Solicitation Amendment FA480921R00090004 SF 30.pdf
PDF 583 KB Posted
- Attached to
- Pre-Engineered Steel Aircraft Canopies IDIQ
- Solicitation number
- FA480921R0009
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Contract Clauses
Miscellaneous text in this section has been modified to:
Price Adjustments
1. Price adjustments to account for fluctuations in Steel prices will be according to the U.S. Bureau of Labor Statistics (BLS) PPI Commodity data for Metals and metal products Steel Mill Products (Series ID WPU1017).
If this index is discontinued the Index for Iron and Steel (WPU101) shall be used instead.
2. The base line will be established by:
a. The most current BLS PPI data obtained at the time of proposal submission
b. The quote from PEMB manufacturer and/or a steel price quote to construct a canopy showing the current cost of steel (Provided by the Contractor at time of proposal submission IAW the Addendum to FAR 52.212-1 B (iii).
3. The starting point for the initial adjustment (if any) will be the most current observation listed on the Bureau of Labor Statistics website as identified in paragraph 1, on the date of task order award. The Contractor will then follow the procedures as outlined in FAR 52.216-4 and DFARS 252.216-7000 as applicable.
4. The issuance of a Task Order would be the trigger for a possible request for price adjustment. Price adjustments will only be made when an order is placed and not more often than quarterly.
5. Once the unit price subject to the price adjustment has been established, it will remain fixed through the life of the contract and shall not be modified except in the event of significant changes in the scope of the contract or another adjustment under the applicable EPA clauses. Pricing actions pursuant to the Changes clause or other provisions of the contract will be priced as though there were no provisions for economic price adjustment.
However, subsequent modifications may include a change to the delivery schedule or significantly change the amount of, or mix of, labor or material for the contract.
EPA clauses do not apply to labor. Adjustments for labor will be handled IAW FAR 52.222-43 on the anniversary date of the Contract.
52.216-4 ECONOMIC PRICE ADJUSTMENT-LABOR AND MATERIAL (JAN 2017)
(a) The Contractor shall notify the Contracting Officer if, at any time during contract performance, the rate of pay for labor (including fringe benefits) or the unit prices for material shown in the Schedule either increase or decrease. The Contractor shall furnish this notice within 60 days after the increase or decrease, or within any additional period that the Contracting Officer may approve in writing, but not later than the date of final payment under this contract. The notice shall include the Contractor's proposal for an adjustment in the contract unit prices to be negotiated under paragraph (b) of this clause, and shall include, in the form required by the Contracting Officer, supporting data explaining the cause, effective date, and amount of the increase or decrease and the amount of the Contractor's adjustment proposal.
(b) Promptly after the Contracting Officer receives the notice and data under paragraph (a) of this clause, the Contracting Officer and the Contractor shall negotiate a price adjustment in the contract unit prices and its effective date. However, the Contracting Officer may postpone the negotiations until an accumulation of increases and decreases in the labor rates (including fringe benefits) and unit prices of material shown in the Schedule results in an adjustment allowable under paragraph (c)(3) of this clause. The Contracting Officer shall modify this contract (1)to include the price adjustment and its effective date and (2)to revise the labor rates (including fringe benefits) or unit prices of material as shown in the Schedule to reflect the increases or decreases resulting from the adjustment. The Contractor shall continue performance pending agreement on, or determination of, any adjustment and its effective date.
(c) Any price adjustment under this clause is subject to the following limitations:
FA480921R00090004
(1) Any adjustment shall be limited to the effect on unit prices of the increases or decreases in the rates of pay for labor (including fringe benefits) or unit prices for material shown in the Schedule. There shall be no adjustment for-
(i) Supplies or services for which the production cost is not affected by such changes;
(ii) Changes in rates or unit prices other than those shown in the Schedule; or
(iii) Changes in the quantities of labor or material used from those shown in the Schedule for each item.
(2) No upward adjustment shall apply to supplies or services that are required to be delivered or performed before the effective date of the adjustment, unless the Contractor's failure to deliver or perform according to the delivery schedule results from causes beyond the Contractor's control and without its fault or negligence, within the meaning of the Default clause.
(3) There shall be no adjustment for any change in rates of pay for labor (including fringe benefits) or unit prices for material which would not result in a net change of at least 3 percent of the then-current total contract price.
This limitation shall not apply, however, if, after final delivery of all line items, either party requests an adjustment under paragraph (b) of this clause.
