PWS - Gulfstream Training.pdf

PDF 250 KB Posted

Attached to
Intent to Sole Source - Gulfstream Training
Solicitation number
FA4877418TESGST
Issued by

About this file

Performance Work Statement Summary

This Performance Work Statement (PWS) from Headquarters Air Combat Command (HQ ACC), 418 Test and Evaluation Squadron, establishes training requirements for EA-37B (Gulfstream G550) pilots. The contractor shall provide Initial, Refresher, Academic, and Simulator Training along with specialized technical courses for Air Force flight crews operating Gulfstream aircraft. Training must be conducted at a Federal Aviation Administration (FAA) approved training center located in the Continental United States by FAA-certified instructors with minimum one-year experience in Gulfstream G550 instruction and instruction within the last five years on that aircraft model.

Key service requirements include Initial Pilot Training (three pilots in FY27, standard to ATP Type Certification), Refresher Pilot Training (one to three pilots per class), Pilot Proficiency Training, Supplementary Simulator Training (estimated 40 hours annually), RNP Authorization Required (AR) Pilot Training, Reject Takeoff Pilot Training, Upset Prevention Initial Training, Energy Management Training, Pilot International Procedures Course (minimum 7.0 hours), and ADSB/CPDLC Training. The contractor must furnish an FAA Certified Level C fully operational G550 flight simulator capable of CAT II Instrument Landing System approaches. All training courses include handouts, computer-based libraries, online training, and ACC cockpit procedures. Training days maximum 9 hours (10 hours for evaluations), conducted Monday through Friday between 6:00 a.m. and 8:00 p.m. local time, with minimum 12-hour crew rest between training periods. The anticipated Period of Performance includes a base year plus two one-year option periods. Deliverables include an Organizational Conflict of Interest Mitigation Plan (due within 30 days of award), Monthly Progress/Status Reports (due on or before the 15th of each month), Records of Training (due within 15 days following course completion), Course Syllabi/Courseware (due within 2 weeks of award), and Student Course Critiques (due within 15 days following course completion).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Headquarters Air Combat Command (HQ ACC) 418 Test and Evaluation Squadron

Performance Work Statement (PWS) For

Gulfstream G550 Training for EA-37B Pilots

TABLE OF CONTENTS

SECTION 1 DESCRIPTION OF SERVICES

SECTION 2 DELIVERABLES

SECTION 3 SERVICES SUMMARY

SECTION 4 CONTRACTOR FURNISHED ITEMS AND SERVICES

SECTION 5 GOVERNMENT FURNISHED ITEMS AND SERVICES

SECTION 6 STUDENT ADMINISTRATION

SECTION 7 GENERAL INFORMATION

SECTION 1 DESCRIPTION OF SERVICES.

1.1. BACKGROUND. Air Combat Command (ACC) operates the EA-37B, a fleet of modified Gulfstream 550 (G550) aircraft. ACC-assigned Gulfstream aircraft are tasked to provide timely, worldwide electronic attack missions in support of Geographic Combatant Commanders, and the 418 TES is tasked with tactics development and evaluation of this platform. EA-37B pilot trainees from the 418 TES include current and qualified instructor pilots on the HC-130J that have been approved by ACC for a dual qualification.

1.2. SCOPE. The contractor shall provide Initial, Refresher, Academic, and Simulator Training, as well as a variety of technical courses for ACC flight crews operating Gulfstream aircraft. The required training includes the following: Initial and Refresher Pilot Training, Differences Pilot Training, Pilot Proficiency Training, Supplementary Simulator Training, Required Navigational Performance (RNP) Authorization Required (AR) Pilot Training, Reject Takeoff Pilot Training, Upset Prevention Initial Training, and International Procedures Training.

During training, pilots shall split the flying time between the left and right seat. The individual student pilot is responsible for any FAA prerequisites and coordination with the contractor if they wish to receive an Airline Transport Pilot (ATP) certification or 14 CFR Part 61.58 check.

All training courses shall include handouts, access to any pertinent computer-based libraries, and on-line computer-based training as deemed appropriate by the contractor for training purposes. ACC cockpit procedures shall be used and instructed. A syllabus in the contractor’s format will be provided to each student prior to the beginning of class.

