2026.11.24_AE IDIQ Request for Qualifications.pdf

PDF 471 KB Posted

Attached to
AE IDIQ 2027 Request for Qualifications Davis Monthan Air Force Base
Solicitation number
FA487727R0002
Issued by

About this file

This is a Synopsis Solicitation and Request for Qualifications for an Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract for Architect-Engineer (A-E) services.

The 355th Contracting Squadron intends to award approximately three Multi-Discipline IDIQ contracts valued at $7.5 million each to provide architectural and engineering services for Davis-Monthan Air Force Base in Tucson, Arizona, and potentially other Department of War (DoW) agencies within 150 miles of the Tucson Metropolitan area. This is a 100% Small Business Set-Aside under NAICS code 541330 with a size standard of $25.5 million. Each contract will consist of a five-year base period plus five one-year option periods, totaling ten years of potential performance. Services will be procured under the Selection of Architect-Engineers Act (Brooks Act) using the Firm Fixed Price labor rate structure negotiated prior to award. The contract will cover Title I services (design and planning), Title II services (construction oversight and inspection), and Other A-E services including studies, investigations, master planning, and feasibility analyses for facilities, general infrastructure, and airfield infrastructure projects.

Offerors must submit a Standard Form (SF) 330 electronically via the Procurement Integrated Enterprise Environment (PIEE) no later than Noon Arizona Time on January 8, 2026. Questions are due by close of business December 7, 2026. Selection will be based on five criteria in order of importance: Specialized Experience and Technical Competence (minimum five relevant projects, maximum ten), Knowledge of Locality and Location (Tucson, Arizona area), Past Performance (CPARS evaluations required), Capacity to Accomplish the Work (minimum $1.5 million average annual A-E services revenue over three years), and Professional Qualifications of key personnel (minimum ten years design experience required). Firms must register in the System for Award Management (SAM) and provide their CAGE Code and Unique Entity ID (UEID) with submissions. The Government may conduct interviews during final selection. Organizational Conflicts of Interest restrictions prohibit awarded contractors from bidding on construction services for projects designed under this contract.

View the file

Other files

File Type Posted
Atch 2 - Request for Qualifications QA.xlsx XLSX spreadsheet
Atch 1 - SF330 (blank).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

24 November 2026

SYNOPSIS SOLICITATION/ REQUEST FOR QUALIFICATIONS

For

INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ) CONTRACT FOR

ARCHITECT-ENGINEER (A-E) SERVICES FOR TRADITIONAL TITLE I, TITLE

II, AND OTHER A-E SERVICES

A. GENERAL INFORMATION.

The 355th Contracting Squadron (CONS) in conjunction with the 355th Civil Engineer

Squadron (CES) intends to contract with Architect-Engineer (A/E) firms in support of the Air

Force’s Design and Construction mission. The Government anticipates awarding approximately three (3) Multi-Discipline Indefinite-Delivery, Indefinite-Quantity (IDIQ) Architect-Engineer

(A-E) contracts to provide Architectural-Engineering (A-E) Services as required for Davis-

Monthan Air Force Base, Tucson, Arizona, as well as, potentially, other Department of War

(DoW) agencies within 150 miles of the Tucson Metropolitan area. Each IDIQ Contract awarded will have an estimated ceiling of $7.5M. This requirement is a 100% Small

Business Set-Aside under NAICS 541330 with a size standard of $25.5M.

Primary technical services must be performed by individuals who are credentialed members of architectural, planning, science, and engineering professions. Disciplines include, but are not limited to, architects, engineering disciplines typically associated with design and construction, fire protection engineers, landscape architects, interior designers, cost estimators, specification writers, Computer Assisted Design and Drafting (CADD) technicians, publication writers/editors, technical writers, graphic artists, Geographic Information System (GIS) analysts, planners, urban designers, economists, and financial analysts. Generally, a credentialed professional (a) is licensed (e.g., registered professional engineer) to practice in the state of

Arizona and (b) commands the necessary expertise, in terms of knowledge and experience, to undertake the specified task to be identified at the task order level.