(4) The aggregate of the increases in any contract unit price made under this clause shall not exceed 20 percent of the original unit price. There is no percentage limitation on the amount of decreases that may be made under this clause.
(d) The Contracting Officer may examine the Contractor's books, records, and other supporting data relevant to the cost of labor (including fringe benefits) and material during all reasonable times until the end of 3 years after the date of final payment under this contract or the time periods specified in subpart 4.7 of the Federal Acquisition Regulation (FAR), whichever is earlier.
(End of clause)
Instructions, Conditions, & Notices to Offerors or Quoters
Miscellaneous text in this section has been modified to:
Addendum to FAR 52.212-1, Instructions to Offerors - Commercial Items Paragraph 52.212-1(c), Period for Acceptance of Offers, is tailored as follows: the offeror agrees to hold the prices in its offer firm through 30 September 2021. Offerors may specify a longer acceptance period than the Government's minimum requirement.
The following is inserted as new paragraph (m) of the provision:
(m) Proposal Preparation Instructions.
(1) To assure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or subfactors. Failure to meet solicitation requirements may result in the proposal being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
(2) The response shall consist of four (4) separate parts: Part I - Summary and Miscellaneous Data, Part II - Price Proposal, Part III - Technical Proposal, and Part IV - Past Performance Information.
Where Page Limits are specified:
Pages Counted. Each page shall be counted except for the following:
Cover pages Table of Contents List of Figures Glossaries
Text. Text type should be Times New Roman, no smaller than 12-point with normal proportional spacing.
Illustrations and tables shall be no smaller than Times New Roman or Arial 10 point. Text lines will be, at a minimum, single-spaced. 1-inch margins.
(3) Offerors shall submit proposals via DOD File Safe (https://safe.apps.mil/). In order to upload documents to this site, please contact Ms. Brittany Judd at brittany.judd@us.af.mil or Mr. Michael Demers michael.demers.
4@us.af.mil no earlier than 15 days prior to proposal due date. Ms. Judd will "request a Drop-off" which initiates an email with a link to upload files. It will be valid for 14 days. Once all documents are uploaded, select "Drop-off Files". All files will be active for 7 days from the date of drop-off. The date and time ascribed to the proposal shall be the date/time the email notification of drop-off is received. Ensure to select the "Encrypt all Files" button for all FOUO, PII, and PHI. If issues occur utilizing this site please contact Ms. Judd 3 working days prior to the proposal due date. IAW FAR 52.212-1(f) it is the offerors responsibility to ensure the proposal is received by the date and time specified on page one of the SF1449.
(4) Specific Instructions:
A. PART I - SUMMARY AND MISCELLANEOUS DATA
(i) Standard Form (SF) 1449. Complete blocks 12, 17a, 30a, 30b, and 30c. In doing so, the offeror accedes to the contract terms and conditions as written in the solicitation unless the offeror affirmatively states any exceptions, deviations or waivers to the contract terms and conditions. An incomplete proposal may be considered to indicate lack of understanding of the requirement and may result in the entire proposal being determined "unacceptable" and eliminated from further consideration.
(ii) All offerors must be registered and active in the System for Award Management:
https://sam.gov/SAM/, at the time of proposal submission to be considered for award.
(iii) For provisions and clauses in the solicitation, if not included in your reps and certs at SAM.gov, complete the necessary fill-ins and certifications and submit the completed pages with Part I. IAW FAR 52.204-7 and 52.204-13 the Contractor is to ensure the SAM and the reps and certs are up to date IAW the RFP.
(iv) Submit an acknowledgment of all solicitation amendments, if issued. Failure to acknowledge amendments to the solicitation shall result in the proposal being considered nonresponsive and therefore ineligible for award. Amendments shall be acknowledged by signing and returning the first page of the SF30, along with any additional documents required by the amendment.
(v) Statement of Compliance with the Service Contract Act (SCA) Area Wage Determination (WD). The offeror shall provide a statement acknowledging:
a. Offeror is in compliance with the requirements of the WD;
b. The prices proposed for labor covered by the WD was formulated using at least the minimum wage and benefit rates specified in those documents as required for covered contractor personnel;
and c. Those rates are not escalated beyond the first year of performance. (Adjustments will be made on the Contract Anniversary Date IAW FAR 52.222-43)
(vi) Submit a letter, signed at the vice-president level or equivalent or higher, that identifies the individual(s) with the authority to obligate or otherwise bind the offering company to the resulting contract and, if necessary, future contract modifications.
