Question OwnerQuestionAnswer
325 CESAre your Phasing plans Solidified? Doing it this way will increase mobilizations and ultimatelydrive costs up.All facilities affected by project will remain operational and as such contractor must maintain access. The contractor is to determine best way to meet this requirement.
325 CESWill alternate Base Course materials be acceptable? Limerock is very limited right now. Would crushed Concrete be acceptable.Alternative base material has been accepted on other projects. Contractor will be required to supply documentation that alternative material will meet the government's compaction requirements along with follow up testing for verification
325 CESAre there any obstructions that will remain in place during the work?No
325 CESSOW states to replace striping with like material, but some places have paint on top of thermoplastic. Please specificy which will be required.Thermoplastic paint