Update 3 ALS Carpet Statement of Work.pdf
PDF 303 KB Posted
- Attached to
- ALS Carpet
- Solicitation number
- FA483025Q0045
About this file
This Statement of Work details a carpet replacement project for Building 1216, Airman Leadership School at Moody AFB, Georgia. The project requires removing existing carpet and installing new modular carpet tiles from one of seven approved vendors (Mohawk, Engineered Floors, Interface Americas, Mannington, Tarkett, Milliken, or Bentley Mills), with specific tile selections and contract numbers provided. The contractor must move furniture, remove existing carpet and base, install new carpet tiles, rubber cove base, and door transitions, and comply with the Air Force Carpet Program guidelines.
Key requirements include performing work outside normal duty hours, completing the project within 90 days of contract award, and following strict installation and safety standards. The solicitation offers optional quotes for additional classrooms and back offices/auditorium. The contractor must be certified floor covering installers, provide physical samples prior to installation, submit manufacturer's technical data, ensure proper furniture handling, clean the work area, and provide a one-year workmanship warranty. The project is being conducted by the 23rd Contracting Squadron at Moody Air Force Base, with a site visit scheduled and specific technical and performance specifications outlined in detail.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Carpet Replacement
Building 1216 Airman Leadership School
Moody AFB, Georgia
GENERAL:
The contractor shall provide all personnel, equipment, tools, supplies, materials, supervision, and transportation necessary to:
1. Move furniture and return to exact location.
2. Remove and dispose of indicated existing carpet.
3. Remove indicated portions of existing base from wall and columns.
4. Furnish and install new carpet, rubber cove base, and door transitions.
5. Contractor shall verify all dimensions during site visit.
6. Contractor shall submit physical samples of carpet, transitions, and cove base to customer prior to installation.
PERFORMANCE REQUIREMENTS:
Air Force Carpet Program: As of 18 January 2023, carpet installation shall be accomplished in accordance with the Air Force Carpet Program, using the carpet ordering guide and one of the seven contracts awarded for materials. The Air Force Carpet Program includes modular carpet tiles, roll goods, walk-off tiles, and adhesives. Installation will be managed by local installers.
Measurements: The contractor shall be responsible for measuring and verifying the area and perimeter of all spaces receiving carpet, cove base and door transitions.
Product Data: Submit two copies of manufacture’s full technical data and installation instructions for each type of carpet and accessory. Contractor shall submit physical samples to customer prior to installation.
1. The contractor shall move furniture as necessary to remove and install carpet. Furniture shall be returned to the exact location it was moved from.
2. The contractor shall choose one of the vendors to work with and install the carpet selections below in the locations indicated.
Tier 1 C – Type Contracts
Carpet Selection Contract Number
Mohawk 2OCR-T: DATUM 7559 OPAL: 24X24 FA800322R003 Engineered Floors 2OM-T: TWILL WEAVE MODULAR 2883 CORDED: 24X24 FA800323C0004
Interface Americas 3OL-T: BRESCIA 8867 AZZURO: 19.69X19.69 FA800323C0005 Mannington HUSKT/HUSKB: HUSK 35342 WOAD: 24X24 FA800322R0003 Tarkett OS-T/3OS-P: EARTHBOUND 11573: INKY MIDNIGHT 52610 FA800323C0007 Milliken 1OCR-T: FORMWORK MODULAR: FWK52 BLUERINT FA800323C0008 Bentley Mills 3OCR-T: 6ASET4AA1K: SHAPESHIFTER II FA800323C0009
3. Cove base and Rubber Stair Nosing: Install resilient rubber cove base, (1/8” thick, 6” high, Flexco, or approved equal) in areas where carpet is being installed to replace all existing base removed. Rubber stair nosing in auditorium is also to be replaced. Color to be determined.
4. Transitions: The contractor shall install transitions in areas where there is a change in floor type or carpet height. This includes the transitions to the outdoor areas. Transitions shall match or compliment cove base. Color to be determined.
Removal and Disposal:
1. Carpet: The contractor shall remove and dispose of carpet indicated on floor plans without disturbing the flooring underneath. Contractor shall lay carpet over the existing tile floor.
2. Cove Base, Rubber Nosing and Transitions: The contractor shall dispose of a current base from walls and columns and remove existing transitions and rubber nosing on stairs in auditorium.
3. Disposal: The contractor is responsible for providing a dumpster at the worksite prior to starting the carpet installation and removing it after completion.
Installation: Contracting Qualifications: All work shall be performed be contractors/installers who are Certified Floor covering Installers (International Certified Floor covering Installer Association) or manufacture’s approved installers. Foreman on the jobsite shall be “Certified C-II Minimum.” For warranties to be valid, all carpet shall be installed in accordance with the installation guidelines set forth by the manufacturer and/or the minimum guidelines set forth in CRI 104-2002, Standard for Installation Specification of Commercial Carpet, and CRI 105-2002, Standard for Installation of Residential Carpet.
1. Carpet: The contractor shall work with one of the vendors listed under General Information and install the carpet choices in the areas indicated. Carpet shall be installed in full accordance with manufacturer’s recommendations to preserve all warranties.
2. Cove Base: The contractor shall install resilient rubber cove base in areas where carpet is being replaced/installed. (1/8” thick, 6” high, Flexco, or approved equal. Color: to be determined).
Purchase and install approximately 400 linear feet of vinyl cove base. All outside corners will be factory made outside corner pieces. Color of the vinyl baseboards will be either, approved by requester prior to vendor purchase. Rubber or synthetic entry thresholds will be replaced with new material. Metal or wooden thresholds will be removed and/or replaced as necessary. The Contractor shall verify all dimensions listed above. The Government does not guarantee the above dimensions are 100% accurate.