For purposes of this synopsis, the term "Offeror" refers to the Prime that submits a Standard

Form (SF) 330 as a result of this synopsis.

All contracts awarded under this announcement are subject to a prohibition on Organizational

Conflicts of Interest (OCI) in accordance with the DAF Contracting Compass. Concerns may be submitted directly to the Contract Specialist Jeff Sorensen via email at jeffrey.sorensen.8@us.af.mil, the Contracting Officer Joshua Drawdy at joshua.drawdy.2@us.af.mil prior to the SF 330 due date.

General Submission Requirements:

A cover letter must be submitted to accompany the SF 330 that clearly identifies the Offeror’s size and socioeconomic status for NAICS 541330 with a size standard of $25.5M.

Questions in response to this Synopsis/ Request for Qualifications are due no later than COB

Monday, 07 December 2026. All questions must be submitted via email to the Points of Contact below using the Request for Qualifications Q&A (Attachment 2). It is the Offeror’s responsibility to confirm receipt.

mailto:jeffrey.sorensen.8@us.af.mil mailto:joshua.drawdy.2@us.af.mil

Contracting Officer: Joshua Drawdy, joshua.drawdy.2@us.af.mil

Contract Specialists: Jeff Sorensen, jeffrey.sorensen.8@us.af.mil

355 CONS SharePoint: 355 CONS, 355CONS.PKA.Construction@us.af.mil

Offerors MUST submit their SF 330 electronically to the Procurement Integrated

Enterprise Environment (PIEE) Solicitation application. SF 330 must be received in the

PIEE Solicitation application no later than Noon, 12:00 p.m., ARIZONA TIME, on 08

January 2026. Offerors must establish a Proposal Manager account to access documents and submit proposals. The Solicitation Module automatically tracks the date and time of all submissions. LATE SUBMISSION OF SF 330s WILL NOT BE ACCEPTED.

All documents for this solicitation can be found in PIEE at https://piee.eb.mil. An overview of the

PIEE Solicitation Module is available at: https://dodprocurementtoolbox.com/site-pages/solicitation-module

Vendor Access Instructions/ Registering for a PIEE Account:

https://dodprocurementtoolbox.com/uploads/PIEE_Solicitation_Module_Vendor_Access_Instru ctions_0_c6b0773c4b.pdf

Submitting a proposal in PIEE (Section 3):

https://dodprocurementtoolbox.com/uploads/PIEE_Solicitation_Module_FA_Qs_120e300325.p df

Proposal Manager Instructions:

https://pieetraining.eb.mil/wbt/sol/documents/Proposal_Manager.pdf

PIEE Solicitation Module Web Based Training:

https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml

All vendors can view solicitation in the PIEE Module by selecting “Solicitation Search” under the Support section at the bottom of the page. The SAM.gov site will reference back to this module.

mailto:joshua.drawdy.2@us.af.mil mailto:jeffrey.sorensen.8@us.af.mil mailto:355CONS.PKA.Construction@us.af.mil https://piee.eb.mil/ https://dodprocurementtoolbox.com/site-pages/solicitation-module https://dodprocurementtoolbox.com/site-pages/solicitation-module https://dodprocurementtoolbox.com/uploads/PIEE_Solicitation_Module_Vendor_Access_Instructions_0_c6b0773c4b.pdf https://dodprocurementtoolbox.com/uploads/PIEE_Solicitation_Module_Vendor_Access_Instructions_0_c6b0773c4b.pdf https://dodprocurementtoolbox.com/uploads/PIEE_Solicitation_Module_FA_Qs_120e300325.pdf https://dodprocurementtoolbox.com/uploads/PIEE_Solicitation_Module_FA_Qs_120e300325.pdf https://pieetraining.eb.mil/wbt/sol/documents/Proposal_Manager.pdf https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml

Personal visits and/or requests for discussion regarding this announcement WILL NOT BE

ENTERTAINED.

