Attch_2_-_Seed_Project_SOW.pdf

PDF 150 KB Posted

Attached to
Flooring Federal contract opportunity
Solicitation number
FA4814-16-R-0002
Issued by
Department of the Air Force Air Mobility Command

About this file

Attachment 2 - Seed Project Statement of Work (SOW)

View the file

Other files for this federal contract opportunity

Other files attached to Flooring, newest first.
File Type Posted
FA4814-16-R-0002.pdf PDF
Attch_2_-_Seed_Project_SOW.pdf PDF
Attch_1_-_Price_Schedule_Final.xlsx XLSX spreadsheet
FA4814-16-R-0002.pdf PDF
Attch_3_-_Seed_Project_Price_Schedule.xlsx XLSX spreadsheet
Attch_3_-_Seed_Project_Price_Schedule.xlsx XLSX spreadsheet
FA4814-16-R-0002.pdf PDF
Attch_1_-_Price_Schedule_Final.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

B501 Carpet Tile Installation

1 OCT 2015

1. SCOPE OF WORK

The work will include providing all necessary labor, equipment, transportation, materials, and support accessories, to remove existing glue down carpet, transitions. Prep floor move/lift furniture. Furnish and Install carpet tile.

2. DEMOLITION

The contractor shall demo existing glue down carpet, all transitions. All building material shall be disposed off MacDill AFB.

3. FLOOR PREPARATION

Anything other than mechanical removal of flooring material and non-water base adhesives and any additional floor preparation that may be required as a result of unforeseen conditions shall be brought to the attention to the Contracting Officer

Representative (COR).

4. ASBESTOS ABATEMENT

Should the Contractor encounter Asbestos Containing Material (ACM) which must be disturbed, the Contractor shall cease all work that would disturb the ACM and shall immediately notify the COR.

5. SITE MAINTENANCE AND CLEANUP

a. SITE MAINTENANCE – The Contractor shall protect adjacent property, building, and their contents from dust, dirt, or other materials.

b. CLEANUP – Daily, the Contractor shall collect all trash, debris, refuse, garbage, etc., which is generated and place it in the appropriate containers with lids or approved covers.

6. LOCATION OF WORK

Work is located at building 501 Command Section Rooms, 2130, 2135, 2139, 2141, and

2142.

7. PERIOD OF PERFORMANCE

The Contractor has 30 days from notice to proceed to complete work to include final cleanup of the premises.