3. Transitions: The contractor shall install transitions in areas where there is a change in floor type. Transitions shall match or compliment cove base. Color to be determined but needs to compliment the Cove Base.
4. Additional Material: The contractor shall provide 5% of extra tiles above the amount installed. These will be given to the customer.
General Information: Carpet criteria shall comply with the Air Force Carpet Program:
https://usaf.dps.mil/sites/aficc/afcc/AFICC/AFFCC/SiteCollectionDocuments/Carpet/CarpetHomePa ge.aspx?PageView=Shared&InitialTabId=Ribbon.WebPartPage&VisibilityContext=WSSWebPartPa
1611973094A Highlight
1611973094A Highlight
1611973094A Highlight
1611973094A Highlight
1611973094A Highlight
1611973094A Highlight
1611973094A Highlight ge%20&siteid={448B9DA1-D83A-4721-8055-45432E36427C}&webid={519EE7F0-0F21-43A9- BD58-A0B7B620A749}&uniqueid={95848866-B5AB-4423-8FA8-2DA9E6AD28CB}
Company Website/Email Contact Information Mohawk Mohawkgroup.com 800-554-6637
Engineered Floors https://www.engineeredfloors.com/ 800-706-9745 Interface Americas https://www.interface.com/US/enͲUS/homepage 800-634-6032
Mannington Manningtoncommercial.com 800-241-2262 Tarkett www.tarkettna.com 800.899.8916
Milliken https://www.milliken.com/en-us/businesses/floor-covering/segments/government 202-480-6461
Bentley Mills Mindy.dever@bentleymills.com 859-536-7846
Performance Period: Shall not exceed 90 days from date of contract award.
Work Schedule/Hours/Plans: Workdays for this contract will be outside of normal duty hours (Monday -Friday, 7:30 am to 5:00 pm) and will be on weekends or a holiday. Due to Building 1216 having occupants. The contractor shall not begin any work until 100% material complete. Written permission from the designated Government Representative (SSgt Brandon Thompson) shall be obtained before making any deviation from the schedule. The contractor shall provide a detailed work schedule to the government representative at least 24 hours in advance, outlining the specific work to be performed, the location, and the expected duration. The government representative shall review and approve the work schedule, ensuring that they are available to be present during the work. In the event of any changes to the work schedule, the contractor shall notify the government representative as soon as possible, and obtain their approval before proceeding.
Vacating Rooms: Furniture shall be moved and returned to its exact location after installation is complete. The government representative shall identify any sensitive or fragile items that require special handling or care and provide guidance to the contractor on how to handle these items. The contractor shall take reasonable care to protect the furniture and other items during the movement process and shall be responsible for any damage or loss caused by their negligence or mishandling.
Doors: After carpet installation is complete, the contractor shall ensure that all doors affected by the project can open and close properly.
Cleaning: After carpet installation is complete and prior to returning furniture to its original location, the contractor shall remove all debris, scraps, and any other foreign matter. Contractor shall remove any spots or adhesive from the carpet or adjoining surfaces, to include walls, clip any protruding face yard and vacuum the entire work area.
Safety Requirements: Safety requirement shall be the applicable sections of EM 385-1-1, 30 November 2014 and Occupational Safety and Health Administration (OSHA) regulations. OSHA regulations are available for review at the Base Safety Office, Building 105. EM 385-1-1 is available for reference in the Civil Engineering Office, Building 918. The contractor shall ensure that any lifting devices or ladders meet all applicable safety standards. The contractor shall be required to use those lifting devices that will allow for the existing modular systems furniture to be raised for the installation of the new materials requested. The contractor will not be required to disconnect any electrical system connections to or from the modular systems furniture.
Site Visit: A site visit will be offered pursuant to Federal Acquisition Regulation (FAR) Clause 52.237-1. Regardless of site visit attendance, contractors acknowledge satisfaction as to the nature http://www.engineeredfloors.com/ http://www.interface.com/US/en%CD%B2US/homepage http://www.tarkettna.com/ http://www.milliken.com/en-mailto:Mindy.dever@bentleymills.com and location of the work, the general and local conditions, access to job site; disposal, handling and storage of materials; availability of labor, water, electric power or similar physical conditions at Moody Air Force Base; the character of equipment and facilities needed preliminary to and during the performance of the work; and all other matters that can in any way affect the work or costs related to this requirement upon submission of offers. Contractors further acknowledge that any damage to the existing structure in and around facilities will be returned to existing condition prior to the completion of subject work at no additional cost to the Government in accordance with FAR Clause 52.237-2. The contractor shall provide the Government with a one-year warranty on workmanship. The contractor shall provide any manufacturer’s warranty to the Government.
Option of Additional Classrooms: Please submit quotes for the main carpet area and a separate quote (or separate the line items) for the two additional classrooms shown in blue on the Updated ALS Carpet Replacement Area Document. The additional classrooms will have the same carpet selection and work hours/terms specified on this document.
Option of Auditorium/Back Offices: Please submit quotes for the main carpet area and a separate quote (or separate the line items) for the areas shown in yellow on the Updated ALS Carpet Replacement Area Document. The additional rooms will have the same carpet selection and work hours/terms specified on this document.
1611973094A Highlight
1611973094A Highlight
| GENERAL: |
| 5. Contractor shall verify all dimensions during site visit. |
| PERFORMANCE REQUIREMENTS: |
| Removal and Disposal: |
| Untitled |
| Untitled |
File details come from the government source that posted it. Updated .