Q_A RESPONSES_22QA078.pdf
PDF 129 KB Posted
- Attached to
- Fabric Shelter Preventative Maintenance (PM) Federal contract opportunity
- Solicitation number
- FA487722QA078
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| COMBO_Fabric Shelter PM_R1.pdf | ||
| COMBO_Fabric Shelter PM.pdf | ||
| Attachment 2 - PWS - Fabric Shelter PM.pdf | ||
| Attachment 4 - Labor Rates.pdf | ||
| Attachment 5 - Repair Quote Template.pdf | ||
| Attachment 1 - Pricing Schedule.pdf | ||
| Attachment 3 - Fabric Shelter Pics.pdf | ||
| Attachment 6 - DOL Wage Determinations.pdf | ||
| Attachment 7 - DMAFB Local Policy.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
# Question Answer
Who is the manufacturer of the Shelter Fabric and is there specific model identification of the fabric?
FabricSpan is the vendor that manufactured the fabric material for the 2 LARGE structures. Seaman Corporation is the vendor that manufactured the fabric material for the SMALL structures.
Who is the manufacturer of the tensioning ratchets and is there a specific size or model utilized?
Manufacture: Shelter Structures Part# 5106FE Descriptions: 2” x 06” Endless Ratchet Strap Webbing Strength: 11,000LBS Breaking Strength: 11,900LBS Working Load Limit : 3,667LBS This product meets or exceeds guidelines and standars as published by the Web Sling & Tie Down Assoc. (WSTDA), US Dept. of Transportation (CFR 49), and the Commercial Vehicle Safety Alliance
What is the name of the company who installed the shelters?
Shelter Structures Inc installed the 2 LARGE shelters. Big Top Manufacturing installed the SMALL structures.
Can you verify the quantities below. Item 0002 calls for up to 8 small structures and the rest of the option years are 12 small structures. These will change with option years?
The government would like the flexability to extend the number of structures to 12 for potential future installations.
As we determine the need to exercise the option year, we will validate the number of structures - 8 or 12.
Q & A RESPONSES dated 17 NOV 2021
File details come from the government source that posted it. Updated .