1.3. KNOWLEDGE, SKILLS, AND ABILITIES. A qualified contractor will meet the following knowledge, skills, and abilities (KSAs) qualifications:

1.3.1. Provide instructors with Federal Aviation Administration (FAA) certification with a minimum of one year experience in Gulfstream G550 instruction and have instructed within the Gulfstream G550 in the last five years.

1.3.2. Possess an applicable training program approved under 14 Code of Federal Regulation (CFR) Part 142 or equivalent.

1.3.3. Conduct training in an FAA approved training center (located in the Continental United States).

1.3.4. At a minimum, furnish onsite, an FAA Certified Level C fully operational G550 flight simulator appropriate to the EA-37B training being conducted. The USAF EA-37B simulators must also be capable of CAT II Instrument Landing System (ILS) approaches.

1.4. SPECIFIC SUPPORT SERVICES.

1.4.1. Flight Training for USAF EA-37B (Gulfstream 550 (G550))

1.4.1.1. Initial Pilot Training. The contractor shall conduct Gulfstream 550 (EA-37B) Initial Pilot Training.

The training class will normally consist of three pilots, with all three required in FY27. Initial training shall be to the standard equivalent to an ATP Rating Type Certification. Initial ATP Rating Type Certification will be accomplished by each pilot in the left seat. If the ATP option is not utilized, the student will not be released early and the simulator time scheduled for FAA evaluation shall be devoted to proficiency maneuvers. The contractor will collaborate with the Government Contracting Officer Representative (COR) to identify, sequence, and develop simulator profiles for initial training courses. Training shall be in-person and instructor-led.

Simulator training events each day will be preceded with a two-hour pre-brief and up to a one-hour post brief.

At the Government’s discretion, a USAF examiner pilot may travel to the contractor’s facility and observe the FAA Type Check. If required, when the FAA check is completed, a USAF examiner will observe several maneuvers that exceed FAA requirements on the last scheduled simulator training day. The contractor shall incorporate Crew Resource Management/Threat and Error Management (CRM/TEM) into all pilot training simulator briefings, debriefings, and ground school in the General Operations Subjects segment as part of all initial and refresher pilot training courses. Training and services will address CRM concepts through Line Oriented Flight Training (LOFT)/Mission Oriented Simulator Training (MOST). MOST is the Air Force equivalent of LOFT. The CRM training shall be IAW AFMAN 11-290_ACC Supplement, Cockpit/Crew Resource Management and Threat & Error Management Program.

1.4.1.2. Refresher Pilot Training. The contractor shall conduct Gulfstream 550 (EA-37B) Refresher Pilot training. The training class will consist of one to three pilots per class. Simulator training events each day will be preceded with a one-hour pre-brief and up to a one-hour post brief. The contractor shall incorporate Crew Resource Management/Threat and Error Management (CRM/TEM) into all pilot training simulator briefings, debriefings, and ground school in the General Operations Subjects segment as part of all initial and refresher pilot training courses. Training and services will address CRM concepts through Line Oriented Flight Training (LOFT)/Mission Oriented Simulator Training (MOST). MOST is the Air Force equivalent of LOFT. The CRM training shall be IAW AFMAN 11-290_ACC Supplement, Cockpit/Crew Resource Management and Threat & Error Management Program. NOTE: Refresher training may be oriented toward fulfillment of 14 CFR Part 61.58 “Pilot-in-command proficiency check” requirements at the discretion of the USAF pilots and contractor. Trainees are responsible for any associated prerequisites and prior coordination with the contractor. Training shall be in-person and instructor-led.

1.4.1.3. Pilot Proficiency Training. The contractor shall conduct Gulfstream 550 (EA-37B) Proficiency Training. The training class will normally consist of one to three pilots per class. This training shall provide pilot proficiency training emphasizing aircraft normal and emergency systems operation (including, but not limited to, these emergency situations: crash landing, ditching, smoke in the cabin) and instrument procedures. Simulator training events each day will be preceded with a one-hour pre-brief and up to a one-hour post brief. Pre brief should cover desired learning objectives by the pilot. During proficiency training, customer-developed training profiles shall be used. At the discretion of the Government, a USAF examiner pilot may attend the last scheduled simulator training day to complete an Air Force flight evaluation. At the discretion of the Government, a USAF instructor pilot may attend one or both days to instruct pilots on USAF unique approach and departure procedures training. During these periods, a contractor employee will operate the simulator and will collaborate with the Air Force instructor to optimize training benefit. The unique approach and departure procedure training is a one-time requirement for each pilot before they upgrade to Aircraft Commander. Training shall be in-person and instructor-led.

