual cycle. Meetings will be conducted at the place of performance with the CO, Contract

Manager, TRSS PM, contractor and other Government personnel such as Det Commanders, TQAPs, 57 Wing PWS Contract NO. FA4890-XX-C-XXXX

CWQAPs. The CO may require the site manager to meet with the Contract Manager, Chief QAP, and other Government personnel more than annually if deemed necessary. Likewise, the contractor may request a meeting with the Contracting Officer when he or she believes such a meeting is necessary.

Written minutes of any such meetings shall be recorded and maintained in the contract file and signed by the site manager and the Contracting Officer or Contract Manager. If the contractor does not concur with any portion of the minutes, such non-concurrence shall be provided in writing to the Contracting Officer within ten (10) calendar days following receipt of the minutes.

1.7.11 Physical Security. The contractor will be responsible for safeguarding all Government property provided for contractor use. At the end of each work period all Government facilities, equipment, and materials will be secured.

1.7.11.1 Controlled/Restricted Areas. The contractor shall implement local base procedures for entry to Air

Force controlled/restricted areas where contractor personnel will work. An AF Form 2586, Unescorted

Entry Authorization Certificate, must be completed and signed by the sponsoring agencies Security

Manager before a Restricted Area Badge will be issued. Contractor employees must have a favorably completed National Agency Check (NAC) investigation before receiving a Restricted Area Badge. Interim access can be granted IAW AFI 31-501, Personnel Security Program Management.

1.7.11.2 Cipher Control. The contractor will establish and implement cipher issue and changing procedures to ensure that all Government facilities are safeguarded. The contractor will prohibit the use of cipher combination by any person other than the contractor’s employees and appropriate Government personnel.

These procedures will be included in the contractor’s ISD Management Plan as opening and closing procedures. It is also the responsibility of the contractor to prohibit the opening of locked areas by the contractor’s employees to permit entrance of persons other than the contractor’s employees who are engaged in the performance of assigned work in those areas.

1.7.11.3 Key Control. The contractor will establish and implement methods of making sure that all

Government keys issued to the contractor are not lost or misplaced and are not used by unauthorized persons. Government-issued keys shall not be duplicated.

1.7.11.3.1 The contractor will immediately report to the QAP or the Contracting Officer any occurrences of lost or duplicated keys.

1.7.11.3.2 The contractor will prohibit the use of Government-issued keys by any persons other than the contractor’s employees and prohibit the opening of locked areas by contractor employees to permit entrance of persons other than those contractor employees who are engaged in performance of contract work requirements in those areas.

1.7.11.4 Lock Combinations. The contractor will be responsible to establish and implement methods to restrict access to all Government-provided lock combinations to preclude unauthorized entry. These procedures will be included in the contractor’s ISD Management as opening and closing procedures.

1.7.11.5 Safe Combinations. The contractor will establish and implement methods of ensuring that all safe combinations are not revealed to unauthorized persons. These procedures will be included in the contractor’s ISD Management Plan as opening and closing procedures.

1.7.11.6 Computer Security. The contractor will establish and implement methods of restricting access to appropriate personnel on both unclassified and classified computer systems. Practices will be implemented to ensure that classified information is not transmitted over the unclassified server. As a minimum all 99

CS password and security procedures will be followed.

1.7.11.7 Traffic Laws. The contractor and its employees shall comply with base traffic regulations.

1.7.11.8 Weapons, Firearms, and Ammunition. There is no requirement for contractor employees to possess weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle (COV)

57 Wing PWS Contract NO. FA4890-XX-C-XXXX or privately-owned vehicle (POV) while performing official duties. Eligible contractor personnel may possess firearms and/or ammunition for use while off duty IAW applicable Nellis AFB instructions.

1.7.11.9 For Official Use Only (FOUO). The contractor shall comply with DoD 5400.7-R, Chapter 4, DoD

Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.

1.7.11.10 Reporting Requirements. Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware that may pose a threat to the security of DOD personnel, contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.

1.7.12 Government Directed Travel. The contractor shall be required to travel in support of this effort.

All Government directed travel must be approved prior to any expenditure of funds. All travel costs will be reimbursed IAW JTR. The Contract Program Manager/Chief QAP shall coordinate approval for all contractor travel with the Site Manager prior to departure. See Appendix 1 for travel requirement.

1.7.13 Style Guide

1.7.13.1 The Government will provide a Style Guide. The Style Guide is used to coordinate the format for all final deliverables. The contractor must coordinate their proposed style with the site QAP’s to ensure all applicable areas are included, and the style is acceptable. The QAP’s will use the Style Guide to ensure all deliverables are in the correct format and to provide continuity between personnel. The Style Guide shall provide the contractor with a known acceptable standard. Any changes in style must be pre-coordinated and approved with the QAP’s. The contractor shall be responsible for maintaining a revision log to include requesting official, date, and summary of changes in the Style Guide.

1.7.13.2 Content. The Style Guide shall consist of the following:

1.7.13.2.1 Government Requirements. The Government Training and Courseware QAPs will provide all specific requirements for each deliverable. Each deliverable shall have the Government’s expectations and constraints listed.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .