Performance Work Statement Range Residue Removal 16 Nov 10
| 1.0 | DESCRIPTION OF SERVICES | 3 |
| 1.1. | Performance Objectives | 5 |
| 1.2. | Work Scheduling and Management: | 6 |
| 1.3. | Regulatory Guidance. | 8 |
| 2.0 | SERVICE DELIVERY SUMMARY/DELIVERABLES | 9 |
| 2.1. | Service Deliver Summary. | 9 |
| 3.0 | GOVERNMENT FURNISHED PROPERTY AND SERVICES | 10 |
| 3.1. | The Government will provide the following services: | 10 |
| 3.2. | The Government will provide the following equipment as needed: | 10 |
| 4.0 | GENERAL INFORMATION: | 10 |
| 4.1. | Government Personnel: | 10 |
| 4.2. | Contractor Personnel: | 10 |
| 4.3. | Coordination with Host EOD unit: | 11 |
| 5.0 | REPORTING REQUIREMENTS | 11 |
| 5.1. | Invoicing Report | 11 |
| 5.2. | Monthly Report | 11 |
| 5.3. | Close-out Report | 12 |
| 6.0 | RANGE RESIDUE REMOVAL ACTIVITIES | 12 |
| 6.1. | Site Management: | 12 |
| 6.2. | Radiological and Hazardous Waste Management: | 13 |
| 6.3. | Processing: | 13 |
| 6.4. | Third Party UXO QA: | 15 |
| 6.5. | Certification: | 15 |
| 6.6. | Range Clearance | 15 |
| 6.7. | Work Menu – Descriptions and Work Measures | 16 |
| 7.0 | DISPOSITION | 18 |
| 7.1. | Recycling: | 18 |
| 7.2. | Trash: | 18 |
| 7.3. | Shipment Weights: | 18 |
| 7.4. | RCRA-Regulated Materials: | 19 |
| 7.5. | Low Level Radioactive Wastes (LLRW): | 19 |
| 8.0 | APPLICABLE DOCUMENTS | 19 |
| 8.1. | Federal, State and Local Regulations | 19 |
| 8.2. | DoD Regulations | 19 |
| 8.3. | Acronyms | 20 |
| 9.0 | ESTIMATED QUANTITIES | 21 |
| 9.1. | ACC Ranges | 21 |
| 9.2. | Other Ranges | 22 |
| 10.0 | REPORTS AND DOCUMENTATION | 23 |
| 10.1. | An example Invoicing Detail Report. | 23 |
| 10.2. | An example Monthly Report. | 24 |
| 10.3. | An example Shipping Summary. | 25 |
| 10.4. | An example DD Form 1348-1A. | 26 |
DESCRIPTION OF SERVICES
The purpose of the Range Residue Removal (R3) contract is to perform the inspection, demilitarization (demil) and disposal of all range and munitions debris at US Air Force training ranges throughout the continental US and Alaska. The program supports R3 services at Air Combat Command (ACC) ranges and has the potential to include 14 Air National Guard (ANG) ranges and the other Air Force MAJCOM ranges at AFSOC and PACAF as needed. The contractor shall provide all labor, material, and equipment to perform the work specified in each Task order, which may include range clearance, residue inspection and demil (including documentation), proper handling of materials regulated under the Resource Conservation and Recovery Act (RCRA) or considered to be low level radioactive waste (LLRW), transfer of LLRW or RCRA-regulated materials to the appropriate installation program for Government disposition, and transfer of processed range residue to either recycling centers or landfills. The contractor shall also provide a third party quality assurance expert (3rd party QA) to provide final certification of all materials prior to release from DoD control.
ACC ranges are used for various types of training to include: air-to-surface weapons delivery training, air-to-air combat, close air support, combat search and rescue, Special Forces ground exercises, and electronic combat training. Aircrews strike targets with bombs, rockets, precision guided missiles, aircraft cannon and illumination flares. Munitions may be high explosive-filled (HE), full-scale or sub-scale practice munitions (Bomb Dummy Unit or BDU) with or without spotting charges, or inert practice ammunition. Only a few ranges are authorized for HE munitions, but the possibility always exists for HE ordnance or explosive components to be commingled with inert munitions and range debris. Full-scale inert bombs are nearly identical to HE bombs but contain concrete or other inert materials instead of HE. These bombs do not explode although some may be equipped with spotting charges and/or live fuzes.
DoD Instruction 4140.62 states, “Munitions and range-related debris are considered Material Potentially Presenting an Explosive Hazard (MPPEH) until properly inspected and documented as Material Determined As Safe (MDAS). Only MDAS will be released to the public. A chain of custody must be maintained until MDAS is released from DoD control and a legible copy of the documentation of MDAS determination will accompany the material when it is transferred.” DoD Explosive Safety Board (DDESB) Technical Paper 18 (TP 18) specifies personnel qualifications to inspect and/or certify MPPEH as safe. Munitions debris is composed of expended munitions and components or fragments. Range debris includes expended target materials such as salvaged vehicles, shipping containers, tires and other materials used to fabricate targets. Hard targets are more durable (tanks, armored personnel carriers and heavy equipment) and may have munitions embedded in them.