1.4.1.4. Supplementary Simulator Training Hours. The COR through the Contracting Officer (CO), may authorize simulator hours in addition to those specified under Pilot Qualification Training or for any other mission requirement approved by the COR. Units may schedule additional simulator hours to meet unique training requirements. Training will be scheduled in two-hour blocks with an estimated 40 hours required each year.

1.4.1.5. Simulator Position Fill-Ins. When the Government is unable to send two pilots to any portion of simulator training due to unplanned circumstances like weather or emergency, the contractor will supply a Type-rated instructor or a Second-In-Command (SIC) pilot, who is familiar with USAF procedures, to act as the second pilot. The contractor instructor will participate in all required simulator training.

1.4.2 EA-37B (G550) Specific Training Service

1.4.2.1. RNP AR Pilot Training. The contractor shall provide RNP Authorization Required (AR) training.

The training class will consist of one to three pilots per class. The course will provide sufficient detail on the aircraft’s navigation and flight control systems to enable pilots to identify failures affecting the aircraft’s RNP capability and then apply the appropriate contingency procedures. Training shall be Gulfstream 550 specific, instructor-led, and taught in-person.

1.4.2.2. Pilot Recurrent International Procedures Course. The contractor shall provide Pilot International Procedures training. The training class will consist of one to three pilots. The Pilot International Procedures Course shall be a minimum of 7.0 training hours in length and include a review of International and Special Use Airspace procedures as specified in the current FAA Order 8700.1, Chapter 222, General Aviation Operations Inspectors Handbook or reference material as updated by the FAA authorities. Training shall include; a review of basic and updated International Operations and emergency procedures, regulatory and technological changes, oceanic flight, navigation, flight planning, equipment requirements, communications procedures, customs, Reduced Vertical Separation Minimum (RVSM), Minimum Navigation Performance Specifications (MNPS), and Required Navigation Performance (RNP)-5 & 10 airspaces, as well as upcoming world airspace changes. Training is not required to be aircraft specific. Training shall be instructor-led and taught in-person or through Synchronous Online Learning.

1.4.2.3. Reject Takeoff Pilot Training. The contractor shall provide Reject Takeoff Pilot Training. The training class will normally consist of one to three pilots. The training class shall provide simulator training on running go/no-go standard operating procedures. Training shall be Gulfstream 550 specific, instructor-led, and taught in-person.

1.4.2.4. Upset Prevention Initial Training. The contractor shall provide Upset Prevention Initial Training.

The training class will normally consist of one to three pilots. The training course will provide classroom and simulator training on In-flight Loss of Control and Recovery techniques using actual flight test data approved by Gulfstream experimental test pilots. This training is independent of the normal stall sequences practiced in a standard initial or recurrent (refresher) training event and utilizes a newly modified aerodynamic model for realism. Training shall be Gulfstream 550 specific, instructor-led, and taught in-person.

1.4.2.5. Energy Management Training. The contractor shall provide Energy Management Training. The training class will normally consist of one to three pilots. The course will provide sufficient detail on how to manage aircraft energy to enable pilots to effectively achieve and maintain desired vertical flight paths and airspeed profiles and for transitioning to different mission profiles during flight. Training shall be Gulfstream 550 specific, instructor-led, and taught in-person.

MORTON, JUDAH E SrA USAF ACC 355 CONS/PKP Just called Maj Johnson, he said he’s looking to remove this from the CLINs, he’ll confirm with us once we get a quote

MORTON, JUDAH E SrA USAF ACC 355 CONS/PKP Maj Johnson is also looking to remove this

1.4.2.6. ADSB and CPDLC Training. The contractor shall provide Automatic Dependent Surveillance – Broadcast (ADSB) and Controller Pilot Data Link Communications (CPDLC) training. The training class will normally consist of one to three pilots. If available, trainees will receive access to contractor provided web-based eLearning courseware modules. Trainees shall be allowed multiple opportunities on an annual basis to access the modules. The Government may pursue access to other modules in response to evolving technologies and Air Traffic Control (ATC) procedures through an appropriate contract modification.

