21R0009 Q_A 2.docx

DOCX document 14 KB Posted

Attached to
Pre-Engineered Steel Aircraft Canopies IDIQ
Solicitation number
FA480921R0009
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment - FA480921R00090004.pdf PDF
IMAGE - Canopy 1.JPG JPG image
IMAGE- EDS Enclosed Snap Switch - Canopies.pdf PDF
Solicitation Amendment FA480921R00090004 SF 30.pdf PDF
IMAGE - Canopy 2.JPG JPG image
IMAGE - Canopy 3.JPG JPG image
IMAGE - Receptacle.JPG JPG image
IMAGE- 150 Watt LED EP Light - Canopies.pdf PDF
IMAGE - Canopy 4.JPG JPG image
Solicitation Amendment FA480921R00090003 SF 30.pdf PDF
Solicitation Amendment - FA480921R00090003.pdf PDF
Solicitation Amendment FA480921R00090002 SF 30.pdf PDF
Solicitation Amendment - FA480921R00090002.pdf PDF
Attachment 9 -ASBUILT DWGS - Shelter Electrical 2.pdf PDF
21R0009 QA (2).docx DOCX document
Attachment 10 Shelter Elec Panel 2.jpg JPG image
Solicitation Amendment FA480921R00090001 SF 30.pdf PDF
Site Visit Minutes Canopies.pdf PDF
Attachment 8 - ASBUILT DWGS - Shelter Electrical.pdf PDF
Solicitation Amendment - FA480921R00090001.pdf PDF
Site Visit Sign-In Sheet_Redacted.pdf PDF
Attachment 3 - Aircraft Canopy Drawings (FULL SET) R1.pdf PDF
Attachment 1 - PWS - 15 Apr 2021.docx DOCX document
Solicitation - FA480921R0009.pdf PDF
Attachment 6 - Past Performance Information.pdf PDF
Attachment 4 - Concrete Thickness Drawing.pdf PDF
Attachment 2 - Specifications 1 April 21.doc DOC document
Attachment 7 - AWD 2015 4379 rev 14.pdf PDF
Attachment 5 - Schedule B - CLIN Structure.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Fabricated Steel Aircraft Canopies

FA480921R0009

Questions and Answers- 2 20 May 2021

1. Amendment 2 released on 5/14 significantly changes the sow as stated in the PWS relating to electrical and lighting protection (question 26) and effects electrical and shop drawings required for submission with our proposal. The current 6 business days given is not sufficient time to disseminate to our design and subcontractor teams to produce shop drawings and provide accurate pricing.

Response: IAW with Q&A 32 Electrical Drawings are not required.

1. Amendment 3 – PEMB suppliers will not hold pricing longer then 15 days currently so the proposing KTR must use historical data in price fluctuations and sound judgement to provide a fixed firm price which will be valid for 240 days as required per the RFP. The requirement for a PEMB price on the proposal date is not fair or reasonable to be a basis of an equitable adjustment since it is not valid past 15 days. Suggest the following method for a Best Value determination. “KTR to provide a PEMB quote with and explanation of methodology and escalators used to maintain pricing which is valid for 240 days as required by the RFP”

Response: See updates in Amendment 0004.

1. 4.4.1.D says “All drawings shall use the standard Seymour Johnson AFB project templates to include title block, this AUTOCAD title block was not provided in the last two Amendments and is a requirement for proposal submission. Please provide this title block to be incorporated into or proposal.

Response: This only applies if/when you submit CADD files and is not required with proposal submission.