ORDERING PERIOD AND CONTRACT TYPE: Each basic IDIQ contract will consist of a five-year (5-year) base period, with provisions for five (5) subsequent one-year (1-year) option periods, yielding a total potential performance period of ten (10) years. IDIQ will be structured to allow for the issuance of Firm Fixed Price (FFP), negotiated, task orders. Labor rates for all ten (10) years will be negotiated prior to award of a contract.

INTENT: At the Task Order level, a more in-depth evaluation will occur to determine which of the IDIQ holders is the most highly qualified for the type of work required by that task order, with specific geographical knowledge of the locality and capacity of the firm to perform that specific task also taken heavily into consideration in the task order selection decision.

TEAMING PARTNERS: The prime firm must provide a statement in the cover letter confirming executed teaming agreements are in place for all team members as part of the SF 330 submittal. The statement must also list all team members. Contractor teaming arrangements are defined as a partnership or an agreement for a specific Government opportunity between a potential prime contractor and one or more companies that are potential subcontractors.

Additionally, all firms selected as the most highly qualified for this A-E IDIQ and issued a

Request for Proposal will be required to submit and negotiate one composite labor rate per labor category/discipline, to be incorporated into the contract. Teaming partner rates will not be negotiated separately.

AWARD PROCEDURES: This IDIQ will be procured in accordance with the Selection of

Architect-Engineers Act (40 U.S.C Sections 1101-1104, previously known as the ‘Brooks Act'), as implemented by RFO 36.102-1. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work, in accordance with the selection criteria identified below. The North American Industrial Classification System (NAICS) code is 541330, which has a size standard of $25.5M. To receive award, contractors must be registered in the

System for Award Management (SAM). Register via the SAM website at http://www.sam.gov.

Those firms selected as the most highly qualified will be issued an individual Request for

Proposal to negotiate labor rates. This synopsis and any resultant contract awards do not guarantee work to selected firms.

ORDERING PROCEDURES: Selection of the most highly qualified firm at the task order level will be consistent with the procedures in RFO 36.102 and R-DFARS 236.102 Further experience and qualifications information from IDIQ holders may be requested as specific project requirements are developed, to ensure the most highly qualified firm is selected at the task order level, such as specific technical qualifications or individual state licensure credentials. The relative importance of selection criteria may vary among task order requirements and may include Primary Selection Criteria and Secondary Selection Criteria.

http://www.sam.gov/

INTERVIEWS: In making the most highly qualified selection, the evaluation board may conduct interviews with the most highly qualified firms (by phone, in person, or in writing) during the final selection process.

RFPs: Firms that are determined to be the most highly qualified will be issued a Request for

Proposal (RFP) to submit composite labor rates covering a variety of architectural, engineering, and engineering support labor categories. Only one set of composite rates per labor category will be negotiated per awarded contract. Most labor categories will include junior, mid-level, and senior rates. Separate rates for specific teaming or joint venture partners will not be negotiated.

TERMS AND CONDITIONS: All work must comply with current DoW United Facilities

Criteria (UFC) and local base design compatibility standards. Base design standards will be incorporated at the IDIQ level. A complete set of applicable Revolutionary FAR Overhaul

(RFO) and agency specific terms and conditions will be incorporated into the subsequent RFP issued to the most highly qualified vendors. To assist prospective offerors in understanding the performance expectations and liability requirements of a resulting contract, a brief overview of critical RFO clauses is provided below. This is not an exhaustive list.

RFO 52.216-19 Order Limitations.

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than ___$1,000.00___, the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor-

(1) Any order for a single item in excess of ___$7,500,000.00__;

(2) Any order for a combination of items in excess of ___$7,500,000.00__; or

(3) A series of orders from the same ordering office within __30__ days that together call for quantities exceeding the limitation in paragraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-

21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within _5_ days after issuance, with written notice stating the

Contractor’s intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

RFO 52.219-14 Limitations on Subcontracting.

RFO 52.236-22 Design Within Funding Limitations.

RFO 52.236-23 Responsibility of the Architect Engineer Contractor.

RFO 52.236-24 Work Oversight in Architect-Engineer Contracts.