Training is not required to be aircraft specific. Training shall be instructor-led and taught in-person or shall be provided through eLearning.

SECTION 2 DELIVERABLES.

The contractor shall provide contract deliverable(s) in a format mutually agreed upon by the Government and the contractor. All deliverables will be reviewed for timeliness, accuracy, and format. If a deliverable due date falls on a weekend or holiday, the contractor shall submit the deliverable on the last workday prior to the due date.

Table 1 - Deliverables

Data Item Deliverable Title PWS

Reference Deliver

To Due Date

A001 Organizational Conflict of Interest (OCI) Mitigation Plan 2.1 CO/COR Within 30 calendar days from notice of award

A002 Monthly Progress, Status, and Management Report 2.2 CO/COR On or before the 15th of each month after notice of award

A003

Record of Training

2.3 COR/

Student Within 15 days following completion of each course

A004 Course Syllabi/Courseware 2.4 COR Within 2 weeks after notice of award and as required

A005 Student Course Critique 2.5 COR Within 15 days following completion of each course

2.1. Organizational Conflict of Interest (OCI) Mitigation Plan. The contractor shall provide the CO and COR a plan that describes the processes and procedures they will implement to avoid or mitigate any actual or perceived OCI. The plan shall outline how the contractor evaluates, mitigates (where necessary), and reevaluates any potential or perceived conflicts between this contract and other work performed by the contractor or team members.

2.2. Monthly Progress, Status, and Management Report. The contractor shall provide the CO and COR a status report for the duration of the effort. The report shall summarize training progress and status by course during the reporting period to include the following:

• A narrative review of training by each course completed during the reporting period, to include the number of students enrolled, graduated, and released from training.

• Progressive and problem areas to include outstanding issues and recommendations/solutions.

• Lessons learned, risks, and significant accomplishments.

• Consolidated results of critiques for each course completed during the reporting period.

• Any significant changes.

2.3. Record of Training. The contractor shall provide the student and the COR with a copy of individual records of training by email and/or via myFlightSafety web portal.

2.4. Course Syllabi/Courseware. The contractor shall provide a copy of their syllabus for each class with their proposal and within two weeks after contract award if any changes have occurred since submitting the proposal. The contractor may consider Government requested changes to the syllabus.

2.5. Student Course Critique. The contractor shall provide the COR a copy of all individual course critiques by email and/or via myFlightSafety web portal.

SECTION 3 SERVICES SUMMARY

The Services Summary (SS) table below summarizes the most important performance objectives and thresholds (specific standards) as identified within the body of the PWS. The absence of any performance objective and threshold from this summary shall not detract from its enforceability or limit the Government’s rights or remedies afforded under this contract. Metrics shall be calculated monthly unless otherwise specified.

Table 2 - Services Summary

Performance Objective PWS Paragraph Performance Threshold

Provide Initial Pilot Training 1.4.1.1. COR shall receive no more than one valid student complaint concerning quality of instruction during a training quarter.

Provide Refresher Pilot Training 1.4.1.2. COR shall receive no more than one valid student complaint concerning quality of instruction during a training quarter.

Provide Pilot Proficiency Training 1.4.1.3. COR shall receive no more than one valid student complaint concerning quality of instruction during a training quarter.

Provide Supplementary Simulator Training Hours 1.4.1.4. COR shall receive no more than one valid student complaint concerning quality of instruction during a training quarter.

Provide Simulator Position Fill-Ins 1.4.1.5. COR shall receive no more than one valid student complaint concerning quality of instruction during a training quarter.

Provide Specific Training Courses 1.4.2.1. - 1.4.2.6. COR shall receive no more than one valid student complaint concerning quality of instruction during a training quarter.

Provide Deliverables as required 2.1. – 2.5. Completed deliverables shall be provided on time, 95% of the time with 100% accuracy

Provide Appropriate Simulator Training

4.1. - 4.2.

