B71 Design Floor Plan 11x17 (NTS).pdf

PDF 188 KB Posted

Attached to
Building 71 Abatement - Invitation for Bids
Solicitation number
FA485523B0001
Issued by

About this file

This document contains floor plans and designating asbestos abatement areas for Building 71 at Cannon Air Force Base in New Mexico. The plans show the ground level and loft level of the building, noting existing conditions and dimensions to be verified in the field. Key abatement tasks identified include removing vinyl tile flooring and mastic adhesive from designated vault and work areas, cleaning debris from floor ducts, scraping loose paint from walls, pipes and other surfaces throughout the interior and loft and repainting, and wiping down unpainted surfaces. The related federal contract opportunity is a solicitation issued by the Department of the Air Force Special Operations Command seeking abatement services in accordance with the plans.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAFB Bldg. 71 Floor Plan (Ground Level)

Not To Scale Designated Asbestos Abatement Areas

OFFICE AREA NO. 1

VESTIBULE

JANITOR

LOBBY

LOUNGE

OFFICE AREA NO. 2

ATM

WORK AREA

STOR.TOILET

V A

U

LT

TELLER AREA

+/_ 64 s.f.

VAULT 2

+/_ 108 s.f.

MECHANICAL LOFT

+/_ 108 s.f.

CAFB Bldg. 71 Floor Plan (Loft Level)

Not To Scale Designated Asbestos Abatement Areas GENERAL NOTES

A. Drawings illustrate approximate locations and / or dimensions, shall verify existing conditions and dimensions in the field.

C. All asbestos and lead paint removal authorizations to be obtained before any work is started.

D. All work shall be in accordance with local codes.

E. Patch and repair any damage done during the scraping and scaling process.

B. Typical notes and legends on this sheet are applicable to drawings on this sheet only.

KEYNOTES X

1 Remove all vinyl tile floor finishes and scrape all mastic adhesive from concrete slab in hatched vault area.

2 Remove all vinyl tile floor finishes and scrape all mastic adhesive from floor in hatched work area.

3 Clean debris out of all floor ducts throughout the building.

SYMBOLS LEGEND

Area requiring asbestos abatement and / or lead paint remediation / encapsulation.

4 Scrape loose paint from all walls, pipes and other surfaces throughout the building interior (exposed / below dropped ceiling)/ re-paint all surfaces to encapsulate any remaining loose particles.

5 Wipe down / clean all non painted surfaces through the entire building (exposed / below ceiling line) to include equipment, windows, doors, electrical. mechanical and plumbing fixtures, etc.

6 Scrape loose paint at walls, pipes and other surfaces at hatched loft area and repaint all surfaces to encapsulate any remaining loose particles.

S U

B M

IT

T

A L

C A

N N

O N

A F B

N

E W

M E

X

IC

O th

S O

C E

S

D E

P A

R T

M E

N T

O F T

H E

A

IR

F O

R C

E th

S P

E C

IA

L O

P E

R A

T

IO

N S

W

IN

G R e p a ir

B ld g

A b a te m e n t

C a n n o n

A F B

CZQZ 22-0045

A-101

O P

SP

27t h

IA

L

EC

WI

NG

ER

AT

IO

N

AutoCAD SHX Text

SHEET 1 OF 1

AutoCAD SHX Text S:\04_ENGINEERING\04_CENM\06_CENM PROJECT PACKAGE REVIEW\FY23 PROJECTS\22-0045 REPAIR B71 ABATEMENT\APPENDIX A - DRAWINGS AND PHOTOS\B71 FLOOR PLAN 11X17 (NTS).DWG

AutoCAD SHX Text

DRAWING LOCATION:

AutoCAD SHX Text

PLOT DATE:

AutoCAD SHX Text 5/1/23

AutoCAD SHX Text

PLOT SCALE:

AutoCAD SHX Text

1:1 @ ARCH_D

AutoCAD SHX Text

UNCLASSIFIED//FOR OFFICIAL USE ONLY

AutoCAD SHX Text

UNCLASSIFIED//FOR OFFICIAL USE ONLY

AutoCAD SHX Text

SUBMITTAL DATE:

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

DESCRIPTION

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

DATE

AutoCAD SHX Text

PROJECT NUMBER

AutoCAD SHX Text

ENGINEER

AutoCAD SHX Text

DRAFTED BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CEN APPROVED

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

SHEET TITLE

AutoCAD SHX Text

8 MAY 2023

AutoCAD SHX Text

AM

AutoCAD SHX Text ASBESTOS ABATEMENT and LEAD PAINT REMEDIATION PLANS

Sheets and Views
Designated Abatement Areas

File details come from the government source that posted it. Updated .