FA485521B0003 Questions and Answers.pdf

PDF 579 KB Posted

Attached to
FA485521B0003, Renovate Building 4619 for the 16th/17th SOS at Cannon Air Force Base (CAFB), New Mexico (NM)
Solicitation number
FA485521B0003
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment FA485521B00030002 SF 30.pdf PDF
FA485521B0003 Questions and Answers 2.pdf PDF
Revised SOW CZQZ210023 B4619 for 16th-17th SOS Rev 1.pdf PDF
Solicitation Amendment FA485521B00030001 SF 30.pdf PDF
B4619 Site Visit Sign-In Sheet.pdf PDF
RFI Form.pdf PDF
Mass Notification UFC requirements.pdf PDF
AF 3000.pdf PDF
Architectural Compatibility Guide.pdf PDF
Contractor Base Briefing Pamphlet.pdf PDF
35 Percent Specifications.pdf PDF
Draft DD 1354.pdf PDF
Comm Call Out Template.docx DOCX document
Solicitation - FA485521B0003.pdf PDF
WD NM20210036.txt TXT text file
CAFB Comm Labeling Standards 2011.pptx PPTX presentation
Statement of Work.pdf PDF
AF 3064 Progress Schedule.xls XLS spreadsheet
35 Percent Drawings.pdf PDF
AF 3065 Progress Report.pdf PDF
Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Reference Question Answer

1 5..4.c.1.6, 5.4.c.2.4 SOW Will all (8) receptables be fed from (1) new 20 amp circuit? No, you can feed 2 circuits (4 receptables per circuit) Ref UFC 3-520-01 par3-

6.1.2 b 2 5..4.c.1.6, 5.4.c.2.4 SOW What panel will the new circuit be feed from? p2c or dp2 in electrical room Rm220 sheet D-102

3 5..4.c.1.6, 5.4.c.2.4 SOW Is there a spare breaker available to feed this from? Yes

4 5.4.c.1.7, 5.4c.2.3, 5.4.c.4.1 SOW Are these stub-ups into ceiling space only? Yes; no comm cabling or terminations

5 5.4.C.1.8 SOW What panel will new circuits be feed from? The comm room

6 5.4.C.1.8 SOW Are there 2 spare 1-pole, 30 amp breakers available to feed these from? Do not understand the question here

5.4.C.1.8 SOW Will a receptacle be requred or will be hard wired?

Each SIPR connection, i.e. duplex, will need to be on its own dedicated circuit from the COMM room/panel, Rm.219, it will be a plug not hard wired

8 Lighting Liasion office 232: will 4 existing 2X4 fixtures need to be reconfigured to new grid ceiling? yes

9 Lighting Liasion office 232: will 2 relocated and connected to existing lightning swtich leg? yes

10 Lighting Liasion office 232: will motion sensor relocated? yes

11 Lighting Will 2 existing lobby switches need relocated to new wall? yes

12 Lighting Will 2 (2X2) flat panel light fixtures need to be added in new corridor area? yes

13 Lighting will existing exit light need relocated to new corridor area? yes, or as close as possible

14 General will sheet rock need to be removed to receptables, nipr, sipr, 30 amp, dedicated ciruits? Government cannot dictate means and methods for this action

5.4.C.3.1

Install new door between 223/224, will receptacle and NIPR need to be removed or relocated, where the door is being added?

relocated and new location along that wall is to be coordinated with user and or

COR

General

Doors and hardware have been taking 12-14 weeks to deliver after approval. The construction time is only 90 days including submittal review. Will this be taken in to account? This will be taken into consideration after NTP, and before work commences

18 General Can we work in building during normal hours? yes

SOW SOW does not address any work to fire suppression, does this mean heads will not be relocated or added?

Only 1 or 2 sprinkler heads may be affected, and can be relocated, but no additional sprinkler heads

20 General Will just be transitioning to existing flooring at doorways only using a transition strip? Government cannot dictate means and methods for this action

21 General Will walls need to come up to the ceiling? yes

22 General Can elevators be used by contractors? The KTR may use the elevator but they have to protect/cover and leave the elevator the way the found it.