A4_-_Bid_Schedule_(amend_1).pdf

PDF 17 KB Posted

Attached to
Maintain Airfield Surface/Markings at Moody AFB, GA and Restripe APAFR Airfield at Avon Park, FL
Solicitation number
FA4830-16-B-0001
Issued by

About this file

Attachment 4 - Bid Schedule (Amendment 1 Changes)

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

MOODY AFB, GA

CLIN 0001

PROJECT NO. ASPR 16-0112

PROJECT NAME: MTN AIRFIELD RUBBER REMOVAL AND SURFACES/MARKINGS

ITEM DESCRIPTION EST. QUANT. UNIT PRICE TOTAL COST

1. Provide all labor, supervision, 480,000 SF $ $ material & equipment to remove rubber 2000 FT by 60 FT on outside runway and inside runway both ends.

2. Paint and apply beads, 195,586 SF $ $ pavement marking, white (reflective)

3. Paint and apply pavement 96,663 SF $ $ marking, yellow reflective

4. Paint and apply pavement 12,000 SF $ $ marking, yellow (non-reflective)

5. Paint pavement marking, 99,237 SF $ $ black (non-reflective)

6. Remove paint 13,110 SF $ $

7. Paint pavement marking, red 5,320 SF $ $

8. Cop Signs 136 EA $ $

9. Stop bars midfield 10 EA $ $ rd/STOP FOD CHECK

10. VFR hold lines 17 EA $ $

11. Aircraft Traffic Interruption 1 LS $ $

TOTAL COST $

BID SCHEDULE

AVON PARK, FL

CLIN 0002

PROJECT NO. ASPR 16-0112

PROJECT NAME: MTN AIRFIELD RUBBER REMOVAL AND SURFACES/MARKINGS

ITEM DESCRIPTION EST. QUANT. UNIT PRICE TOTAL COST

1. Paint and apply Beads, 73,126 SF $ $ Pavement Marking, White (reflective)

2. Paint and Apply Beads, 17,241.5 SF $ $ Pavement Marking, Yellow (reflective)

3. Paint and apply Beads, 12,480 SF $ $ Pavement Marking, Yellow (non-reflective)

4. Paint Pavement Marking, 34,927 SF $ $ Black (non-reflective)

TOTAL COST $

BID SCHEDULE (MOODY)
BID SCHEDULE (AVON)

File details come from the government source that posted it. Updated .