MPPEH removed from impact areas is placed in a residue holding area (RHA) established by the manager of each range. Munitions and munitions debris are segregated and the remaining MPPEH is typically sorted by type of material, i.e. vehicles, heavy equipment, etc., but some debris may be commingled. The debris may contain unexploded ordnance (UXO), explosives or explosive components, low-level radiological waste, or RCRA-regulated wastes such as automotive fluids. Military equipment may require demilitarization. Much of the debris has salvage value due to its content of commercially viable metals (steel, aluminum, brass) and shall be recycled whenever possible. Residue with no recycling value (tires, retarder parachutes, Smoky SAM training rockets, wood, and other debris) shall be processed for release to landfills.
Military Explosive Ordnance Disposal (EOD) personnel perform periodic range clearances to remove spent ordnance and target debris. Targets, debris and designated impact areas are inspected for UXO and other explosive hazards, and inspected munitions and debris are collected and transported to the RHA. UXO qualified personnel employed via this contract may be required to augment these range clearances or operate in lieu of government EOD personnel. UXO will only be destroyed by military EOD.
Below is a list of ACC work sites. The estimated annual amounts of residue from ACC work sites are listed in Section 9.10, ACC Ranges.
| ACC Range Name/Location | Host Base | |
| Avon Park, FL | Moody AFB, GA | |
| Dare County, NC | Seymour Johnson AFB, NC | |
| Grand Bay, GA | Moody AFB, GA | |
| Centennial, Oscura, Red Rio, NM | Holloman AFB, NM | |
| Saylor Creek, Juniper Butte, ID | Mountain Home AFB, ID | |
| Poinsett, SC | Shaw AFB, SC | |
| Utah Test and Training Range, UT | Hill AFB, UT |
Below is a list of other potential AF or DoD work sites. Other Air Force commands (AFSOC, PACAF, ANG) or other military components may require work depending on availability of funds and at the discretion of ACC. The estimated annual amounts of residue from other work sites are listed in Section 9.2, Other Ranges.
| Other Range Name/Location | Other Range Name/Location | |
| Melrose, NM (AFSOC) | Hardwood, WI (ANG) | |
| Eielson AFB, AK (PACAF) | Jefferson, IN (ANG) | |
| Adirondack, NY (ANG) | McMullen, TX (ANG) | |
| Airburst, CO (ANG) | Razorback, AR (ANG) | |
| Atterbury, IN (ANG) | Shelby, MS (ANG) | |
| Bollen, PA (ANG) | Smokey Hill, KS (ANG) | |
| Cannon, MO (ANG) | Townsend, GA (ANG) | |
| Grayling, MI (ANG) | Warren Grove, NJ (ANG) |
Performance Objectives Advanced Logistics Team: Perform a site visit at each range to develop work quantity estimates, identify and coordinate local resource requirements (equipment, fuel, recycling centers, sanitary facilities, lodging, etc.), environmental and transportation permits, and other information required to implement the Site Work Plan to include the Health and Safety Plan. Government will provide a range escort for up to 2 days, as needed. Coordinate visits with R3 program manager and range manager. Contractor will submit quantity estimates to R3 program manager with a copy to ACC AMIC/PKC within 2 business days of completion of visit.
Site Work Plan: Develop a plan for each work site to describe site-specific health and safety information, spill prevention control procedures, work procedures, UXO technician qualifications, task order milestones and address potential conflicts with the task order. The plan must describe the MPPEH post-processing Quality Control (QC) sampling method if used with a DDESB-approved MPPEH processing technique. Plan development requires coordination with range manager and range O&M contractor, work site orientation and local procedures.
Mobilization: Mobilize personnel and equipment necessary to execute the work specified in the task order. Travel costs will be IAW FAR 31.205-46. All travel and associated estimated costs shall be coordinated and pre-approved in writing by R3 Program Manager and range manager prior to travel.
Residue Processing: Must perform on-site inspection, processing and certification of all residue as MDAS. Certification shall be documented by qualified personnel. Tasks include radiological sweep and explosive safety inspection, demil of military equipment and all associated documentation/certification of these actions; UXO reporting; shearing or crushing; site safety; chain-of-custody control and documentation; handling of LLRW; handling and characterization of RCRA-regulated material; and work site collection of fragments/residue resulting from processing activities.
Disposition: Dispose of MDAS as soon as practical following the processing phase. Contractor must maintain the chain-of-custody and MDAS integrity until final disposition. Recycle MDAS with commercial value to the maximum extent possible with preference given to vendors/recyclers that consume the material immediately. Dispose of MDAS with no value IAW local laws and procedures. LLRW and/or RCRA-regulated materials will be handled IAW federal and installation program requirements to include characterization (as needed), documentation, packaging, notification and turn-in to appropriate government personnel.
Work Documentation: Prepare and submit to both ACC A3AR and ACC AMIC documentation related to work performance for individual task orders to include invoicing, monthly reports and a close-out report when all activities identified on the task order are completed. Documentation shall include completed chain-of-custody records for all MDAS terminating in receipt by a recycler or landfill; weight tickets for shipments of all material transported from the site; receipts for sale of recyclable materials; photographs or videos of work activities; and summaries of quantities processed, i.e. documentation of the quantity of each menu pricing item managed on-site. Submit invoicing reports with each invoice. Submit a close-out report with the final invoice. Submit a copy of all chain-of-custody records to the Range Manager where work was performed.
