Copy of Questions_Repair Roads - Answered.xlsx
XLSX spreadsheet 17 KB Posted
- Attached to
- Repair Roads for Rebuild
- Solicitation number
- FA481922R0012
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attch 9 AF 3065.pdf | ||
| Attch 3 Base Access Request EAL.xlsx | XLSX spreadsheet | |
| Attch 6 Other Contract Requirements.pdf | ||
| Attch 5 Wage Determination FL 20220158.pdf | ||
| Solicitation - FA481922R0012.pdf | ||
| Attch 4 AF Form 66.pdf | ||
| Attch 1 RFP_SOW_13APR22.pdf | ||
| Attch 10 Sample RFI.PDF | ||
| Attch 7 AF Form 3000.pdf | ||
| Attch 2 APPENDIX A_Maps and Drawings_13APR22.pdf | ||
| Attch 8 AF 3064.pdf | ||
| Attch 12 Division Cost Estimate Worksheet.xlsx | XLSX spreadsheet | |
| Attch 11 Proof of Financial Responsibility.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Question Owner | Question | Answer |
| 325 CES | Are your Phasing plans Solidified? Doing it this way will increase mobilizations and ultimatelydrive costs up. | All facilities affected by project will remain operational and as such contractor must maintain access. The contractor is to determine best way to meet this requirement. |
| 325 CES | Will alternate Base Course materials be acceptable? Limerock is very limited right now. Would crushed Concrete be acceptable. | Alternative base material has been accepted on other projects. Contractor will be required to supply documentation that alternative material will meet the government's compaction requirements along with follow up testing for verification |
| 325 CES | Are there any obstructions that will remain in place during the work? | No |
| 325 CES | SOW states to replace striping with like material, but some places have paint on top of thermoplastic. Please specificy which will be required. | Thermoplastic paint |