FAA Certified Level C fully operational (100% of the time) Flight Simulator appropriate to the Gulfstream aircraft model training being conducted. The simulators must also be capable of CAT II Instrument Landing System approaches.

SECTION 4 CONTRACTOR FURNISHED ITEMS AND SERVICES

4.1. The contractor shall provide Initial, Refresher, Academic, and Simulator Training, as well as a variety of technical courses for USAF flight crews operating Gulfstream series aircraft. All training shall be conducted in a Federal Aviation Administration (FAA) approved training center by FAA certified instructors with a minimum of one year experience Gulfstream G550 instruction and have instructed within the last five years on the Gulfstream G550.

Who will be the appointed CORs?

4.2. The contractor must possess an applicable training program approved under 14 Code of Federal Regulation (CFR) Part 142, or equivalent. At a minimum, the contractor shall furnish onsite, an FAA Certified Level C fully operational Flight Simulator appropriate to the Gulfstream aircraft model training being conducted. The EA-37B simulators must also be capable of CAT II Instrument Landing System approaches.

4.3. The contractor shall also furnish all training materials, and any other equipment required to perform this contract except for the materials and equipment that are identified to be Government furnished.

4.4. Other than the publications identified as government furnished in Section 5, it is the responsibility of the contractor to furnish all copies of the forms necessary to fulfill the requirements of this performance requirements document.

4.5. If available, new AF pilots will receive access to the contractor’s most current Web- based, asynchronous, distance learning courseware in conjunction with the initial pilot training course. The Web-based learning is to be delivered over the internet or corporate intranet.

SECTION 5 GOVERNMENT FURNISHED ITEMS AND SERVICES

5.1. The government shall provide the following to the contractor after contract award:

• ACCMAN 11-2EA-37B,Vol 3, SAM Operations Procedures

• ACC Cockpit Procedures and Checklists

SECTION 6 STUDENT ADMINISTRATION

6.1. Student Qualifications. At the time of scheduling, the COR or designated flying unit shall inform the contractor whether the student possesses the FAA prerequisites required to receive an ATP or FE Rating/Type Certification (as applicable) rating upon completion of training.

6.2. Unsatisfactory Academic Performance. Students whose academic progress does not meet the established course standards will continue in training and will be reported as indicated below. If the contractor determines a student should be released from training for any reason listed below, a message shall be forwarded to the COR and CO within 24-hours of the determination. The COR will notify the student’s unit of assignment. The student will remain in class until disposition instructions are received from the Government.

• The student’s academic progress fails to meet established course standards, and, in the opinion of the contractor’s course supervisor, cannot satisfactorily complete the course;

• The student’s physical condition, by reason of injury or illness, has been changed to the extent that further training is deemed impracticable;

• An emergency develops which in the best interest of the Air Force, for compassionate reasons or for personal emergency, requires a student to be withdrawn from training, either temporarily or permanently.

6.2.1. If a pilot has not met required proficiency standards after completion of the training outlined in the schedule and in the specifications herein, including an FAA evaluation, the contractor shall notify the COR within one business day.

6.3. Tailored Training to Meet ACC Requirements.

6.3.1. Upon award, ACC cockpit procedures and checklists will be provided to the contractor and shall be used during training. Prior to the initial start of aircrew training, the COR or a designated subject matter expert (SME) will collaborate with instructor personnel to answer any questions and ensure understanding of ACC procedures and checklists. If required, the COR or a designated SME may travel to contractor facility to instruct/ brief key personnel (instructors) on these procedures and checklists. Additionally, the COR or a designated SME will provide updates as required and will be available for telephone inquiries from the contractor.

6.3.2. The contractor shall collaborate with the COR to identify and sequence training profiles to optimize the contractor training syllabus with ACC learning objectives/maneuver requirements.

6.4. Class Scheduling.

6.4.1. Classes shall be scheduled by direct contact between the COR or a designated flying unit scheduling point of contact and the contractor.

6.4.2. In the event an agreement cannot be reached on scheduling of a class or classes, the matter shall be referred to the CO for resolution. The Government reserves the right to substitute students at its discretion.