Range Clearance: Provide UXO-qualified personnel to survey range areas or targets for UXO, munitions or explosive components and inspect, remove, and transport MPPEH to RHA. AFI 13-212 describes range clearance as “the removal and disposal of all ordnance, inert ordnance debris, Training Projectile (TP) ammunition, and other range debris reasonably possible to detect (normally down to four inches in size).” Clearance distance criteria will vary from 50 to 1000 feet from the target center and are dependent on the area being cleared (road, impact area or surrounding range land), the type of use (HE vs. practice munitions), the type of clearance interval (semiannual, biennial, decennial), and/or debris density per acre. UXO shall be flagged for detonation by military EOD personnel.
Third Party Quality Assurance: Provide 3rd party UXO QA to perform final review, certification and documentation of all MDAS prior to transport off-range for recycling or disposal unless qualified government personnel are available.
Work Scheduling and Management:
Work will be assigned to the contractor as specified in individual task orders. Each task order will include a spreadsheet with estimated quantities of residue requiring MDAS certification and disposal. When task orders specify work at multiple locations, the Contractor shall structure costs, schedules, and invoices for each location.
The primary goal of this contract is to ensure that all processed range debris released to the public is demilitarized according to DoD standards, free of hazards to human health and safety, and that all wastes are managed as required by applicable Federal, State and local laws as well as DoD and Air Force directives. Since range debris and trash may contain explosives, ignitable residue, LLRW and RCRA-regulated materials, the contractor will:
Separate materials by categories;
Demilitarize military equipment and munitions IAW DoD 4160.21-M-1;
Certify that MDAS is free of energetic material according to DoDI 4140.62;
Notify on-site Quality Assurance Evaluator (QAE) if LLRW or RCRA-regulated material is encountered; notify the on-site QAE and ACC R3 Program Manager if these materials are widespread, e.g. not individual components;
Remove LLRW and prepare it for transportation using host installation procedures. Notify the host base Installation Radiation Safety Officer (IRSO) when LLRW is ready for shipping;
Remove RCRA-regulated material, characterize the material as needed, prepare it for transportation, notify the host base environmental officer and transport the material to the host range’s Initial Accumulation Point (IAP);
Temporarily halt processing activities and notify the 3rd Party QAE and military EOD personnel if any UXO or suspected UXO is identified;
Optimize the value of recyclable materials when economically feasible;
Give preference to scrap metal vendors that can immediately process MDAS;
Dispose of all other waste material in accordance with applicable regulations and requirements;
Document RHA clean up data using the units specified in the task order;
Use chain-of-custody procedures to track all MDAS leaving the range;
Obtain all required Federal, State, and Local permits.
The secondary goal is to provide sound stewardship of natural and man-made resources. This goal encompasses achieving a safe recycling strategy and obtaining “best value” for the recyclables on the market. Additionally, this goal ensures that all trash and hazardous waste is properly disposed of according to applicable environmental statutes. Best value will be accomplished by optimizing scrap handling at the work sites using procedures common to the scrap recycling industry. This may require the contractor to motivate recycling vendors with the high value material to ensure the low value material is removed as well.
The third goal is to improve scrap metal processing techniques to meet the special demands of handling and demilitarizing munitions residue. This goal seeks to capitalize on commercially available scrap metal industry handling and processing equipment to process munitions residue. A conscious effort will be made to improve the scrap handling process and lessons learned will be provided in the site closeout report at the completion of each task.
Regulatory Guidance.
The following laws and regulations, at a minimum, apply to R3 activities on Air Combat Command ranges:
Clean Air Act: Each individual range may require a permit for dust control or air emissions for certain processes. Contractor shall evaluate the local situation, determine the need for and obtain permits, as necessary.
Clean Water Act: Spill prevention and control is required for fuel storage, runoff, and spill control of automotive fluids during processing of expended target vehicles.
Endangered Species Act: The contractor shall abide by any requirements specified by the range’s natural resources manager to ensure that listed species are not adversely affected by range residue operations. Specific restrictions on operations may be imposed on vehicle and equipment operations or work hours to protect endangered species that may exist on each range. The contractor shall coordinate these requirements with supported range’s host environmental management function.
National Historic Preservation Act: The contractor shall abide by any requirements specified by the range’s cultural resources manager to ensure that historic resources are not adversely affected by range residue operations.
Resource Conservation and Recovery Act (RCRA): Solid and hazardous waste management is required for proper disposition of munitions and range debris. This includes the Military Munitions Rule of 1997 (applies to expended ammunition used for its intended purpose) or specific state regulations which are more stringent.
Standards for Protection Against Radiation, 10 CFR 20: The contractor’s Quality Control Plan must fulfill the requirements of this regulation.
Demilitarization of DoD Property: Contractor will follow DoD Manuals 4160.21-M and 4160.21-M-1 (most current as of June 10, 1999) and establish means to track the custody of demilitarized items from the site to the recycling vendor.
Occupational Safety and Health Administration (OSHA): Contractor will follow all applicable OSHA rules.
Material Potentially Presenting an Explosive Hazard (MPPEH): Contractor will follow DoD Instruction 4140.62 and AFMAN 91-201 to ensure material released from DoD control does not pose an explosive hazard to the public.
SERVICE DELIVERY SUMMARY/DELIVERABLES
Service Delivery Summary.
Table 1 lists the performance objective and performance threshold for each task in the contract. This performance threshold provides a vehicle to align performance with the government standard/business objective and provides a focus on critical success factors in meeting these objectives.
