This document is a Statement of Work (SOW) for a Vindicator Alarm System installation at Seymour Johnson Air Force Base for the 4th Communications Squadron. The project requires the contractor to provide and install a comprehensive security system consisting of 4 access control doors and 7 motion sensors, with authentication capabilities including CAC, HID, and PIN methods. The system will be installed in Building 2641, with specific requirements to ensure operational functionality, proper device calibration, and comprehensive testing.
The SOW details comprehensive installation specifications, including wiring, conduit, power supply, and system programming. The contractor must provide one training session for each device and offer a one-year warranty on all hardware, software, materials, and workmanship. The anticipated performance period is 14 days, with strict security and conduct requirements for contractor personnel. The solicitation (FA480925Q0111) is issued by the Department of the Air Force Air Combat Command, with all offers due by August 7th at 12:00 PM EST, targeting a Honeywell Vindicator alarm and access control system implementation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
VINDICATOR ALARM SYSTEM
1. OVERVIEW
The contractor shall provide all supervision, labor, equipment, tools, and transportation necessary to deliver and install Vindicator Alarm system which will allow the staff to secure the building within the area covered for the 4th Communications Squadron COMSEC work center located on Seymour Johnson Air Force Base, NC.
2. DESCRIPTION
2.1 Equipment
The contractor shall provide equipment to secure a total of 4 access control doors and will provide 7 motion sensors to secure the offices and main door.
4 CS Plans & Resources Bldg. 2641
Access Control door coverage
Motion Sensors
2.2 Salient Characteristics
The devices will allow CAC, HID and PIN authentication.
2.3 Description of Scope
The contractor shall furnish and install a Vindicator alarm system into building 2641. The system shall:
a) Ensure that alarm system is operational and functioning on all installed devices.
b) Ensure that the CAC, HID, and PIN functions is working properly.
The contractor shall provide:
a) Wiring, conduit, power supply, buttons and other appurtenances.
b) Calibrated each device to insure proper operation.
c) Program and test system for each door/room.
d) Provide one training session for each device after installation.
The contractor shall provide one-year warranty for all contractor provided hardware/software, materials, and workmanship. The warranty period will not begin until final government acceptance.
1.0 GENERAL INFORMATION
4.1. Point of Contact. The contractor shall provide a point of contact to be responsible for the performance of the work. The point of contact shall have full authority to act for the contractor on all matters relating to the daily operation of this contract. The contractor shall designate this individual, in writing, to the Contracting Officer within three (3) business days after receipt of contract.
4.2. Security Requirements: All personnel employed by the contractor in the performance of this contract, or any representative of the contractor entering the government installation, shall abide by all security regulations of the installation.
4.3. Contractor Conduct/Qualification: The contractor shall be responsible for the actions of any of their employees who are working at any location as required by this contract. Contractor personnel shall read, understand, speak, and write English.
4.4. Performance of work. Anticipated period of performance for the installation and testing of the system is 14 days. Any hold due to the government must be submitted in writing to the contracting officer within 24 hrs of any work stoppage.