RFO 52.244-4 Subcontractors and Outside Associates and Consultants.

DFARS RFO 236.202-371 Statutory Fee Limitation.

(a) The statutes at 10 U.S.C. 7540, 8612, and 9540, for the Departments of the Army, Navy, and

Air Force, respectively, limit the contract price (or fee) for architect-engineer services for the preparation of designs, plans, drawings, and specifications to 10 percent of the project's estimated construction cost. (See PGI 236.202-371).

(b) The 10 percent limit also applies to contract modifications, including modifications involving—

(1) Work not initially included in the contract; apply the 10 percent limit to the revised total estimated construction cost; and

(2) Redesign work; apply the 10 percent limit by—

(i) Adding the estimated construction cost of the redesign features to the original estimated construction cost;

(ii) Adding the contract cost for the original design to the contract cost for redesign; and

(iii) Dividing the total contract design cost by the total estimated construction cost. The resulting percentage may not exceed the 10 percent statutory limitation.

(c) The 10 percent limit applies only to that portion of the contract (or modification) price attributable to the preparation of designs, plans, drawings, and specifications. If a contract or modification also includes other services, the part of the price attributable to the other services is not subject to the 10 percent limit.

DFARS 252.204-7021 Contractor Compliance With the Cybersecurity Maturity Model certification Level Requirements.

DFARS 252.204-7025 Notice of Cybersecurity Maturity Model Certification Level

Requirements.

ORGANIZATIONAL CONFLICTS OF INTEREST: To prevent an unfair competitive advantage, the Contractor, including its parent, subsidiaries, affiliates, and any subcontractors at any tier performing work under this IDIQ shall be ineligible to bid on, propose, or perform construction services for any project designed under this contract.

QUESTIONS: A pre-proposal (pre-SF 330 submission) conference will not be held.

Questions and Government responses will be attached as a separate document. If applicable, responses will be incorporated into this Synopsis.

B. DESCRIPTION OF WORK.

This contract will support the award of Architect-Engineer (A-E) services specifically associated with “Facilities”, “General Infrastructure”, and “Airfield Infrastructure”, as identified in individual Task Orders:

1. General Scope: Design and engineering-related Title I, Title II and Other A-E

Services for projects primarily involved in new, restoration, renovation, sustainment, and/or modernization for Department of War (DoW) facilities, general and/or airfield infrastructure, as defined below.

2. Definitions: The following definitions are provided to aid in the preparation of your

SF 330:

a. "Project" is defined as work performed pursuant to ONE SPECIFIC TASK

ORDER of an indefinite delivery/indefinite quantity (IDIQ) type contract.

An IDIQ type contract, in and of itself, is NOT considered a project.

"Project" is also defined as a single, stand alone, site-specific contract. For the purposes of this evaluation a project is an A-E project (not construction).

b. Airfield Infrastructure includes work associated with (where the preponderance of work includes): Runways, overruns, rotary-wing runways, helipads, landing lanes, taxiways, aprons, landing zones, communications infrastructure, storm water systems, visual air navigation facilities, security fencing and access control, airfield lighting, aircraft arresting systems, and ancillary facilities such as airfield lighting vaults, equipment shelters, and petroleum fueling hydrants, piping and associated facilities. Pavement types include Concrete and Asphalt.

c. Facilities includes (where the preponderance of work includes): Design for new facilities, including additions, or facility sustainment, repair, modernization and demolition activities. The projects may include alterations or additions to pavement or physical building access, including but not limited to parking, fencing, sidewalks, access roads, driveways, or ammunition and explosives storage magazines. Design will include airfield building such as hangars and air traffic control towers. Incidental repair of airfield pavement associated with the facility work may be required, but major airfield pavement scope is generally not included. Scope of work may include landscaping and utilities repair, demolition, or modernization, as needed to provide a complete and useable facility.

