Amendment.doc

DOC document 2 MB Posted

Attached to
Ground Forces Support Building Federal contract opportunity
Solicitation number
FA4809-10-Q-0314
Issued by
Department of the Air Force Air Combat Command

About this file

Amendment

View the file

Other files for this federal contract opportunity

Other files attached to Ground Forces Support Building, newest first.
File Type Posted
Responses to Questions.docx DOCX document
Hardcopy of drawing for Solicitation.pdf PDF
Solicitation.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

THE PURPOSE OF THIS AMENDMENT IS TO INCORPORATE A REVISED STATEMENT OF WORK, TO DECREASE THE QUANTITY FOR CLIN 0003, AND TO ADD SPECIFICATIONS AS FOLLOWED:

A. CLIN 0003: The pricing detail quantity has decreased by 1.00 from 2.00 to 1.00.

B. The additional specifications to answer all questions are as follows:

Specifications

There is a 50 gallon minimum for the water heater size.

The building needs to be New. Used or Like New is not acceptable

The trailer is to be blocked, leveled, and hurricane strapped

Wooden stairs are acceptable

There are no requirments for an ADA ramp, ADA shower, ADA toilet, or ADA sink.

There are no plans to move the building, however it still needs to be portable.

C. The following Statement of Work has been modified to clarify that there is no need for electrical, water, and sewer hookup. The new Statement of Work is incorporated:

STATEMENT OF WORK (SOW)

1. SCOPE: The work covered by the provisions of this contract consists of furnishing all labor, tools, equipment and supplies necessary to provide, transport and complete setup of one 40’ x 24’ classroom (36’ x 24’ box) of the desired configuration (attached). Installation of electrical, water and sewer connection are NOT included. Government personnel will take care of the electric, water and sewage hook up. The contractor will be responsible for:

Completing the job in accordance with all federal, state, and local codes.

2. MATERIALS: One 40’ x 24’ classroom (36’ x 24’ box), tie-downs, vinyl skirting, blocking/leveling supplies, steps and any other miscellaneous supplies required to complete work.

3. LOCATION: This work is to be accomplished at the Air Force Dare County Bombing Range, Stumpy Point, NC 27978.

4. WORKMANSHIP: All workmanship will comply with standard trade practices. The contractor shall provide all qualified personnel, equipment, and services required to accomplish task as stated in item one.

5. CLEANUP: The contractor is responsible to return all work sites to the condition in which they were found.

6. WARRANTY: The contractor will guarantee all workmanship for a period of one year from completion of work.

D. All other terms and conditions remain unchanged.