Table 1 – Service Delivery Summary
| PERFORMANCE OBJECTIVE |
| PWS REFERENCE |
| PERFORMANCE THRESHOLD |
| Identify, recover, package, turn in and/or notify the government of the presence of items or materials which present a safety (UXO) or environmental hazard (LLRW, RCRA) |
| 1.1.4, 1.1.5, 1.2.1.(h), 6.3.1 |
| 100% of all items identified, recovered, segregated, packaged, transported, appropriate personnel notified and material turned over to the government, as needed |
| Demilitarization Requirements |
| 1.1.4 |
| 100% compliance with DoD 4160.21-M and DoD 4160.21-M-1 |
| 3rd Party UXO QA |
| 1.1.8 |
| 100% presence during all R3 activities |
Final signatory of MDAS status
| Certification and validation of all residue |
| 1.1.6 |
| 100% documentation of all inspections, demilitarization actions and MDAS status accompanies the material |
| Disposition of all processed material |
| 1.1.5 |
| 100% of all material eligible for disposition to the public as MDAS is properly transferred via recycling or landfill |
| Chain of Custody |
| 1.1.6 |
| 100% chain of custody documentation for all processed material through final disposition |
| Recyclable Reimbursement |
| 1.1.6 |
| Accounting process technically accurate and delivered within 60 days of task order completion |
GOVERNMENT FURNISHED PROPERTY AND SERVICES
The Government will provide the following services:
Range safety briefing and access to the range.
Environmental and cultural resource protection training as needed.
Specialized vehicle training as needed (ATV, HMMWV, etc.).
Points of contact (range manager, supporting EOD and IRSO).
Disposal of LLRW and hazardous wastes.
The Government will provide the following equipment as needed:
Radios required for range access and movement control.
Vehicles required in support of range clearances to include specialized vehicles.
Space will be made available for a contractor-provided office trailer however utility connections will be at the contractor’s expense. Utilities may or may not be available, depending on the location. Office space for a computer and/or telephones in a government-owned building may also be provided, if available.
GENERAL INFORMATION:
Government Personnel:
Functional Area Chief (FAC) R3 Program Manager (Chief QAE) Contracting Officer On-Site Range Operations Personnel (On-Site QAE) Contractor Personnel:
The following personnel are the minimum required for this program and are accompanied by minimum qualifications. Positions may be combined when feasible as long as safety is not compromised. Key personnel are identified by a (K). Contractor will provide a list of key personnel qualifications to the R3 Program Manager within 30 days of contract award and may submit any changes within 10 days prior to the start of each task order.
(K) Program Manager. Program management experience of range residue removal, munitions response or remediation at UXO contaminated sites.
Program Safety Officer. Shall meet the requirements of DDESB TP 18.
(K) Senior UXO Supervisor (SUXOS). Shall meet the requirements of DDESB TP 18. Shall be a graduate of the U.S. Naval EOD School with at least 6 years experience on active duty in military EOD units. Shall have military experience directing range clearance operations when supporting contract range clearances.
(K) 3rd Party UXO Quality Assurance (UXO QA). Shall meet the requirements of DDESB TP 18. Shall be a graduate of the U.S. Naval EOD School with at least 6 years experience on active duty in military EOD units.
UXO Technicians. Shall meet the requirements of DDESB TP 18.
The contractor program manager will have regular contact with the Contracting Officer and R3 Program Manager to update them on site progress and any problems or concerns.
Coordination with Host EOD unit:
The Contractor shall coordinate UXO procedures with the EOD unit providing support to the range. The Site Work Plan shall include procedures for EOD notification if UXO are found, use of a UXO holding area and procedures when EOD cannot respond immediately.
REPORTING REQUIREMENTS
Invoicing Report Submit an invoicing report containing the following minimum information with each task order invoice. Invoices will be rejected without the report or any of these elements. The invoicing report may be incorporated in the monthly report. The final invoice must be accompanied by a close-out report IAW Section 5.3.
Quantity verification. Document quantities of each work menu item completed showing verification by the on-site QAE and the contractor.
Travel reimbursement. Contractor must be able to provide receipts for associated travel expenses being reimbursed by the Governement IAW FAR 31.205-46.
A spreadsheet or table summarizing work quantities completed, cumulative totals, any recycling funds received and total estimated quantities remaining on the task order. A sample Invoicing Detail Report is shown in Section 10.1.
Monthly Report Submit a monthly report with the following minimum information. A sample Monthly Report is shown in Section 10.2, but an agreed-upon format that provides this same information may be used.
Contract technical status Task order status to include funds invoiced versus task order funded amount or work completed at each site of a multi-site task order Schedule Issues/Risks Recycle funds balance (if held in escrow) Mishaps and corrective actions Miscellaneous Close-out Report Submit a close-out report with the final invoice at the completion of each task order. Include the required invoicing report information as well as a summary of all associated periodic status reports, a summary of all material shipments, discovery logs for UXO, LLRW and RCRA materials, any lessons learned and full accounting of all credits received for recyclable materials. A sample Shipping Summary is shown in Section 10.3.
RANGE RESIDUE REMOVAL ACTIVITIES
Site Management:
Advanced Logistics Team. This team shall visit each designated work site to develop estimates of the work effort, determine resource and regulatory requirements, coordinate with the Range Manager for site-specific information to support the Work Plan, and identify factors which could negatively impact the work effort.