(vii) Responsibility Determination and Supporting Documentation: To assist in determining contractor responsibility in accordance with FAR 9.104-3(a), the offeror shall explain how it plans to maintain adequate financial resources for a contract of this magnitude and length. The offeror shall address a fiscal plan for covering mobilization, unexpected or emergency situations, and initial performance costs prior to recoupment in the form of task order completion payments. The offeror must provide complete financial statements for one (1) fiscal year and year to-date financial information through the last quarter available.
The year-end financial statements must be certified by an independent accounting firm. If the offeror intends to rely on internally available working/operation capital, documentation of availability must be submitted. If the offeror plans to rely on financial support from external sources, documentation of availability and maximum lines of credit available (based upon the inclusion of this contract effort) must be submitted. Evidence of external funding must be provided in the form of a dated letter from the external source.
IAW FAR 9.104-5, the offeror is required to comply with the submission regarding FAR 52.209-5, Certification Regarding Responsibility Matters. Since it is the Government's intent to make Award Without Discussions IAW FAR 52.215-1, the Government may request that an offeror submit additional information so a responsibility determination can be made. This request for additional information will not be construed as communications or discussions with an offeror as defined by FAR 15.306.
B. PART II - PRICE PROPOSAL
(i) Insert proposed unit prices in RFP Attachment 5, Schedule B. Include proposed discount terms. Schedule B shall be submitted in Microsoft Excel format.
(ii) Provide a labor and materials breakdown on Attachment 5.
(iii) Provide quote from PEMB manufacturer and/or a steel price quote to construct a canopy showing the current cost of steel. This information will aid in establishing a baseline from which adjustments will be made IAW the Economic Price Adjustment clauses.
(iv) Extreme care should be exercised to ensure that no price data of any kind are included in any other Part of the proposal. Only the pricing information contained in Part II shall be considered for award.
(v) Price Reasonableness: this source selection will be conducted with the expectation of adequate price competition per FAR 15.403-1(c)(1); therefore, certified cost or pricing data are not required per FAR 15.403-1(b)(1). If at any time during this competition the Contracting Officer determines that adequate price competition no longer exists or that price reasonableness cannot be determined, offerors may be required to submit additional data other than certified cost or pricing data for the Contracting Officer to determine price reasonableness.
C. PART III - TECHNICAL PROPOSAL
(i) Provide a detailed approach to accomplish/satisfy all subfactors. By submitting a proposal, the offeror affirms that its organization will perform all requirements specified in the RFP, PWS and specifications.
Technical proposal shall not include company names, logos or any other identifying information.
(ii) The Technical volume shall be organized according to the following general outline:
(1) Table of Contents
(2) Glossary
(3) Summary Page
(4) Subfactor 1 - Conformance to Specifications
(5) Subfactor 2 - Canopy Installation Plans (to include Drawings) and Schedule
(6) Subfactor 3 - Management Approach
(7) Subfactor 4 - Quality Control Approach
(8) Subfactor 5 - Mobilization Plan
(iii) Summary Page(s). To aid the Government's understanding, provide a summary of the offeror's proposed technical approach and how the approach will efficiently and effectively meet the requirement.
(iv) Subfactor 1 - Conformance to Specifications This subfactor shall address whether the offeror's technical approach conforms to the following specifications, as detailed in Attachment 2, Specification Sheets:
Conformance to Size Requirements Conformance to Roof Requirements Conformance to Wind Speed Rating Requirements Conformance to Fall Protection Requirements
Conformance to Lightning Protection Requirements Conformance to Bird Roosting Prevention Requirements Conformance to Traffic Pattern Paint Requirements
(v) Subfactor 2 - Canopy Installation Plans and Schedule This subfactor shall address the offeror's proposed canopy installation plan(s) to include proposed equipment list, materials and order and duration of activities. This subfactor shall also include a notional canopy installation schedule for one to five canopies, plans to protect/store and reinstall the lighting, and plans to minimize the damage to the concrete.
An FAA notice will be required for crane use. The contractor is responsible for the FAA notice.
Civil Engineering and Airfield Management will need to be informed immediately of any crane use to avoid any delays.
