FA4861-10-R-A014-0001.pdf

PDF 39 KB Posted

Attached to
Construct Red Flag Storage and Administrative Facilities
Solicitation number
FA4861-10-R-A014
Issued by

About this file

See attached Amendment 0001.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE SCHEDULE RKMF 08-0016/08-0017

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

AMENDMENT REASON: To replace Wage Determination NV10004 (Bldg) thru Mod 3 w ith revised Wage Determination NV10004 (Bldg) thru Mod 4; and to extend the closing date from 13-SEP-2010 to 16-SEP-2010.

RKMF 08-0016 & RKMF 08-0017, Construct Storage & Admin Facilities, Red Flag POC: TSgt Emily R. Kliolz, 702-652-9337

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Sep-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA4861-10-R-A014

X 9B. DATED (SEE ITEM 11)

13-Aug-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 3 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Sep-2010

CODE

99 CONS/LGCA

5865 SWAAB BLVD, BLDG 588

NELLIS AFB NV 89191-7063

FA4861 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA4861-10-R-A014

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SUMMARY OF CHANGES

SECTION A – SOLICITATION/CONTRACT FORM

The required response date/time has changed from 13-Sep-2010 03:30PM to 16-Sep-2010 03:30PM.

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

REPLACE Attachment #12, Wage Determination NV100004 (Bldg) with attached, revised Wage Determination NV100004 (Bldg) through revision 4. As a result, the Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT

TYPE

DESCRIPTION PAGES DATE

Attachment 01 RKMF 08-0016 Statement of Work, Red Flag Storage Facility 41 24-JUN-2010

Attachment 02 RKMF 08-0017 Statement of Work, Red Flag Admin Facility 41 15-JUN-2010

Attachment 03 Contractor Architect-Engineer Design Requirements 7 02-JUN-2010

Attachment 04 Nellis Design Compatibility Guidelines 110 01-AUG-2006

Attachment 05 UFC 3-580-01, Telecommunications Bldg Cabling Systems 45 22-JUN-2007

Attachment 06 UFC 3-600-01, Fire Protection Engineering for Facilities 129 26-SEP-2006

Attachment 07 UFC 4-010-01, DoD Min Antiterrorism Standards for Bldgs, Ch 1

71 22-JAN-2007

Attachment 08 Sect 27 10 00. Building Telecommunications Cabling System 19 01-MAY-2010

Attachment 09 38 EIG HB 33-01A, Communication & Information, First 400 Feet

81 01-MAY-2005

Attachment 10 ETL 02-12, Comm & Info Sys Criteria for AF Facilities 25 27-JUN-2002

Attachment 11 UCF 4-021-01, Design and O&M: Mass Notification Systems 96 09-APR-2008

Attachment 12 Wage Determination NV10004 (Bldg) thru Mod 3 6 09-JUL-2010

Attachment 13 Financial Information Request & Release Authorization Form 2

Attachment 14 Past/Present Performance Questionnaire 9

Attachment 15 Performance Information Form to:

Exhibit/Attachment Table of Contents

DOCUMENT

TYPE

DESCRIPTION PAGES DATE

Attachment 01 RKMF 08-0016 Statement of Work, Red Flag Storage Facility 41 24-JUN-2010

Attachment 02 RKMF 08-0017 Statement of Work, Red Flag Admin Facility 41 15-JUN-2010

Attachment 03 Contractor Architect-Engineer Design Requirements 7 02-JUN-2010

Attachment 04 Nellis Design Compatibility Guidelines 110 01-AUG-2006

Attachment 05 UFC 3-580-01, Telecommunications Bldg Cabling Systems 45 22-JUN-2007

Attachment 06 UFC 3-600-01, Fire Protection Engineering for Facilities 129 26-SEP-2006

Attachment 07 UFC 4-010-01, DoD Min Antiterrorism Standards for Bldgs, Ch1

71 22-JAN-2007

Attachment 08 Sect 27 10 00. Building Telecommunications Cabling System 19 01-MAY-2010

Attachment 09 38 EIG HB 33-01A, Communication & Information, First 400 Fee

81 01-MAY-2005

Attachment 10 ETL 02-12, Comm & Info Sys Criteria for AF Facilities 25 27-JUN-2002

Attachment 11 UCF 4-021-01, Design and O&M: Mass Notification Systems 96 09-APR-2008

Attachment 12 Wage Determination NV10004 (Bldg) thru Mod 4 6 10-SEP-2010

Attachment 13 Financial Information Request & Release Authorization Form 2

Attachment 14 Past/Present Performance Questionnaire 9

Attachment 15 Performance Information Form

(End of Summary of Changes)

Amendment 0001

ATTACHMENT # 12

Attachment #12

General Decision Number: NV10004 09/10/2010 NV4 Superseded General Decision Number: NV20080004

State: Nevada

Construction Type: Building

Counties: Clark County in Nevada.