Personnel. All work site personnel must have a current OSHA 40-hour Hazardous Waste Operations (HAZWOPER) training. The SUXOS or acting site manager must also have 8-hour HAZWOPER Supervisor training. No site activity will take place without the presence of a qualified SUXOS. UXO Technician I must not perform inspection duties designated for higher qualified personnel.
Site Work Plan. This plan shall describe the work to be performed, work procedures (to include the use of post-processing QC sampling), range schedule (for the overall project and/or for each range) and resources necessary and relevant to the accomplishment of the work effort. The plan shall include the Health and Safety plan once site-specific information is incorporated. The work plan shall include specific milestones such as submittal of each deliverable, general task scheduling, estimated completion and government furnished resources or support. The plan shall include the qualifications of all UXO technicians inspecting, processing or certifying MDAS.
Radiological and Hazardous Waste Management:
Radioactive Material.
The contractor shall perform a radiological survey of all range debris (particularly military aircraft, vehicles and hardware) prior to processing. LLRW is usually found in luminous dials on military vehicles but may be found as structural materials (Magnesium-Thorium alloy) or in electronic components. LLRW will be removed, segregated, and packaged for transfer. The contractor will notify the on-site QAE of the presence of LLRW for coordination with the IRSO. The Government will schedule pick-up and final disposal of LLRW. The contractor shall document the material, quantity, detection instrument make/model and readings obtained and will place a copy of the LLRW discovery report with the packaged material, provide a copy to the on-site QAE and include a copy in the close-out report. The contractor will notify the on-site QAE and R3 Program Manager if LLRW is widespread, e.g. not individual components and cannot be effectively recovered under the contract. Maintain a log of LLRW discovered during the work effort. Document radiological surveys IAW section 6.5.
RCRA-Regulated Material.
The contractor shall survey range debris for the presence of RCRA-regulated materials such as batteries, antifreeze, oil, asbestos, PCBs, etc. RCRA materials shall be characterized, collected and delivered to the nearest on-range hazardous waste IAP permitted to receive it for eventual disposal by the government. The contractor shall coordinate with the IAP manager to ensure proper receipt of the material. The contractor shall comply with requirements in 40 CFR and the installation hazardous waste program. The contractor will notify the on-site QAE and R3 Program Manager if RCRA-regulated materials are widespread, e.g. cannot be effectively recovered under the contract. Maintain a log of RCRA materials discovered at the work site.
Processing:
Inspection All MPPEH will undergo a 100% inspection and a second 100% re-inspection by qualified personnel to determine the presence of UXO, explosives or explosive components. Interior cavities require particular attention to ensure explosives or explosive components are identified. Remove UXO and explosive components from the immediate work area if possible, or stop work and notify EOD. Use of a DDESB-approved processing method (crushing, flashing, etc.) may take the place of the first inspection, but will be followed by the required second 100% inspection or a post-processing QC inspection using an approved sampling method described in the work plan. Maintain a log of UXO or explosive components discovered during the work effort. Document explosive safety inspections IAW section 6.5.
Demilitarization Military aircraft, vehicles, equipment and munitions shall be demilitarized by qualified personnel IAW DoD manuals 4160.21-M and 4160.21-M-1. Munitions shall be processed to the extent that they shall not be recognizable as munitions and interior cavities shall be exposed. Sub-scale practice munitions (e.g. BDU-33), expended rockets and warheads, inert projectiles, guided missile and guided bomb components will be run through a process that reduces these items into 4-inch pieces or smaller. Full-scale inert bombs will be cut into at least four pieces. The inert filler (normally vermiculite and concrete) will be removed and left on site. Contractor will describe in detail every process envisioned for each category of range residue listed in the menu table. Document demil IAW section 6.5.
Crushing:
A crusher may be used to process sub-scale munitions to meet inspection, demil or recycling requirements. Items subjected to crushing will be broken down such that 85% of the end product is not more than 4 inches in the shortest dimension and interior cavities are exposed. Contractor will describe the post-processing QC sampling method to be used to determine the effectiveness.
Shearing:
An industrial shear may be used to cut or disassemble bombs, aircraft, light vehicles, CONEX containers or other miscellaneous metals to meet inspection, demil or recycling requirements.
Range Residue (MPPEH and Miscellaneous Debris) UXO technicians will inspect all range residue before and post-processing. The contractor must ensure MDAS is secured where it cannot be contaminated with MPPEH. The UXO technicians shall assess any suspect UXO. Known or suspected UXO will be assessed for movement to a secure, approved UXO holding area on the range to await destruction by government EOD personnel. If the UXO is deemed unsafe for movement the contactor shall stop work, cordon off the area, and notify government EOD and the range manager. All UXO must be destroyed by government EOD and will not be processed by the contractor until this action is complete.
Target Vehicles:
All expended target vehicles (including heavy equipment and armored vehicles) will be inspected for embedded munitions. Large driveline components with visual evidence of munitions impact will be drained, cut open, and visually inspected. Vehicle fluids will be collected and taken to the government waste IAP that services the range.
Third Party UXO QA:
No site activity will take place without Third Party UXO QA personnel on-site. The UXO QA will have “stop work” authority and will monitor the R3 activity to ensure explosive safety and project compliance. The contractor shall provide the UXO QA unless otherwise specified in the delivery order. The UXO QA shall not be an employee of the contractor. At some sites the government may provide the UXO QA. The UXO QA shall be the second signatory to certify MDAS, weight, and contents of each shipment prior to leaving the work site.