d. General Infrastructure includes work associated with (where the preponderance of work includes): Conveyance of utilities within the installation or project site, typically servicing more than one facility. Primary work objectives typically exclude facilities alterations, sustainment, repair, or modernization, except where incidental facility alteration or construction is necessary to accomplish conveyance of the utilities. Types of utilities may include water treatment and distribution, storm water systems, sanitary wastewater collection and treatment, medium and high voltage electrical distribution, natural gas main distribution, petroleum fuel facilities, heating and cooling plants and distribution, communications network distribution, or chilled water distribution, roads and other pavements, utilities, antiterrorism features, landscaping, water storage dams, retaining walls, fencing, barriers, railroads, bridges, waterfront facilities, and sidewalks. Work may include the construction, repair, or alteration of facilities or airfield infrastructure works not associated with General Infrastructure work, such as but not limited to utility connections to facilities or patching of airfield pavement utility cuts.

e. "Relevant Project" is defined as Title I, Title II, and Other A-E services.

f. “Title I Services” include services related to a specific construction project and consist of conducting field surveys and investigations to obtain design data and preparing contract plans, specifications, cost estimates, and estimated construction periods of performance. Title I services may include all aspects of design such as preparation and/or review of contract plans, specifications, design analyses, calculations, scheduling, cost estimates, Building Information Modeling (BIM), design-build conceptual designs, interior design for furniture and equipment, energy modeling and Life Cycle Cost Analyses, seismic retrofit design, building commissioning services and preparation of operations and design manuals. Title I efforts also encompass Other A-E services required to support and develop design work including planning and programming, seismic assessments, program management, project scoping, studies, investigations, evaluations, consultations, interior facility functional/ relational offices compatibility studies, value engineering, topographic survey services, geotechnical services, and hazardous materials assessments.

g. “Title II Services” include services related to a specific construction project and consist of supervision and inspection of construction. Title II services may include all aspects of construction quality assurance and oversight of facility and infrastructure construction/ renovation projects and may include oversight of incidental environmental projects associated with primary requirements.

Title II Services include construction phase credentialed architectural and engineering support services that encompass a full range of expertise and services to include on-site construction oversight assistance, design reviews, quality assurance inspections, adherence to applicable specifications, construction schedule analysis, material submittal reviews, claim reviews, and other standard construction submittal reviews.

h. “Other A-E Services” (as applicable): include design and construction-related services but are not connected with a specific construction project.

These include services of an architectural or engineering nature or services incidental thereto (including studies, investigations, surveying and mapping, tests, evaluations, consultations, comprehensive planning, program management, conceptual designs, plans and specifications, value engineering, construction phase services, soils geotechnical engineering, drawing reviews, preparation of operating and maintenance manuals, development of design criteria, and other related services) that logically or justifiably require performance by registered architects or engineers or their employees. The study and investigation services may include, but are not limited to work necessary to support the completion of Title I design services, including structural engineering forensic analysis, seismic assessments, fire water flow tests, preparation of As-Built drawings, services of consultants, where not specifically applied to the preparation of designs, plans, drawings or specifications, performance of expert witness testimony, Antiterrorism and

Force Protection vulnerability assessments, utilities capacity studies, hazardous materials assessments, topographic, utility and right-of-way surveys, vibration analyses, preparation of models or renderings, geotechnical investigations, roof and envelope assessments, mold studies, and energy studies. The planning and programming support services may include but are not limited to development of comprehensive/master plans, Installation

Development Plans, Area Development Plans, airfield master plans, aviation airspace plans, and aircraft noise studies. Other A-E Services also include support necessary for the Pavement Condition Inspections (PCIs), etc. Other

A-E Services may include incidental testing services such as asphalt mix testing and certification, concrete mix analysis and compressive strength testing, and other materials testing, etc.

i. "Completed projects" are defined as those in which the firm's performance of the task for which it was hired were completed within the past five (5) years or is 80 percent complete for Title I and Other A-E Services, and

50% complete for Title II Services, from the date this synopsis was posted.

Do not list an IDIQ contract as an example of a “completed project”. Instead, list the relevant completed task order(s) or single/standalone contract.

