Attachment_3_Pricing_Schedule.pdf

PDF 349 KB Posted

Attached to
Tower Foundation Federal contract opportunity
Solicitation number
FA4819-18-Q-7002
Issued by
Department of the Air Force Air Combat Command

About this file

Attachment 3 Pricing Schedule

View the file

Other files for this federal contract opportunity

Other files attached to Tower Foundation, newest first.
File Type Posted
FA4819-18-Q-7002_-_TRSS_Tower_Foundation.pdf PDF
Attachment_4_Wage_Determination.pdf PDF
Attachment_1_Statement_of_Work_(SOW).pdf PDF
Attachment_2_SOW_Appendix_A.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

325TH FIGHTER WING (ACC)

TYNDALL AIR FORCE BASE FLORIDA

XLWU 18-1008

CONSTRUCT FOUNDATION IN SUPPORT OF

TRSS TOWER, B503

SOW APPENDIX B:

BID SCHEDULE

CONTRACTOR BID SCHEDULE CLIN 1

XLWU 18-1008 - Construct Foundation in Support of TRSS Tower, B503 Date:_____________________________

Note: Provide additional pages as needed Bid Schedule

Contractor Estimated Period of Performance: Days

SUB TOT

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

001 Mobilization/Demobilization JOB -$

002 Equipment Rental WEEK -$

003 Superintendence DAY -$

004 -$

005 -$

006 -$

007 -$

008 -$

SUB TOT

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

001 Site / Utility Verification JOB -$

002 Drilled Piers LF -$

003 Material Testing - Concrete JOB -$

004 Site Restoration SY -$

005 Disposal WEEK -$

006 -$

007 -$

008 -$

009 -$

010 -$

011 -$

012 -$

013 -$

SUB TOT

LINE ITEM UNIT QUANTITY UNIT COST TOTAL Notes

001 Overhead -$

002 Profit -$

003 Bond -$

All cost associated with providing and installing the complete drilled pier foundation in accordance with the Construction documents. This line item will include items such as; rebar, cage spacers, and anchor bolt install (materials provided by Gov).

2.3.1 (a.) CONSTRUCTION

DESCRIPTION

All cost associated with material testing for compliance verification of installed concrete in accordance with the construction documents

All cost associated with clean up, restoration and stablization of the site.

All cost associated with the disposal of construction waste and excess materials.

All costs associated with verification of site conditions and utility location verification.

Overhead Costs

Profit

Actual Bond

PROJECT TOTAL ESTIMATE =

PROJECT SUBTOTAL =

2.3.1 OVERHEAD, PROFIT, BOND

DESCRIPTION

2.3.1 GENERAL CONDITIONS

DESCRIPTION

A mobilization cost will be given in order to get the contractor set up on Tyndall AFB. This shall include, but may not be limited to the fees associated in moving equipment, material, and personnel to this area.

2.3.1 TASK 1 - CONSTRUCT TOWER FOUNDATION

All costs associated with equipment rental to accomplish the work. Contractor to provide itemized list of equipment and associated cost.

All costs associated with providing oversite during the performance of on site activities; demolition, construction.

CONTRACTOR BID SCHEDULE CLIN 1

ITEMIZED LIST AND NOTES

XLWU 18-1008 - Construct Foundation in Support of TRSS Tower, B503 Date: ___________________

Note: Provide additional pages as needed Bid Schedule

2.3.1 EQUIPMENT RENTAL ( ITEMIZED LIST ) $0.00

UNIT QUANTITY QUANTITY UNIT COST TOTAL

ex. MONTH 1 1 2,180.00 2,180.00$

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 -$

17 -$

18 -$

19 -$

20 -$

OTHER PROJECT NOTES FOR BID $0.00

UNIT QUANTITY QUANTITY UNIT COST TOTAL

ex. MONTH 1 1 2,180.00 2,180.00$

1 -$

2 -$

3 -$

4 -$

5 -$

6 -$

7 -$

8 -$

9 -$

10 -$

11 -$

12 -$

13 -$

14 -$

15 -$

16 -$

17 -$

18 -$

19 -$

20 -$

2.3.1 TASK 1 - CONSTRUCT TOWER FOUNDATION

SUB TOT

RENTAL DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

SUB TOT

DESCRIPTION

(Example) 40' Straight Boom Manlift (Sunbelt Rentals)

BID SCHED TASK 1 E&W Walls
BID SCHED TASK 2 Stair
BID SCHED TASK 3 F&R Fascia
BID SCHED TASK 4 F&R Veneer
BID.pdf
BID SCHED TASK 1 E&W Walls
T1
BID SCHED TASK 2 Stair
T2
BID SCHED TASK 3 F&R Fascia
T3
BID SCHED TASK 4 F&R Veneer
T4
IGE_18-.pdf
T1
Bid Shed.pdf
BID SCHED TASK 1
T1
Bid.pdf
BID SCHED TASK 1
T1

File details come from the government source that posted it.