FA487720R0018 - Additional RFIs - 7Jul20.pdf
PDF 50 KB Posted
- Attached to
- FBNV 071475 – Repair Building 136
- Solicitation number
- FA487720R00180006
About this file
This document contains responses to requests for information (RFIs) related to a federal contract opportunity for repair work at Building 136 at an Air Force base. The RFI responses clarify that modifications to the existing fire protection system are required to ensure coverage for a new aircraft, which may involve relocating existing foam generators. However, replacement of the existing fire alarm and mass notification system panel is not necessary. The related federal contract opportunity is for project FBNV 071475 to repair Building 136 and has been extended to a later proposal due date. The work falls under the Department of the Air Force Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA487720R00180006 SF 30.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA487720R0018 – Project FBNV071475 – Bldg 136
RFI’s
1. RFI 44 answer states that the high expansion foam may need to be moved/adjusted to new locations to meet the coverage requirement for the new aircraft. Are we to comply with UFC 4- 211-01 for the fire protection requirements? This will cause the existing high expansion foam system to be obsolete. A new aircraft and a complete redesign will be required to comply with
UFC4-211-01.
Response to RFI 44: Modifications to the existing fire protection system shall be iaw UFC 4-211- 01 and/or ETL 2-15. The intent is not to bring the existing system up to the new criteria/code but to ensure proper suppression coverage for the aircraft. Relocation of existing foam generator(s) is anticipated.
2. We are receiving multiple responses to the design requirements 1.11.4.7. It has been brought to our attention that the DM representative during the site walk stated that no fire alarm work is required under this RFP due to the system being current to base standards. Also paragraph
1.11.4.7 states to replace newer model fire/MNS panel, but does not state that the devices require replacement. The existing fire/MNS devices will have to be replaced if a new fire/MNS panel is installed.
Response to RFI 45: Replacement of the existing FA/MNS panel is not required.