C. SELECTION CRITERIA: SF 330s will be evaluated to determine the “most highly qualified” firms. Evaluating Past Performance may include information provided by the firm, customer inquiries, Government databases, and publicly available sources. Failure to provide requested data, accessible points of contact, or valid phone numbers could result in a firm being considered less qualified. All projects provided in the SF 330 must be completed by the office/branch/individual team member actually performing the work under this contract. Projects not performed by the office/branch/individual team member will be excluded from evaluation consideration. Evaluation Criteria, in relative order of importance to be used for selection of the A-E firms include:

1. Criteria 1: Specialized Experience and Technical Competence

2. Criteria 2: Knowledge of Locality and Location

3. Criteria 3: Past Performance

4. Criteria 4: Capacity to Accomplish the Work

5. Criteria 5: Professional Qualifications

Each Offeror will receive a comprehensive subjective assessment. Using the Selection Criteria above in descending order of importance, the Government will conduct an integrated subjective assessment of each Offeror’s overall evaluation against all other Offerors to determine which

Offerors are the most highly qualified. Offerors that can demonstrate stronger relevant and complete projects will have a higher likelihood of being determined “most highly qualified” than those Offerors that do not. Your response to this synopsis must include your company’s CAGE

Code and Unique Entity ID (UEID).

CRITERION (1) SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE

(SF 330, PART 1, SECTION F)

SUBMISSION REQUIREMENTS: Offerors must submit a minimum of five (5) relevant

A-E projects (see definition for relevant projects above). A maximum of ten (10) relevant

A-E projects may be submitted. Project examples must clearly indicate the type of project submission (i.e. Title I Services, Title II Services). Project examples must demonstrate specialized experience and technical competence with relevant projects. Offerors shall only describe work that has already been performed and must not describe any work that was started more than five (5) years ago (from the date of this synopsis). Only work started within the past five (5) years from the date of this synopsis will be evaluated. Specifically state the month and year EACH type of work was started within the last five (5) years. For the purposes of the time limitation under this factor, “started” means the date of contract/task order award for that specific work.

EVALUATION METHOD: To be acceptable the Offeror must demonstrate relevant and completed projects (see definitions above). However, greater consideration may be given to

Offerors that demonstrate the following:

1. A greater extent and breadth of experience in a variety of relevant projects;

2. Relevant projects on a DoW installation where compliance with United Facilities

Criteria was required;

3. Title II project(s) where the Offeror provided construction phase credentialed architectural and engineering support services;

4. Title I project(s) with greater complexity

CRITERION (2) KNOWLEDGE OF LOCALITY AND LOCATION (SF 330, PART 1,

SECTIONS C & H,)

SUBMISSION REQUIREMENTS: Offerors must submit a logical narrative that demonstrates their firm’s knowledge and familiarity with A-E projects in the Tucson, Arizona locality. Also, firms must provide a map to identify the proximity of their closest established office to Davis-Monthan AFB.

EVALUATION METHOD: The Government will evaluate Offerors on the extent to which they demonstrate knowledge and familiarity with A-E projects in the Tucson, Arizona locality. Greater consideration will be given to Offerors that demonstrate expertise working in the Tucson, AZ geographic area. Evaluation preference will be given to Offerors who have an established office within 150 miles of Davis-Monthan AFB, Tucson AZ.

CRITERION (3) PAST PERFORMANCE (SF 330, PART 1, SECTION H)

SUBMISSION REQUIREMENTS: Offerors must provide current and valid customer points of contact (name, position/role, email, and phone numbers) for each project submitted in Selection

Criterion 1 “Specialized Experience and Technical Competence”. Offerors must also submit

CPARS evaluations or industry equivalent performance documents for each project example submitted in Criterion (1). Firms are encouraged to contact the appropriate government Project

Managers, Contracting Officers, or Contracting Officer's Representatives to ensure CPARS evaluations have been submitted on completed government projects, particularly for those projects submitted under Criterion (1). Interim ratings may be submitted if a final rating has not yet been completed. If no interim rating is available, then submit the latest completed CPARS evaluation. Offerors must include their company CAGE Code and Unique Entity ID (UEID) with their submission.