EXCLUDES NEVADA TEST SITE (NTS), NATIONAL TEST AND TRAINING

RANGE (NTTR) AND TONOPAH TEST RANGE (TTR)

Modification Number

Publication Date

0 03/12/2010 1 03/19/2010 2 06/04/2010 3 07/09/2010 4 09/10/2010

BRNV0013-004 03/01/2009

Rates Fringes

BRICKLAYER.......................$ 34.02 10.20

BRNV0013-005 03/01/2009

Rates Fringes

TILE FINISHER....................$ 24.04 7.50

BRNV0013-006 03/01/2009

Rates Fringes

MARBLE SETTER....................$ 35.35 9.75

TILE SETTER......................$ 32.92 9.75

CARP1780-002 07/01/2010

Rates Fringes CARPENTER (Including Cabinet making and installation, Accoustical Ceiling Installation, Batt Insulation, Drywall Hanging, Form Work, Hardwood Floor Layer and Metal Stud Installation.).................$ 37.76 11.10

Zone Pay:

0 to 40 miles radius from intersection of Maryland Parkway and Charleston Blvd in Las Vegas: Free Zone 40 to 60 miles radius: $2.50 additional per hour Over 60 miles radius: $4.25 additional per hour Laughlin Area: $2.00 additional per hour

ELEC0357-001 01/01/2010

Rates Fringes

ELECTRICIAN......................$ 39.99 15.12+3%

SOUND AND COMMUNICATION

TECHNICIAN (Alarm installation & Low Voltage Wiring)........................$ 39.64 15.12+3%

ZONE PAY:

(A) Free Zone: The area bound by a 25 mile radius from the intersection of Main Street and Fremont Street in Las Vegas.

(B) Add $2.50 per hour: The area bound by a 25-55 mile radius from the intersection of Main and Fremont Street.

(C) Add $3.50 per hour: The area outside of a 55 mile radius from Main Street and Fremont Street.

* ENGI0012-008 08/01/2010

Rates Fringes OPERATOR: Power Equipment

(03) Skid Loader/Bobcat.........$ 36.16 18.92

(04) Base Roller (Ride Along).....................$ 37.65 18.92

(06) Bulldozer, Forklift and Scraper................$ 37.87 18.92

(08) Mechanic, Paver (Including Asphalt)........$ 37.98 18.92

(10) Grader (Finishing and Non-Finishing)..............$ 38.10 18.92 Add $2.00 per hour to wage rates:

20 miles to 40 miles from the City Hall of Las Vegas Add $3.00 per hour to wage rates:

40 Miles to 60 Miles from the City Hall of Las Vegas Add $3.50 per hour:

Over 60 Miles from the City Hall of Las Vegas

IRON0118-002 07/01/2009

Rates Fringes IRONWORKER (Ornamental, Reinforcing, and Structural)...$ 33.00 23.71

* LABO0872-004 07/01/2009

Rates Fringes

LABORER

(1) Form Stripping.............$ 25.31 17.63

(2) Asphalt Dumpman, Asphalt Shoveler, Cone Setter, Trencher-Hand guided......................$ 25.52 17.63

(3) Concrete Saw, Jackhammer, Mason Tender - Brick, Mason Tender - Cement/Concrete, Pipelayer..$ 25.62 17.63 (3A)Concrete Vibrator...........$ 26.12 17.63

(7) Asbestos Removal (Floor, Wall, Ceiling)......$ 25.62 17.63

(8) Flagger....................$ 26.71 17.63

* LABO0872-005 07/01/2009

Rates Fringes

PLASTER TENDER...................$ 25.62 17.83

PAIN0159-007 07/01/2009

Rates Fringes PAINTER (Including Prep, Brush, Roller, Spray & Drywall Finishing).............$ 34.63 11.87

PAIN2001-001 01/01/2010

Rates Fringes

GLAZIER..........................$ 40.95 16.27

* PLAS0797-001 07/01/2009

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 34.17 12.11

PLASTERER........................$ 32.38 12.31

PLUM0525-001 06/01/2009

Rates Fringes PIPEFITTER, Including HVAC Pipe Installation................$ 38.15 17.56

ZONE PAY:

Zone A (Las Vegas)-No Zone Pay Zone B (NTS)-Add $2.00/hour Zone C (TTR)-Add $2.50/hour

* SHEE0088-003 01/07/2010

Rates Fringes SHEETMETAL WORKER (Including HVAC Duct Installation and Metal Roof)....................$ 43.68 14.84

Zone 1: 0 to 30 miles $0.00 Zone 2: 30 to 50 miles $2.50 Zone 3: 50 to 100 miles (including Laughlin) $3.50 Zone 4: over 100 miles $5.00

* SUNV2007-002 08/01/2007

Rates Fringes LABORER: Common or General......$ 16.49 0.00 LABORER: Landscape..............$ 9.85 0.00 OPERATOR: Backhoe...............$ 16.02 0.00 OPERATOR: Excavator.............$ 17.64 1.45 OPERATOR: Loader................$ 23.62 5.10 OPERATOR: Trencher, Excluding Hand Guided Trencher.$ 27.96 0.00 PLUMBER, Excluding HVAC Pipe.....$ 23.11 0.00 ROOFER, Excluding Metal Roofs....$ 12.73 3.56 SOFT FLOOR LAYER, Includes Carpet & Vinyl.................$ 16.12 1.66 SPRINKLER FITTER (Fire Sprinklers)....................$ 24.38 0.00 TRUCK DRIVER: Dump Truck........$ 16.57 0.00 TRUCK DRIVER: Water Truck.......$ 17.11 2.16

* TEAM0631-003 07/01/2009

Rates Fringes TRUCK DRIVER (Flatbed)...........$ 27.19 18.89

ZONE PAY:

ZONE 1: All work within 30 road miles of City Hall in Las Vegas shall be considerered a Free Zone.

ZONE 2: All work 30 to 50 road miles from City Hall in Las

Vegas shall receive $1.50 additional per hour.

ZONE 3: All work 50 to 70 road miles from City Hall in Las Vegas shall receive $2.50 additional per hour.

ZONE 4: ALL work over 70 road miles from City Hall in Las Vegas shall receive $3.50 additional per hour.

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in he matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and

3.) should be followed. With regard to any other matter not yet ripe for the formal Process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the Interested party's position and by any information (wage payment data, Project description, area practice material, etc.) that the requestor Considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an Interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

File details come from the government source that posted it. Updated .