(vi) Subfactor 3 - Management Approach This subfactor shall address the offeror's proposed organizational staffing plan by skill classification and work unit. The proposal must demonstrate the organizational structure that the offeror will employ while performing this effort. The proposal shall address:
(1) Lines of authority and the details of onsite personnel by skill mix, function and numbers.
(2) Describe approach to recruit and retain an experienced, motivated workforce.
(3) Interruption of Services. Describe approach to address potential labor disputes or call up of reservists by Executive Order.
(vii) Subfactor 4 - Quality Control Plan This subfactor addresses the offeror's overall quality control plan for ensuring quality of services, products, and workmanship identified in the PWS.
(1) Quality Control Plan. Describe the QC approach the offeror will use to evaluate the quality of services provided. Specifically address/provide:
a) Organizational chart with a supporting narrative identifying lines of authority and responsibilities (as related to the QC).
b) Methods to identify and track discrepancies, document and analyze trends, utilize trend and root cause analyses.
c) Corrective action strategy to include implementation, follow-up, monitoring and methods for information sharing ("cross-tell") throughout the organization.
d) A system for recording, computing and assessing performance measurement data.
e) Linkage between the QC and offeror's training program.
f) Describe the number of Quality Control Inspectors and individual qualifications.
(viii) Subfactor 5 - Mobilization Plan Provide a detailed plan, with timelines (to include start and completion dates for all elements listed below) to achieve full performance on the first day of task order operations and ensure successful transition periods between task orders. The plan must address, but is not limited to:
a) Events: obtaining base access flight line driver's licenses and start work dates.
b) Provision of materials, equipment and vehicles (identify type, quantity of each type, availability and intended utilization).
D. PART IV - PAST PERFORMANCE PROPOSAL
(i) Volume Organization. The Past Performance volume shall be organized according to the following general outline:
(1) Table of Contents
(2) Glossary
(3) Summary Page
(4) Past Performance Information (PPI) - 5-page limit
(5) Organization Structure Change History
(6) Subcontractor Letters of Consent
(7) Client Authorization Letters
(ii) Summary Page. Many companies have acquired, been acquired by, otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant present or past contracts. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of the offering company. As part of this explanation, show how these changes impact the relevance of any efforts identified for the past performance evaluation. Since the Government intends to consider past and present performance information provided by other sources as well, the "roadmap" should be applicable to contracts the Government receives information on from other sources.
If applicable, describe the role of the Offeror and each subcontractor, teaming partner, and/or joint venture partner for whom the Offeror is required to provide Past Performance Information Sheets in accordance with paragraph e below.
(iii) Quality and Satisfaction Rating of Contracts completed in the past five years. Provide any information currently available (letters, metrics, customer surveys, independent surveys, etc.) that demonstrates customer satisfaction with overall job performance and/or quality of completed and/or ongoing contracts. In addition, explain corrective actions taken in the past, if any, for substandard performance and any current performance problems, such as cost overruns, extended performance periods, numerous warranty calls, etc.
(iv) Past Performance Information (PPI). Utilizing the PPI Sheet (Attachment 6), submit information on no more than five (5) recent and relevant contracts the offeror considers most relevant in demonstrating the ability to perform the proposed effort. Two (2) of the past performance references may be for a subcontractor, teaming partner, and/or joint venture partner that will perform major or critical aspects of the requirement (i.e., 25% or more of the work). "Recent" is defined as ongoing contracts or those completed within five (5) years of the date of issuance of the solicitation. The Past Performance Information sheets for each contract is limited to five (5) pages.
C. FACTOR 2 - PAST PERFORMANCE FACTOR
The Government will evaluate recent and relevant performance information on technically acceptable offerors based on the references provided by the offeror and any data independently obtained by the Government. The past performance evaluation will stop once a substantial confidence assessment has been reached.
The past performance evaluation will take into account past performance information regarding predecessor companies, key personnel, or subcontractors that are proposed to perform major or critical aspects of the requirement (i.e., 25% or more of the work) when such information is relevant to this acquisition.
(i) Recent past performance information includes contracts performed and/or being performed for any customer within the last five (5) years with at least 6 months of performance from the issuance date of the solicitation.
(ii) Relevant contract performance effort involved similar scope, magnitude of effort, and complexities to that required by this solicitation. The Government will assess relevancy for each contract and assign a rating as described in Table 2 below.