EVALUATION METHOD: To be acceptable, an Offeror must have achieved a satisfactory or better overall past performance project portfolio rating(s) in CPARS. The

Government may use CPARS evaluations provided in response to this synopsis for each

Criteria 1 project example or for any other project available in CPARS. The Government may also consider information obtained from any other sources deemed necessary by the

Government, for any relevant project (as defined above) completed by the Offeror. This may include contacting the customers submitted with this Criterion. If rating cannot be determined, then the Offeror will be acceptable.

CRITERION (4) CAPACITY TO ACCOMPLISH THE WORK (SF 330, PART II,

Block 11)

SUBMISSION REQUIREMENTS: The Offeror must demonstrate the capacity to accomplish the work by providing the following:

1. Each Prime entity including those Offerors in a Joint Venture must demonstrate each Prime entity’s average annual architect and engineering services capacity in terms of revenue for the past three (3) years.

EVALUATION METHOD: Evaluation will consider the following:

1. To be acceptable each Prime entity must demonstrate an average annual architect and engineering services revenue of $1.5M over the last three (3) years.

CRITERION (5) PROFESSIONAL QUALIFICATIONS (SF 330, PART I,

SECTINONS D & E)

SUBMISSION REQUIREMENTS: The Air Force will consider any information which may be pertinent to this criterion, including the following: proposed key personnel, professional registration, competence, related experiences to accomplish this work, years with the company, and education. Proposed key personnel must be current active “certified payroll” employees of their respective firm (Prime or Teaming Partner). “Contract, zero-hour, and/or consulting” staff will not be considered to meet the current Key Personnel requirement. The combination of criteria below will be used to determine the ability of the staff to contribute to the successful completion of project task orders. An individual may perform more than one role if they hold appropriate qualifications for all roles.

1. Demonstration of professional qualifications in these required key personnel disciplines. Key Personnel must have at least 10 years of design experience in their respective discipline.

2. Experience related to the scope of the IDIQ

3. Professional Registration / Licensing / Certification (state/entity, date of issuance)

4. Years with Company

5. Education

It is expected that these individuals will provide program level quality control and oversight of the task orders resulting from this acquisition. Any changes to the proposed key team members after submission of qualifications MUST be approved by the Contracting Officer.

EVALUATION METHOD: The evaluation will consider

1. The extent and breadth of relevant experience;

2. The extent of relevant professional licenses/certifications;

3. Education/training, and longevity with their firm, for each key person, with more consideration given to key personnel employed by the Prime;

4. The extent of experience on DoW programs related to the scope for this IDIQ;

5. Resumes that include relevant projects submitted in Criterion (1) may be evaluated more favorably; and

6. Resumes submitted where the key person has performed in the role proposed for this contract may also be evaluated more favorably.

ATTACHMENTS:

Attachment 1 – Standard Form 330 (Blank)

Attachment 2 – Request for Qualifications Q&A

INDEFINITE-DELIVERY, INDEFINITE-QUANTITY (IDIQ) CONTRACT FOR ARCHITECT-ENGINEER (A-E) SERVICES FOR TRADITIONAL TITLE I, TITLE II, AND OTHER A-E SERVICES
General Submission Requirements:
B. DESCRIPTION OF WORK.
CRITERION (1) SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE (SF 330, PART 1, SECTION F)
CRITERION (2) KNOWLEDGE OF LOCALITY AND LOCATION (SF 330, PART 1, SECTIONS C & H,)
CRITERION (3) PAST PERFORMANCE (SF 330, PART 1, SECTION H)
CRITERION (4) CAPACITY TO ACCOMPLISH THE WORK (SF 330, PART II, Block 11)
CRITERION (5) PROFESSIONAL QUALIFICATIONS (SF 330, PART I, SECTINONS D & E)
ATTACHMENTS:
Attachment 1 – Standard Form 330 (Blank)
Attachment 2 – Request for Qualifications Q&A

File details come from the government source that posted it. Updated .