Certification:
Munitions and range debris require the following certifications. The SUXOS maintains overall responsibility for all on-site range residue certifications. All processed material shall be accompanied by full documentation/certification on a DD Form 1348-1A, Issue/Release and Receipt Document and chain-of-custody documentation (contractor produced) terminating with receipt by a recycler or landfill. An example DD Form 1348-1A is shown in Section 10.4.
MPPEH will be documented as MDAS. Only UXO Technician III or higher will certify MDAS. The SUXOS is responsible for all on-site MPPEH inspection activities. This individual shall have documented experience with and/or specialized training in the type of MPPEH expected at each site. The 3rd Party UXO QA will provide final certification of MDAS prior to transport off the range.
Document the demilitarization of military aircraft, equipment and munitions signed by two qualified personnel.
Document a radiological survey of all residues signed by a qualified person.
Range Clearance The contractor shall provide an appropriately sized team of UXO-qualified personnel (typically up to 8 people) to conduct range clearance operations as described in Section 1.1.7. Range clearances may be confined to specific targets or may consist of larger areas defined as acres or sections of the range and may include HE munitions impact areas. The range clearance team leader shall be a minimum UXO Tech III. Teams operating in areas known or suspected to contain HE munitions shall be under the direction of a SUXOS with a minimum of one UXO Tech III assistant. The use of UXO Tech I personnel in HE areas must be approved by the R3 Program Manager prior to mobilizing the team. Contractor will not perform range clearance in Extremely Hazardous Contaminated Hazard Areas, i.e. areas containing munitions with influence, random-delay or other hazardous fusing. The team may work independent of range personnel when the work effort is limited to specific targets designated for practice/inert munitions. Large area clearances which require significant off-road travel or encompass HE impact areas will include military EOD to act as escort and QAE. The Air Force may elect to conduct range clearance in conjunction with other R3 activities or as a separate work effort.
Work Menu – Descriptions and Work Measures Task orders will specify estimated quantities in units of measure as described in this section. The contractor’s bid schedule and invoices shall also use the same units of measure.
| ITEM | WORK MEASURE | |
| Sub-scale practice munitions | Tons Processed |
Description: Consists of BDU-33, MK 76, MK 106, 5-inch and 2.75-inch rockets, and other similar sized munitions, either whole or their components, which require demil. Interior cavities will be exposed to allow for visual inspection. 85% of output will be no larger than 4 inches in the shortest dimension. Minimum processing rate of 30 tons per day.
500lb inert bomb Bombs Processed Description: Consists of Mk 82, BDU-45 or BDU-50 full-scale inert bombs. Processing will remove the nose and tail of the bomb and cut the center section into at least two (2) pieces. The inner filling (normally low-strength concrete and vermiculite) will be removed and left on site. Minimum processing rate of 60 bombs per day.
750lb inert bomb Bombs Processed Description: Consists of M117 750lb class bombs. Processing will remove the nose and tail of the bomb and cut the center section into at least two (2) pieces. The inner filling (normally low-strength concrete and vermiculite or sand) will be removed and left on site. Minimum processing rate of 40 bombs per day.
1000lb inert bomb Bombs Processed Description: Consists of MK 83 1000lb class bombs. Processing will remove the nose and tail of the bomb and cut the center section into at least two (2) pieces. The inner filling (normally low-strength concrete and vermiculite or sand) will be removed, and left on site. Minimum processing rate of 40 bombs per day.
2000lb inert bomb Bombs Processed Description: Consists of Mk 84, BDU-56 or BLU-109 full-scale inert bombs. Processing will remove the nose and tail of the bomb and cut the center section into at least two (2) pieces. The inner filling (normally low-strength concrete and vermiculite) will be removed and left on site. Minimum processing rate of 35 bombs per day.
Tank, armored Tanks Processed Description: Consists of heavily armored, tracked fighting vehicle with a main battle gun (usually 105MM or greater) intended to be employed in combat. These vehicles will be demilitarized IAW DoD 4160.21-M-1. Further demilitarization/processing to enhance scrap value will be undertaken if analysis shows a positive cost/benefit.
APC, light vehicles, aircraft Tons Processed Description: Consists of lightly armored, tracked vehicles (armored personnel carriers (APC)), howitzers, tank cranes, light and general purpose wheeled vehicles, construction equipment, aircraft and other “non-tank” armored vehicles. These will be demilitarized IAW DoD 4160.21-M-1. Further demilitarization/processing to enhance scrap value will be undertaken if analysis shows a positive cost/benefit. Minimum processing rate of 20 tons per day.
Miscellaneous metal debris Tons Processed Description: Consists of miscellaneous recyclable metal materials. Examples include: pipes, culverts, expended ammunition and brass cartridges, CONEX containers, sheet metal, angle iron, rebar, dumpsters, etc. Minimum processing rate of 25 tons per day.
Mobilization/Demobilization (Shears) Per Day Description: Consists of all shearing mobilization/demobilization operations. Includes (but is not limited to) the movement of all equipment involved with sorting, shearing and segregation of sheared material, certification, validation, demil, radiation monitoring and packing, transportation, recycling, trash disposal, chain of custody, etc.
