Statement of Need: Heron Generators and Blg 928 Command Post Back-up Generators
This requirment is for the lease of generators to support Heron 1 operations at Gila Bend Air Force Auxiliary Field and Luke AFB, AZ. Contractor will be required to supply the generators, support them before and during the exercise and remove them at exercise end. Requirement will also include grounding of the equipment.
Requirements:
--The following generators will be required from 14 Nov 15 to approximately 19 November depending on Singapore departure times.
4 each 15 KVA generators @ 50hz with two outlets, one 230volt, 3 phase, 32amp outlet and one 230v, single phase, 16amp outlet.
8 each 65 KVA 3 phase generators @ 50 hz 1 each 5 KVA generator with four 230v 1 phase, 16 amp outlets All associated cabling.
Contractor will be required to assist Singapore in connecting to their equipment.
Known connections being used by Singapore are Stahl 8570/12-306 rated for 200-250v and Marechal DXN3, UMAX 690v @ 50 hz
-- The following generators will be required from 1 Dec 15 to approximately 19 Dec 15 and will be located at Building 928, Luke AFB, AZ. They will be used strictly for back-up. Singapore will require a daily operational check.
| 1 ea. 300kw generator | |
| 1 ea. 120kw generator | |
| All associated cabling | to connect to HVAC and electrical. |
Contractor will not be responsible for connecting or disconnecting to the building electrical box.
Quote must include all associated fees and delivery/pick-up and labor.