Bldg 22 Innovation Lab Power Statement of Work.pdf
PDF 679 KB Posted
- Attached to
- Sources Sought - Electrical Upgrade
- Solicitation number
- FA4855EMH001
About this file
This document is a Statement of Work (SOW) for installing power capability in Building 22, Room 5 to support an Innovation Lab and associated equipment at Cannon Air Force Base.
The SOW details the requirements to run power from a 480V electrical panel in Room 33, through multiple walls and rooms to reach the Innovation Lab in Room 5. It specifies the installation of a 480V-to-120/208V transformer, a 200A 120/208V 3-phase power panel, and the necessary disconnects, fuses, outlets, and other electrical components to provide power for the lab equipment. This includes two Stratasys 900 Series 3D printers, two Stratasys 450mc 3D printers, a Despatch drying oven, and an Oryx support cleaning apparatus, along with additional 120V outlets.
The related federal contract opportunity is a Sources Sought announcement (No. FA4855EMH001) for the Electrical Upgrade project, seeking industry input prior to issuing a formal solicitation. No awards will be made from this Sources Sought, and the government will not reimburse respondents for any costs incurred.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Install power capability in Bldg 22 Room 5 to supply Innova�on Lab and all associated equipment.
Run power from GE 480v GE Spectra Series 480V Power Panel Board (Room 33), ~15’ up wall, through 9” cinder block wall, across 47’ bay (Room 36), through 2nd 9” cinder block wall, across 60’ bay (Room 2), through 3rd 9” cinder block wall to desired loca�on (Room 5).
Inside Room 5 install POWERSMITH ULTRA EFFICIENT TRANSFORMER 480V TO 120/208 on Transfer Rack ~10’-12’ above the floor and 200 AMP 120/208 3 PH PANEL WITH MAIN BREAKERS and all associated disconnects, fuses, breakers, switch boxes, outlets, drops, etc. to supply the following equipment located throughout Room 5 (1318 sq �) :
2 ea Stratasys 900 Series Printers: 230 VAC (+/-5%)/3Ph/34 amp 50/60 HZ (fused 40 amps) 2 ea Stratasys 450mc Printers : 208 VAC (+/-10%)/3Ph/18 amp 50/60 HZ (fused 25 amps) Despatch Canister Drying Oven: 208-240 VAC/1Ph/21 amp 50/60 HZ (fused 25 amps) Oryx Support Cleaning Apparatus:208 VAC/1Ph/20 amp 60 HZ with NEMA L6-20P (GFCI) connec�on Other Electric: 120V at least 8 grounded (GFCI) duplex outlets in work space
File details come from the government source that posted it. Updated .