Atch_4_Drawing.pdf
PDF 109 KB Posted
- Attached to
- Concrete Target Blocks Federal contract opportunity
- Solicitation number
- FA4814-15-T-F020
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch_2_Specification_7_September.pdf | ||
| Atch_1_RFQ_Target_Blocks.pdf | ||
| Atch_3_DFARS_252.209-7999.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1.1
PLAN
C O
N C
R E
T E
L
E G
O
B
L O
C K
W
I T
H
R E
C E
S S
E D
L
I F
T I N
G
E
Y E
S
A
N D
S L
O T
S
F
O R
F
O R
K L
I F
T
Appendix A
A
8"
8"
2"
16"
#4 REBAR
#4 REBAR
#4 REBAR
#4 REBAR
T
Y
P
OPEN FOR LIFTING
CONCRETE LEGO BLOCK WITH LIFTING RINGS
SIDE
TOP
END
2'-0"
E
#4 REBAR
LIFTING RING END VIEW
LIFTING RING TOP VIEW
LIFTING RING SIDE VIEW
#4 REBAR
.5
TYP.
TYPE 5FT
10FT
A 5'
10'
B 2'-6" 5'-0"
DIMENSIONS
3" MIN.
CLR.
TYP.
FORKLIFT
SLOTS, 2 EACH
PER BLOCK
FORKLIFT
SLOTS, 2 EACH
PER BLOCK
FORKLIFT
SLOTS, 2 EACH
PER BLOCK
FORKLIFT
SLOTS, 2 EACH
PER BLOCK
B
TYP.
ASRC PRIMUS
28 SOUTH BLVD.
AVON PARK
AIR FORCE RANGE
AVON PARK
FLORIDA, 33825
PHONE: 863-452-4155
FAX: 863-452-4219
FORKLIFT
SLOTS, 2 EACH
PER BLOCK
TYP.
TYP.
TYP.
TYP.
TYP.
M I N
TYP.
TYP.
MIN.
M I N
M I N
MIN.
C
TYP.
D
C
D
TYP.
C 1'-6"
D 1'-6"
E 3'-0"
B
1'-0"
TYP.
T Y
P
NOTES:
1. CONCRETE BLOCK AS DEPICTED IN THIS PLAN
SHALL BE CONSTRUCTED OF 3000 PSI
CONCRETE.
2. CONTRACTOR SHALL FABRICATE BLOCKS TO;
-10 FEET LONG, 30 INCHES HIGH, AND 24
INCHES WIDE.
- 5 FEET LONG, 30 INCHES HIGH, AND 24
INCHES WIDE.
(SEE STATEMENT OF WORK FOR QUANTITIES).
3. PROVIDE ONE POUND / CUBIC YARD OF NICON
FIBER MESH OR EQUIVALENT.
4. EACH BLOCK SHALL HAVE 3.5"X12" FORK LIFT
SLOTS.
5. CONTRACTOR SHALL BE RESPONSIBLE TO
PROVIDE ALL LABOR, MATERIALS AND
EQUIPMENT NECESSARY TO FABRICATE,
DELIVER, UNLOAD AND STACK THE CURED
BLOCKS UNDAMAGED AT FOXTROT RANGE
HOLDING AREA. BLOCKS SHALL BE NEATLY
STACKED AND REMAIN UNBROKEN. THE
HOLDING AREA AT FOXTROT IS NATURAL
TERRAIN. PRIME CONTRACTOR IS RESPONSIBLE
FOR ANY SUBCONTRACTED WORK AND
DELIVERIES.
6. CONTRACTOR MAY PERFORM FABRICATION ON
BASE AT THE CONCRETED TARGET AREA. THE
FINISHED CURED BLOCKS WILL THEN BE
DELIVERED TO OBSERVATION POINT 1(OP1) AT
FOXTROT RANGE WHICH REQUIRES TRANSPORT
APPROXIMATELY 9 MILES OVER SEMI-IMPROVED
DIRT ROADS. ALL ENTRIES TO THE TARGET
HOLDING AREA MUST BE DURING NORMAL
WORKING HOURS, MONDAY THROUGH FRIDAY
0730 -1600 LOCAL. ALL DELIVERIES TO OP1 MUST
BE PERFORMED AROUND THE OPERATIONAL
SCHEDULE AND WILL BE COORDINATED WITH
RANGE OPERATIONS.
7. CONTRACTOR WILL BE RESPONSIBLE FOR
CONTAINING ANY RUBBISH/WASTE GENERATED
BY THE WORK FORCE, WORK PROCESSES OR
MATERIAL DELIVERY AT THE END OF EACH DAY.
THE CONTRACTOR SHALL REMOVE ALL
CONTRACTOR-GENERATED RUBBISH BY THE
END OF THE CONTRACT PERIOD.
File details come from the government source that posted it. Updated .