Mobilization/Demobilization (Crusher) Per Day Description: Consists of all crushing mobilization/demobilization operations. Includes (but is not limited to) the movement from site to site of all equipment involved with sorting, crushing and segregation of crushed material, certification, validation, demil, radiation monitoring and packing, transportation, recycling, trash disposal, chain of custody, etc.
Travel (Personnel) Per Work Site Description: Consists of all personnel mobilization/demobilization. Includes (but is not limited to) the movement from site to site of personnel involved with inspecting, sorting, crushing, segregation of material, demil, certification, radiation monitoring, material packaging, transportation, recycling, trash disposal, chain of custody, etc.
Trash disposal Per Cubic Yard Description: Consists of all trash disposal operations. Includes (but is not limited to) sorting, certification, validation, demil, radiation monitoring and packing, loading and transportation to the appropriate landfill, chain of custody, etc. Also includes disposal costs for items such as tires which may require additional processing or permitting.
Range clearance Per Day Description: Provide all labor, personal protective equipment and incidental supplies to perform a complete surface clearance of specified impact areas or other range lands. Includes area surveys; inspection of munitions, munitions debris and targets for the presence of UXO or explosives; collection of munitions and debris for transport to the RHA; and use of government-furnished specialized vehicles (ATV, HMMWV, etc.). The contractor’s range clearance team shall be sized to completely clear the area of surface munitions according to the schedule in the task order. Coordinate with the range manager for normal range operating hours (typically 8 hour workdays) and use of locally assigned government-owned specialized vehicles. UXO and other explosive hazards shall be flagged and reported to servicing military EOD function for action. Contractor shall not render safe UXO or conduct explosive operations.
Waste characterization Per Sample Tested Description: Consists of testing to determine or “characterize” an unknown waste material. May include full testing or a lesser level of testing if material is known but confirmation is needed.
Third Party UXO Quality Assurance Per Day Description: A third party individual qualified to perform duties described in Section 6.4.
DISPOSITION
Recycling:
MDAS described as scrap metal will be recycled to the maximum extent possible. The contractor shall document transportation costs and credits paid for recyclables, and provide a summary to the on-site QAE or Range Manager. Funds received shall offset transportation costs and any recycle funds remaining shall be applied towards: 1) additional R3 work remaining on the task order; 2) R3 work as identified by the QAE; 3) R3 work on future task orders; or 4) returned to the government.
Transportation . The desired method is to transport MDAS directly from the range to the nearest scrap metal vendor for immediate processing. This minimizes risk to the government. The contractor and UXO QA shall perform a final radiological and UXO check of each transport load, the load will be sealed, locked and weighed, and this information documented on the shipping papers. Radiation limits are established in the Nuclear Regulatory Guide 1.86, Table 1, Acceptable Surface Contamination Levels but recyclers typically use a much lower threshold.
The contractor is encouraged to explore ways to optimize the transport and recycling process, such as the use of smaller boxes, rail transport, etc.
Trash:
MDAS with no recycle value will be delivered to a landfill. Concrete and wood will be segregated and left on site unless otherwise directed by range personnel. Tires shall be processed on site or delivered to a tire processing center or landfill authorized for receipt of tires.
Shipment Weights:
All MDAS shipments leaving the site shall be weighed for accountability and to ensure shipments are in compliance with Department of Transportation weight limits. Scales shall be calibrated as needed and calibration dates shall be visible. Scale sheets will be used to track the daily throughput of loads, weights and receivers in support of the chain-of-custody and provide positive control of all material leaving the site.
RCRA-Regulated Materials:
All RCRA-regulated materials such as batteries, antifreeze, oil and other materials encountered shall be delivered to the nearest on-range hazardous waste IAP permitted to receive it for eventual disposal by the government. The contractor shall coordinate with the IAP manager to ensure proper receipt and chain of custody of the items. The contractor shall comply with requirements in 40 CFR 260-270 and installation procedures.
Low Level Radioactive Wastes (LLRW):
LLRW such as luminous dials will be packaged and secured in an on-site storage area (designated by the Range Manager) for eventual disposal by the Government. The contactor shall provide a copy of the LLRW discovery report to the on-site QAE when LLRW is placed at the designated location. The report shall describe the material, quantity, detection instrument make/model and readings obtained.