Table 2. Past Performance Relevancy Ratings
Rating Rating Definition Very Relevant: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this Solicitation requires. To qualify, the past/present effort must:
Involve demolition and installation of steel aircraft canopies/shelters/sunshades, include painting traffic patterns.
Number of canopies installed in excess of 50 Include schedule and time management for phased contract performance.
At least 90% of the performance must have been on a military airfield.
Performance must be done as the prime contractor, or, if a member of a joint venture, the Offeror must have contributed at least 50% of the effort.
Relevant: Present/past performance effort involved a similar scope and magnitude of effort and complexities this Solicitation requires. To qualify, the performance may fail to meet all of the requirements for "Very Relevant" but meets all of the following:
Involve installation of steel aircraft canopies/shelters/sunshades Number of canopies installed in excess of 20 Include schedule and time management for contract performance (not phased) At least 60% of the performance must have been on an airfield Performance must be done as the prime contractor, or, if a member of a joint venture, the Offeror must have contributed at least 50% of the effort.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this Solicitation requires. To qualify, the performance fails to meet all of the requirements for "Very Relevant" or "Relevant" performance but meets all of the following:
Involve installation of steel aircraft canopies/ shelters/sunshades Number of canopies installed five or more Include schedule and time management for contract performance (not phased) At least 30% of the performance must have been done on a military installation and fastened to concrete surface (not necessarily on the airfield) Performance must be done as the prime contractor, or, if a member of a joint venture, the Offeror must have contributed at least 50% of the effort.
Not Relevant: Present/past performance effort involved little or none of the scope and magnitude and of effort and complexities this Solicitation requires. To qualify, all performance fails to meet one of the three relevancy ratings: "Very Relevant", "Relevant" or "Somewhat Relevant".
(v) Specific Content: Offerors may include a discussion of efforts accomplished by the Offeror to resolve problems encountered on prior contracts as well as past efforts to identify and manage program risk.
Merely having problems does not automatically equate to a Limited or No Confidence rating, since the problems encountered may have been on a more complex program or an Offeror may have subsequently demonstrated the ability to overcome the problems. The Offeror is required to clearly demonstrate management actions employed in overcoming problems and the effects of those actions, in terms of improvements achieved or problems rectified. This could result in a rating of Substantial or Satisfactory Confidence.
(vi) If a teaming arrangement is contemplated, provide complete information as to the arrangement, including any relevant and recent past performance information on previous teaming arrangements with same partner. If this is a first time joint effort, each party to the arrangement must provide a list of past contracts of relevance.
a. Subcontractor Consent: Past performance information pertaining to a subcontractor cannot be disclosed to the prime offeror without the subcontractor's consent. Provide with the proposal a letter from each subcontractor that will perform major or critical aspects of the requirement, consenting to the release of its past performance information to the prime contractor. If the subcontractor does not consent, include a statement to that effect.
(6) Contract Award: The Government intends to evaluate offers and award a contract without discussions with offerors. Therefore, the offeror's initial offer should contain the offeror's best terms from a price and technical standpoint. However, the Government reserves the right to conduct discussions if later determined by the Contracting Officer to be in the Government's best interest.
(7) Discrepancies: If an offeror believes these instructions contain errors, omissions or are unsound, the offeror shall immediately notify the Contracting Officer in writing with supporting rationale as well as remedies the offeror is asking the Contracting Officer to consider as related to the omission or error.
(End of Addendum) (End of provision)
| IDCode: |
| Page: 1 |
| Pages: 9 |
| AmendNo: 0004 |
| EffDate: 20 May 2021 |
| ReqNo: |
| ProjNo: |
| IssCode: FA4809 |
| AdmCode: |
| IssuedBy: FA4809 4TH CONS SQDN CC |
1570 WRIGHT BROTHERS AVE BLDG 2903
CP 919 722 5417
SEYMOUR JOHNSON AFB, NC 27531-2456
UNITED STATES
Brittany Judd, Email: brittany.judd@us.af.mil Telephone: 919-722-5607
| AdminBy: |
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: FA480921R0009 |
| SolDate: 16 Apr 2021 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section G |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: This amendment clarifies the EPA adjustment information. |
| ContNameTitle: |
| CoNameTitle: MICHAEL J. DEMERS |
Email: michael.demers.4@us.af.mil Telephone: (919) 722-1762
| ContDate: |
| CODate: |
File details come from the government source that posted it. Updated .