6.4.3. The Government shall notify the contractor in writing of any class scheduling change.

6.4.4. If a scheduled trainee is unable to attend or departs a course prior to completion of planned curriculum, not achieving rating/certification, due to personal emergency or emergent operational need (i.e. fatality, injury, illness, or mission critical task) the Government shall not be liable for payment.

6.4.5. If the contractor is unable to provide all planned curriculum and training required for certification (i.e.

simulator malfunction, illness of instructor, etc.) the contractor will coordinate with the COR to evaluate students training to date and/or reschedule training. Government may negotiate with the contractor for partial payment if training is not completed.

6.5. Training Certificate. A Certificate of Training shall be provided to each student upon course completion.

6.6. Course Critiques. Upon completion of each training course, the contractor shall provide each student with a Student Course Critique. Students shall be afforded time to complete the critique in private prior to departure and/or award of course diploma.

SECTION 7 GENERAL INFORMATION

7.1. Period of Performance (POP). The anticipated POP includes a base year, two one-year option periods

7.2. Place of Performance. Training shall be conducted at the contractor’s facility.

7.3. Training Period. A training period is defined as the period of time when a student reports to the training facility to start a training session until the student leaves the facility at the end of the training session.

7.4. Training Times. The maximum length of a training day is 9 hours. Initial and recurring evaluation days may extend to 10 hours. The contractor shall conduct academic training between the hours of 6:00a.m. and 8:00 p.m. local time, unless otherwise specified. This time will include time for breaks and lunch periods. The contractor shall conduct all training from Monday through Friday.

7.5. Crew Rest. A period of time between training periods must be set aside for the student to ensure adequate rest prior to beginning the next training session. This time may not be broken up into segments and must be given as a solid block of time. The minimum length for crew rest time between training periods shall be 12 hours. Students shall be granted one day off for every six consecutive days of training.

7.6. Quality Assurance. In accordance with the Federal Acquisition Regulation (FAR) subpart 37.604, FAR 46.4, and the clause at FAR 52.246-4 (Inspection of Services—Fixed Price), which provides for inspection, acceptance and documentation of the services called for in this PWS, any action taken by the COR, as a result of surveillance, will be in accordance with the terms of the contract. A Quality Assurance Surveillance Plan (QASP) detailing quality assurance/surveillance responsibilities, methods, procedures, and performance thresholds shall be issued with the contract. COR may periodically visit the contractor’s training facility to observe the contractor’s performance in person.

7.7. Security. Training is Unclassified.

MORTON, JUDAH E SrA USAF ACC 355 CONS/PKP Specific dates may be more helpful

MORTON, JUDAH E SrA USAF ACC 355 CONS/PKP Each training day is 9 hours, how many training days will there be?

Additionally, how many personnel will be attending this training?

7.8. Physical Security. The contractor shall safeguard all Government owned equipment and materials (if any) in the contractor’s possession.

7.9. Travel and Other Direct Costs. No contractor travel or other direct costs are required in support of this contract.

7.10. Emergency and Minor Medical Services. The contractor shall provide, to all students receiving training at the contractor’s facility, emergency minor medical services as normally provided to its own employees. If immediate hospitalization is required, the contractor will arrange for the student to be admitted to the nearest available hospital. The student, if a member of the Armed Forces should be admitted to a military hospital if possible. The contractor is not responsible for student hospitalization costs. The contractor shall notify the COR as soon as possible but no late than 24 hours after admitting any student to a hospital.

7.11. Performance of services during crisis declared by the President or Secretary of War up to and including war: None of the services in this PWS are determined to be essential for performance during a crisis.

SECTION 1 DESCRIPTION OF SERVICES.
1.4.1. Flight Training for USAF EA-37B (Gulfstream 550 (G550))
1.4.2 EA-37B (G550) Specific Training Service
SECTION 2 DELIVERABLES.
SECTION 3 SERVICES SUMMARY
SECTION 4 CONTRACTOR FURNISHED ITEMS AND SERVICES
SECTION 5 GOVERNMENT FURNISHED ITEMS AND SERVICES
SECTION 6 STUDENT ADMINISTRATION
6.3. Tailored Training to Meet ACC Requirements.
6.4. Class Scheduling.

SECTION 7 GENERAL INFORMATION

File details come from the government source that posted it. Updated .