APPLICABLE DOCUMENTS
Guidance and reference documents include, but are not limited to, the following:
Federal, State and Local Regulations 10 CFR 20, Standards for Protection Against Radiation 29 CFR 1910.120, Occupational Safety and Health Standards, Hazardous Waste Operations and Emergency Response 40 CFR 260-270, Environmental Protection Agency Hazardous Waste Management System, the Military Munitions Rule 49 CFR 100-178, Department of Transportation Hazardous Materials Safety Applicable State and Local regulations DoD Regulations DoD Instruction 4140.62, Material Potentially Presenting an Explosive Hazard DoD 4145.26-M, DoD Contractor’s Safety Manual For Ammunition and Explosives DoD 4160.21-M, Defense Material Disposition Manual DoD 4160.21-M-1, Defense Demilitarization Manual AFI 13-212, Range Planning and Operations AFI 32-7042, Solid and Hazardous Waste Compliance AFI 32-7043, Hazardous Materials Emergency Planning and Response Guide AFI 4-119, Medical Service Environmental Quality Programs HQ Army Industrial Operations Command Pamphlet 385-1, Handling of Unwanted Radioactive Material DoD Explosives Safety Board Technical Paper 18, Minimum Qualifications for Unexploded Ordnance (UXO) Technicians and Personnel USAF CONOP For EOD Range Clearance Operations Acronyms ACC – Air Combat Command BDU – Bomb Dummy Unit CONOP – Concept of Operations DDESB – DoD Explosive Safety Board DoD – Department of Defense EOD – Explosive Ordnance Disposal HE – High Explosive IAP – Initial Accumulation Point IRSO – Installation Radiation Safety Officer LLRW – Low Level Radioactive Waste MDAS – Material Determined As Safe MPPEH – Material Potentially Presenting an Explosive Hazard RCRA – Resource Conservation Recovery Act RHA – Residue Holding Area UXO – Unexploded Ordnance DRAFT R3 PWS-16Nov10
ESTIMATED QUANTITIES
This section provides quantity estimates for services to be performed under this contract. The actual quantities and locations to be serviced may vary depending on availability of funds and at the discretion of the Air Force.
ACC Ranges The quantities listed below are estimates of the materials recovered annually at the primary locations to be addressed in this contract. The actual amounts may vary from year to year depending on the intensity of training and other factors. The Air Force may elect to conduct residue processing on an infrequent basis (such as every other year) to maximize the economy of scale.
Description
Unit
| Avon Park |
| Dare County |
| Grand Bay |
Holloman** Juniper Butte
Poinsett
| Saylor Creek |
| UTTR |
| Subscale practice munitions* |
| Ton |
| 100 |
| 100 |
| 80 |
| 150 |
| 0 |
| 110 |
| 120 |
| 100 |
| 500# Inert Bomb |
| Each |
| 400 |
| 300 |
| 100 |
| 100 |
| 300 |
| 200 |
| 400 |
| 600 |
| 750# Inert Bomb |
| Each |
| 10 |
| 2 |
| 2 |
| 5 |
| 0 |
| 2 |
| 5 |
| 5 |
| 1,000# Inert Bomb |
| Each |
| 10 |
| 2 |
| 2 |
| 5 |
| 0 |
| 5 |
| 10 |
| 10 |
| 2,000# Inert Bomb |
| Each |
| 100 |
| 50 |
| 10 |
| 25 |
| 50 |
| 16 |
| 100 |
| 200 |
| Tank, Armored |
| Each |
| 2 |
| 0 |
| 1 |
| 2 |
| 0 |
| 1 |
| 1 |
| 1 |
| APC / Light Vehicles / Aircraft |
| Ton |
| 100 |
| 25 |
| 15 |
| 150 |
| 25 |
| 150 |
| 125 |
| 100 |
| Miscellaneous Metal Debris |
| Ton |
| 100 |
| 25 |
| 50 |
| 150 |
| 25 |
| 250 |
| 125 |
| 100 |
| Trash Disposal |
| Ton |
| 25 |
| 20 |
| 10 |
| 25 |
| 15 |
| 5 |
| 15 |
| 15 |
* BDU-33/MK 106/2.75-inch rockets ** Includes Centennial, Oscura and Red Rio ranges
Other Ranges Other Air Force commands or other military components may elect to utilize this contract for work at their ranges. The locations of these ranges and estimated quantities cannot be accurately predicted since the interval between cleanups will be determined by others and will likely be limited based on availability of funds.
The ranges listed below represent a sample of the varied nature of work which may be performed. Work is likely to be a single (non-recurring) visit to process existing stockpiles of range residue.
Description
Unit
| Melrose (AFSOC) |
| Eielson (PACAF) |
| Adirondack (ANG) |
| McMullen (ANG) |
| Smokey Hill (ANG) |
| Airburst (ANG) |
| Razorback (ANG) |
| Subscale practice munitions |
| Ton |
| 100 |
| 150 |
| 125 |
| 20 |
| 50 |
| 50 |
| 500# Inert Bomb |
| Each |
| 600 |
| 1600 |
| 400 |
| 5 |
| 500 |
| 200 |
| 250 |
| 750# Inert Bomb |
| Each |
| 5 |
| 30 |
| 0 |
| 0 |
| 0 |
| 5 |
| 0 |
| 1,000# Inert Bomb |
| Each |
| 5 |
| 240 |
| 0 |
| 0 |
| 0 |
| 5 |
| 0 |
| 2,000# Inert Bomb |
| Each |
| 150 |
| 150 |
| 15 |
| 5 |
| 15 |
| 10 |
| 5 |
| Tank, Armored |
| Each |
| 1 |
| 0 |
| 2 |
| 0 |
| 0 |
| 0 |
| 1 |
| APC / Light Vehicles / Aircraft |
| Ton |
| 20 |
| 60 |
| 500 |
| 10 |
| 50 |
| 20 |
| 100 |
| Miscellaneous Metal Debris |
| Ton |
| 25 |
| 500 |
| 500 |
| 200 |
| 100 |
| 300 |
| 100 |
| Trash Disposal |
| Ton |
| 5 |
| 10 |
| 20 |
| 15 |
| 15 |
| 20 |
| 10 |
REPORTS AND DOCUMENTATION
An example Invoicing Detail Report.
An example Monthly Report.
An example Shipping Summary.
An example DD Form 1348-1A.