Attachment 5 - Questions and Answers.docx
DOCX document 25 KB Posted
- Attached to
- B216 Vault Upgrade
- Solicitation number
- FA480324QB086
About this file
This document is a set of Questions and Answers related to the B216 Vault Upgrade contract opportunity with solicitation number FA480324QB086.
The key details are:
- The contract requires the installation of a Honeywell Vindicator Intrusion Detection System and Entry Control System in Building 216, per the Statement of Work.
- It provides clarification on the requirements, including the need for a Windows 10 Vindicator Site Commander, industrial network switch, intrusion detection and access control devices, and potential design/consulting services.
- The government will provide the electrical pathways and conduit, but the contractor is responsible for connecting the Vindicator system to the base network.
- No specific security clearances are required, but Honeywell Vindicator certification is preferred for the technical staff.
- The contracting agency is the Department of the Air Force Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFQ - amendment 1.pdf | ||
| Attachment 1 - Statement of Work.pdf | ||
| RFQ PDF SIGNED.pdf | ||
| Attachment 3 - Base Access RSVP Form.docx | DOCX document | |
| Attachment 4 - Wage Determination.pdf | ||
| Attachment 2 - Brand Name Justification.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA480324QB086
Attachment 3
Attachment 5 - QUESTIONS WITH ANSWERS 9 August 2024
Questions and Answers: B216 Vault Upgrade
Question 1: The SOW calls for a Windows 10 Vindicator Site Commander (VSC) in the LRS Break Room which will communicate to the field panel located in the maintenance closet. Does this need to include a SAW for reporting capabilities?
Answer: Yes, it does.
Question 2: The SOW calls for a Windows 10 Vindicator Site Commander (VSC) in the LRS Break Room which will communicate to the field panel located in the maintenance closet. Is there already a Vindicator panel installed in the maintenance closet this VSC will connect to?
Answer: No there isn’t.
Question 3: The SOW calls for an industrial grade network switch that shall be provided by the contractor to communicate with the Vindicator network. Is there a specific size and brand of switch required?
Answer: No specific brand.
Question 4: The SOW calls for an industrial grade network switch that shall be provided by the contractor to communicate with the Vindicator network. Is the government providing the fiber to connect the switch to the Vindicator Network? If so, what type of fiber and ends are being provided (i.e. Singlemode with LC connectors)?
Answer: No that should be provided by the contractor.
Question 5: The SOW calls for an industrial grade network switch that shall be provided by the contractor to communicate with the Vindicator network. Is the government programming the switch to the Vindicator network?
Answer: The contractor will need to work with the POC to ensure it is connected to the base network.
Question 6: There is no mention of intrusion detection or access control devices needed for this project: Can the government provide what devices are necessary?
Answer: Yes, we do need intrusion detection and access control devices. The contractor should provide these devices.
Question 7: Do you have a map of the base?
Answer: Directions to the site will be provided to the awardee.
Question 8: Do you have a floor plan for the building? Can the government provide a drawing of the facility?
Answer: I can get you a floor plan, but it may take me a few weeks to procure due to having to coordinate with another unit for it.
Question 9: Do you already have an electrical contractor onsite to handle pathways and conduit?
Answer: We will utilize our Electrical Shop that is apart of the 20 Civil Engineering Squadron for all pathways and conduit.
Question 10: Does this project require Quad Team to provide Vindicator and/or IDS equipment?
Answer: Yes, all Vindicators and/or IDS equipment should be provided by contractor and Quad Team.
Question 11: Does this project require design services?
Answer: No.
Question 12: Does this project require professional services (i.e., consulting, training)?
Answer: Yes, all consulting and training should be provided by the contractor.
Question 13: Does this project require any specific security clearances with the DOD?
Answer: No.
Question 14: Does this project require techs to be certified by Honeywell Vindicator system in order to bid on it?
Answer: Honeywell Vindicator is the preferred brand of equipment so that would be ideal.