| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA485521B00030002 SF 30.pdf | ||
| FA485521B0003 Questions and Answers 2.pdf | ||
| Revised SOW CZQZ210023 B4619 for 16th-17th SOS Rev 1.pdf | ||
| Solicitation Amendment FA485521B00030001 SF 30.pdf | ||
| B4619 Site Visit Sign-In Sheet.pdf | ||
| RFI Form.pdf | ||
| Mass Notification UFC requirements.pdf | ||
| AF 3000.pdf | ||
| Architectural Compatibility Guide.pdf | ||
| Contractor Base Briefing Pamphlet.pdf | ||
| 35 Percent Specifications.pdf | ||
| Draft DD 1354.pdf | ||
| Comm Call Out Template.docx | DOCX document | |
| Solicitation - FA485521B0003.pdf | ||
| WD NM20210036.txt | TXT text file | |
| CAFB Comm Labeling Standards 2011.pptx | PPTX presentation | |
| Statement of Work.pdf | ||
| AF 3064 Progress Schedule.xls | XLS spreadsheet | |
| 35 Percent Drawings.pdf | ||
| AF 3065 Progress Report.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Reference Question Answer
1 5..4.c.1.6, 5.4.c.2.4 SOW Will all (8) receptables be fed from (1) new 20 amp circuit? No, you can feed 2 circuits (4 receptables per circuit) Ref UFC 3-520-01 par3-
6.1.2 b 2 5..4.c.1.6, 5.4.c.2.4 SOW What panel will the new circuit be feed from? p2c or dp2 in electrical room Rm220 sheet D-102
3 5..4.c.1.6, 5.4.c.2.4 SOW Is there a spare breaker available to feed this from? Yes
4 5.4.c.1.7, 5.4c.2.3, 5.4.c.4.1 SOW Are these stub-ups into ceiling space only? Yes; no comm cabling or terminations
5 5.4.C.1.8 SOW What panel will new circuits be feed from? The comm room
6 5.4.C.1.8 SOW Are there 2 spare 1-pole, 30 amp breakers available to feed these from? Do not understand the question here
5.4.C.1.8 SOW Will a receptacle be requred or will be hard wired?
Each SIPR connection, i.e. duplex, will need to be on its own dedicated circuit from the COMM room/panel, Rm.219, it will be a plug not hard wired
8 Lighting Liasion office 232: will 4 existing 2X4 fixtures need to be reconfigured to new grid ceiling? yes
9 Lighting Liasion office 232: will 2 relocated and connected to existing lightning swtich leg? yes
10 Lighting Liasion office 232: will motion sensor relocated? yes
11 Lighting Will 2 existing lobby switches need relocated to new wall? yes
12 Lighting Will 2 (2X2) flat panel light fixtures need to be added in new corridor area? yes
13 Lighting will existing exit light need relocated to new corridor area? yes, or as close as possible
14 General will sheet rock need to be removed to receptables, nipr, sipr, 30 amp, dedicated ciruits? Government cannot dictate means and methods for this action
5.4.C.3.1
Install new door between 223/224, will receptacle and NIPR need to be removed or relocated, where the door is being added?
relocated and new location along that wall is to be coordinated with user and or
COR
General
Doors and hardware have been taking 12-14 weeks to deliver after approval. The construction time is only 90 days including submittal review. Will this be taken in to account? This will be taken into consideration after NTP, and before work commences
18 General Can we work in building during normal hours? yes
SOW SOW does not address any work to fire suppression, does this mean heads will not be relocated or added?
Only 1 or 2 sprinkler heads may be affected, and can be relocated, but no additional sprinkler heads
20 General Will just be transitioning to existing flooring at doorways only using a transition strip? Government cannot dictate means and methods for this action
21 General Will walls need to come up to the ceiling? yes
22 General Can elevators be used by contractors? The KTR may use the elevator but they have to protect/cover and leave the elevator the way the found it.