This document is a Q&A related to a Performance Work Statement (PWS) for an Integrated Solid Waste Management (ISWM) contract opportunity. The contractor is responsible for separating and processing recyclables, performing daily maintenance such as cleaning and replacing light bulbs, and providing personal protective equipment for employees. The contractor does not have any responsibilities at the base recycling center, which is run by the Solid Waste/Qualified Recycling Manager.

The solicitation is for a requirement for ISWM services at Cannon Air Force Base, New Mexico. The contract will be a firm fixed-price award with a 10-month base period and four 12-month option periods. It is set aside for 100% Women-Owned Small Businesses under NAICS code 562111 with a $47M size standard. The projected period of performance is July 2024 to April 2029. Proposal responses are due by May 31, 2024, and questions are due by June 11, 2024.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ISWM Contractor’s Q&A

PWS 1.2.3.1 Contractor Responsibilities – Separate and process recyclables in accordance with buyers’ specifications. Perform daily general maintenance such as cleaning and replacing light bulbs and perform recommended maintenance on government furnished equipment. Provide appropriate personal protective equipment for employees.

Q1. Please clarify what duties if any the Contractor has at the Base Recycle Center and what equipment needs to be maintained?

A1. The contractor does not have any responsibilities at the base recycling center. The base recycling center is run by the Solid Waste/ Qualified Recycling Manager. The equipment to be maintained by the contractor is a small list of Government Furnished Property (GFP), found in Appendix C (mainly just park/dog receptacles).

Q2. Is the Contractor required to staff the Base Recycle Center and operate the center?

A2. No, it states in section “1.2 RECYCLABLE MATERIALS PROCESSING The base operates a Qualified Recycling Program (QRP) to reduce the volume of non-hazardous solid waste generated.” The QRP is staffed and operated by the Solid Waste/ Qualified Recycling Manager.

QUESTION:

On page #2 of the Attachment 6 "Instruction to Offerors (SAPR) document”, there are no instructions regarding the submission of a redacted copy of the proposal. Specifically, we need clarification on whether we should attach the required documents as redacted copies along with the redacted proposal volumes.

See Attachment “Instruction to Offerors (SAPR)” document, para I. see sentence which states: “Submit one (1) original electronic copy and one (1) redacted copy.”

QUESTION.:

We would like to confirm the correct format for submitting these documents. Are we supposed to attach the required redacted documents with the redacted proposal volumes in a zipped folder, and the original proposal volumes along with the original required documents separately in another zipped folder?

Sentence 1 Answer.

See Attachment “Instruction to Offerors (SAPR)” document. Refer to para I. sentences which states: “All proposal information shall be submitted in either MS Work or PDF format except for the Price Breakdown (Attachment 3). Pricing information shall be submitted in MS Excel format (Price Breakdown, Attachment 3). Each part shall be submitted as a separately labeled electronic file.”

Sentence 2 Answer.

Submission of proposals is to be directed to the emails provided on the solicitation (refer to para G.) Zipped folder are valid, as necessary. If file exceeds the capacity for email attachment, attachment can be broken down and sent through by parts with multiple emails respectively. Notify ahead of time if using this alternate action.