Attachment_3_Pricing_Schedule.pdf
PDF 349 KB Posted
- Attached to
- Tower Foundation Federal contract opportunity
- Solicitation number
- FA4819-18-Q-7002
About this file
Attachment 3 Pricing Schedule
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA4819-18-Q-7002_-_TRSS_Tower_Foundation.pdf | ||
| Attachment_4_Wage_Determination.pdf | ||
| Attachment_1_Statement_of_Work_(SOW).pdf | ||
| Attachment_2_SOW_Appendix_A.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
325TH FIGHTER WING (ACC)
TYNDALL AIR FORCE BASE FLORIDA
XLWU 18-1008
CONSTRUCT FOUNDATION IN SUPPORT OF
TRSS TOWER, B503
SOW APPENDIX B:
BID SCHEDULE
CONTRACTOR BID SCHEDULE CLIN 1
XLWU 18-1008 - Construct Foundation in Support of TRSS Tower, B503 Date:_____________________________
Note: Provide additional pages as needed Bid Schedule
Contractor Estimated Period of Performance: Days
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Mobilization/Demobilization JOB -$
002 Equipment Rental WEEK -$
003 Superintendence DAY -$
004 -$
005 -$
006 -$
007 -$
008 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Site / Utility Verification JOB -$
002 Drilled Piers LF -$
003 Material Testing - Concrete JOB -$
004 Site Restoration SY -$
005 Disposal WEEK -$
006 -$
007 -$
008 -$
009 -$
010 -$
011 -$
012 -$
013 -$
SUB TOT
LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes
001 Overhead -$
002 Profit -$
003 Bond -$
All cost associated with providing and installing the complete drilled pier foundation in accordance with the Construction documents. This line item will include items such as; rebar, cage spacers, and anchor bolt install (materials provided by Gov).
2.3.1 (a.) CONSTRUCTION
DESCRIPTION
All cost associated with material testing for compliance verification of installed concrete in accordance with the construction documents
All cost associated with clean up, restoration and stablization of the site.
All cost associated with the disposal of construction waste and excess materials.
All costs associated with verification of site conditions and utility location verification.
Overhead Costs
Profit
Actual Bond
PROJECT TOTAL ESTIMATE =
PROJECT SUBTOTAL =
2.3.1 OVERHEAD, PROFIT, BOND
DESCRIPTION
2.3.1 GENERAL CONDITIONS
DESCRIPTION
A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.
2.3.1 TASK 1 - CONSTRUCT TOWER FOUNDATION
All costs associated with equipment rental to accomplish the work. Contractor to provide itemized list of equipment and associated cost.
All costs associated with providing oversite during the performance of on site activities; demolition, construction.
CONTRACTOR BID SCHEDULE CLIN 1
ITEMIZED LIST AND NOTES
XLWU 18-1008 - Construct Foundation in Support of TRSS Tower, B503 Date: ___________________
Note: Provide additional pages as needed Bid Schedule
2.3.1 EQUIPMENT RENTAL ( ITEMIZED LIST ) $0.00
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
OTHER PROJECT NOTES FOR BID $0.00
UNIT QUANTITY QUANTITY UNIT COST TOTAL
ex. MONTH 1 1 2,180.00 2,180.00$
1 -$
2 -$
3 -$
4 -$
5 -$
6 -$
7 -$
8 -$
9 -$
10 -$
11 -$
12 -$
13 -$
14 -$
15 -$
16 -$
17 -$
18 -$
19 -$
20 -$
2.3.1 TASK 1 - CONSTRUCT TOWER FOUNDATION
SUB TOT
RENTAL DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
SUB TOT
DESCRIPTION
(Example) 40' Straight Boom Manlift (Sunbelt Rentals)
| BID SCHED TASK 1 E&W Walls |
| BID SCHED TASK 2 Stair |
| BID SCHED TASK 3 F&R Fascia |
| BID SCHED TASK 4 F&R Veneer |
| BID.pdf |
| BID SCHED TASK 1 E&W Walls |
| T1 |
| BID SCHED TASK 2 Stair |
| T2 |
| BID SCHED TASK 3 F&R Fascia |
| T3 |
| BID SCHED TASK 4 F&R Veneer |
| T4 |
| IGE_18-.pdf |
| T1 |
| Bid Shed.pdf |
| BID SCHED TASK 1 |
| T1 |
| Bid.pdf |
| BID SCHED TASK 1 |
| T1 |
File details come from the government source that posted it.