Attachment 5 - Schedule B - CLIN Structure.xlsx

XLSX spreadsheet 23 KB Posted

Attached to
Pre-Engineered Steel Aircraft Canopies IDIQ
Solicitation number
FA480921R0009
Issued by

View the file

Other files

File Type Posted
21R0009 Q_A 2.docx DOCX document
Solicitation Amendment - FA480921R00090004.pdf PDF
IMAGE - Canopy 1.JPG JPG image
IMAGE- EDS Enclosed Snap Switch - Canopies.pdf PDF
Solicitation Amendment FA480921R00090004 SF 30.pdf PDF
IMAGE - Canopy 2.JPG JPG image
IMAGE - Canopy 3.JPG JPG image
IMAGE - Receptacle.JPG JPG image
IMAGE- 150 Watt LED EP Light - Canopies.pdf PDF
IMAGE - Canopy 4.JPG JPG image
Solicitation Amendment FA480921R00090003 SF 30.pdf PDF
Solicitation Amendment - FA480921R00090003.pdf PDF
Solicitation Amendment FA480921R00090002 SF 30.pdf PDF
Solicitation Amendment - FA480921R00090002.pdf PDF
Attachment 9 -ASBUILT DWGS - Shelter Electrical 2.pdf PDF
21R0009 QA (2).docx DOCX document
Attachment 10 Shelter Elec Panel 2.jpg JPG image
Solicitation Amendment FA480921R00090001 SF 30.pdf PDF
Site Visit Minutes Canopies.pdf PDF
Attachment 8 - ASBUILT DWGS - Shelter Electrical.pdf PDF
Solicitation Amendment - FA480921R00090001.pdf PDF
Site Visit Sign-In Sheet_Redacted.pdf PDF
Attachment 3 - Aircraft Canopy Drawings (FULL SET) R1.pdf PDF
Attachment 1 - PWS - 15 Apr 2021.docx DOCX document
Solicitation - FA480921R0009.pdf PDF
Attachment 6 - Past Performance Information.pdf PDF
Attachment 4 - Concrete Thickness Drawing.pdf PDF
Attachment 2 - Specifications 1 April 21.doc DOC document
Attachment 7 - AWD 2015 4379 rev 14.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit

FA480921R009 Attachment 5
Exhibit A - CLIN DETAIL
This excel spreadsheet has been set up to calculate total dollar values. Only insert the UNIT PRICE for each line item. All line items shall be in accordance with the Performance Work Statement (PWS). This is a performance-based acquisition and the Contractor is responsible for ensuring the service is completed in accordance with the standard outlined in the PWS. The Contractor will be paid based on actual quantities furnished. Note: Although the government has made every effort to ensure the matrix calculates properly, it is solely the contractors responsibility to ensure the final calculation is correct.
CLIN 0001 DETAIL
DESCRIPTIONUOMUNIT PRICEQUANTITYTOTALSQuantity Discounts per order
Provide and Install Pre-Engineered Steel Aircraft Canopy System IAW with the Performance Work Statement (Attachment 1) and Specifications (Attachment 2).EA$0.0060$0.001 to 5_______%
Labor (Annual adjustments authorized IAW FAR 52.222-43)EA606 to 10_______%
Steel (Per Canopy) 52.216-4 EPA applies to this line item only. Country of Origin:______________LO6011 to 15_______%
All Other Material (Per Canopy)LO6016 to 20_______%
TOTAL CLIN 0001 PRICE$0.0021 or more_______%
CLIN 0002 DETAILNote: Quantity discount is off the price of CLIN 0001.
Dismantle, Palletize, and Transport existing canvas shelters to Gov't directed location on base. Increase/Decrease from unit price on line 7 above. When the Gov't places an order, this cost will be addded or deducted from the unit price of line 7.EA10$0.00
CLIN 0003 DETAIL
Demolish and dispose of structure off base. Increase/Decrease from unit price on line 7 above. When the Gov't places an order, this cost will be addded or deducted from the unit price of line 7.EA47$0.00
CLIN 0004 DETAIL
DESCRIPTIONUOMUNIT PRICEQUANTITYTOTALS
Mobilization IAW with the Performance Work Statement (Attachment 1) and Specifications (Attachment 2).EA60$0.00
CLIN 0005 DETAIL
DESCRIPTIONUOMUNIT PRICEQUANTITYTOTALS
Demobilization IAW with the Performance Work Statement (Attachment 1) and Specifications (Attachment 2).EA60$0.00
CLIN 0006 Parts/Additional Requirements : The below items will be utilized for purchasing parts when the existing parts (that are to be reused) are discovered to be damaged or defective.
DESCRIPTIONUOMUNIT PRICEQUANTITYQUANTITY
Procure New Explosion Proof LED Light FixtureEA15$0.00
Procure New Explosion Proof 120 Volt ReceptacleEA15$0.00
Procure New Explosion Proof Light SwitchEA15$0.00
Procure New Explosion Proof Panelboard/Surge Protection & DisconnectEA15$0.00
Procure New Explosion Proof 3/4” Conduit SealEA15$0.00
Procure New Explosion Proof 1” Conduit SealEA15$0.00
Procure New Explosion Proof 2” Conduit SealEA15$0.00
Procure New 3/4” Electrical ConduitLF15$0.00
Procure New 1” Electrical ConduitLF15$0.00
Procure New Explosion Proof Junction BoxLF15$0.00
Procure New #12 ConductorsLF15$0.00
Procure New #10 ConductorsLF15$0.00
Procure New #8 ConductorsLF15$0.00
Procure New Lightning Protection System Air TerminalsEA15$0.00
Procure New Lightning Protection System Down ConductorsLF15$0.00
Procure New Lighting Protection System Grounding RodsEA15$0.00
As-built Drawings are only required per order if changes are made from the initial approved Engineered Drawings. IAW with PWS para 4.4.2ST15$0.00
TOTAL CLIN 0006 PRICE$0.00

TOTAL EVALUATED PRICE $0.00