Attachment_1_-_Travel_Pod_Refurbishment_PWS.pdf
PDF 193 KB Posted
- Attached to
- Repair/Refurbish Travel Pods
- Solicitation number
- FA4803-17-Q-G001
About this file
Travel Pod Refurbishment PWS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combo_RFQ_Amendment_1.pdf | ||
| PWS_Attachment_1_-Travel_Pod_Picture_with_Part_Number.pdf | ||
| Attachment_3_-_PAST_PERFORMANCE_QUESTIONNAIRE.doc | DOC document | |
| Attachment_2_-_SC_WD_15-4439_(Rev-1).pdf | ||
| Attachment_4_-_Price_Quotation.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
Travel Pod Refurbishment 20 Aircraft Maintenance Squadron Shaw AFB, SC
23 March 2017
Date: _____________ KRISTEN M. TORMA, Maj, USAF Commander, 20 AMXS
Reviewed:
____________________________________ Date: _____________
SONIA TAYLOR
Quality Assurance Program Coordinator
Accepted:
__________________________________ Date: _____________
DANIEL KANE
Contracting Officer
1099244379C Typewritten Text
1099244379C Typewritten Text
1099244379C Typewritten Text Version 1 6 April 2017
1099244379C Typewritten Text
1099244379C Typewritten Text
1012916732C Typewritten Text 4 April 2017
1012916732C Typewritten Text
1012916732C Typewritten Text 8 May 2017
1012916732C Typewritten Text
1012916732C Typewritten Text
1012916732C Typewritten Text
1012916732C Typewritten Text
Travel Pod Refurbishment PWS Attachment 1
Performance Work Statement Table of Contents
PARAGRAPH SECTION TITLE PAGE
1.0 DESCRIPTION OF SERVICES 3
Contract Manpower Reporting 3 Continuation of Mission Essential Services 3
2.0 SERVICES SUMMARY (SS) 4
3.0 GOVERNMENT PROPERTY AND SERVICES 5
4.0 SPECIFIC REQUIREMENTS 5
4.1 Installation Operations 5
4.2 Security Requirements 6
4.3 Environmental Controls 7
4.4 Safety Requirements 8
APPENDIX 1 APPLICABLE REGULATIONS, INSTRUCTIONS & GUIDANCE 10
1.0 DESCRIPTION OF SERVICES. The Contractor shall provide non-personal services, to include all personnel, equipment, tools, transportation, supervision, and other items and services necessary to refurbish and overhaul eighty
(80) MXU-648 aluminum travel pods. The Contractor shall pick up travel pods in groups of twenty-five (25) or less and complete all work at an offsite location. Work consists of preparation, sheet metal repair, repair of latches and hinges, painting and customization as identified in this PWS. The contractor shall comply with applicable federal, regional, state, and local laws and commercial standards.
1.1. The overhaul will consist of a complete tear down of the pod, (i.e. removal of nose cones, access door and lugs).
The pods will require complete paint removal, inspection for damage and treatment for corrosion. All accessible dents will require removal along with any sheet metal work required to fix damage and make the pod water tight and air worthy. Nose cones and access door seals will need to be replaced to prevent water intrusion. A new access door with quick release latches and hinges will require manufacturing and installation by the Contractor. All access doors shall be fitted flush with the pod. Additional beef-up plates shall be installed on the side of the pod for latch support. Pods will require one loading handle at each end, and four feet fins that will need to be manufactured and installed to prevent the pod from rolling when placed on the ground or stored.
1.2. Once sheet metal work is completed, each pod will need to be submersed in an alodine coating to extend service life. Seventy (72) pods shall be painted with gray MIL-Spec 270 or compatible MIL-Spec paint with Forward (FWD) stencil on the corresponding end of the pod. Eight (8) pods shall require a custom paint job. The custom paint job with stenciling shall at a minimum consist of high gloss paint finish, multi-color paint, owning unit decals, rank/name of Commander and organization.
1.3. The finished pod must be as streamlined as possible to prevent aerodynamic drag.
1.4. The Contractor shall maintain a schedule for the pickup of twenty-five or less travel pods and return of completed travel pods. The Contractor schedule will be agreed upon by the 20 AMXS prior to the commencement of work.
1.5. The Contractor is expected to ensure that the pods are not damaged during transportation. If pods are damaged, contractor will repair at no cost to the government. The pods are expected to be in good working condition when they arrive at Shaw AFB. All quick latches shall be secured and working properly. Handles shall be secured and functional. All feet fins shall be secured and functional. The pod shall be fully painted with no exposed metal. The inside of the pod shall be properly supported to ensure pod’s structural integrity. These items will inspected before the pod each accepted by 20 AMXS.
1.6. BASE ACCESS REQUIREMENTS. The Contractor shall comply with all requirements and procedures in accordance with (IAW) AFFARS 5352.242-9000, Contractor Access to Air Force Installations, and shall ensure the pass and identification items required for contract performance are obtained for all personnel. All documentation shall be submitted for base passes or base identification per Base Security Requirements. Contractor personnel shall obtain and wear specific Contractor base passes. Contractor personnel who have personal DoD retiree or dependent identification cards (ID), shall not use those personal ID cards for base access when performing contract work. All Contractor personnel who operate a vehicle in performance of this contract shall possess a valid driver’s license, current registration and insurance. Failure to turn in a base credential when requested can result in a non-recommend from Security Forces for future base access. The Contractor is responsible for employee inability to obtain base access required for contract performance.
1.7. CONTINUATION OF ESSENTIAL CONTRACTOR SERVICES: This requirement is not considered mission essential, and services will be suspended during a declared emergency.
1.8. CONTRACT MANPOWER REPORTING The Contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via secure data collection site. The contractor is required to completely fill in all required data fields at the Air Force CMRA link https://afcmra.hqda.pentagon.mil/Login.aspx. Reporting inputs will be for the labor executed during the period of performance for each Government Fiscal Year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year.
Contractors may direct questions to the CMRA help desk.
1.9. Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
1.10. User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for Government personnel and contractors are available at the Army CMRA link at http://www.ecmra.mil.
1.11. MISCELLANEOUS REQUIREMENTS.
1.12. Purchase of Recycled Products: The Contractor shall comply with the DoD Green Procurement Program for Recovered Materials.
1.13. Publications: The Contractor shall ensure compliance with all applicable publications, regulations, and operating instructions related to the tasks set forth in this PWS. The Contractor is required to acquire and abide by the latest version of all publications. See Appendix 2 for a list of applicable publications.
2.0 SERVICES SUMMARY (SS). The Government will use the services summary which includes critical objectives and standards to determine contractor performance against mission essential items. Performance objectives define the desired outcomes for mission essential tasks. Performance thresholds define the minimum acceptable level of performance required to meet the standard to successfully meet the performance objective.
Performance Objective PWS Paragraph
Performance Threshold
SS-1 Hardware. 1.5 No more than 0 faulty latches, handles or feet fins.
SS-2 Properly working seals 1.5 No more than 0 Faulty Seals.
SS-3 Paint Coverage. 1.5 No more than 0 spots missed or defect. Also correct stenciling and markings
SS-4 Inside of Pod 1.5 No more than 0 missing internal support brackets
SS-5 Hanging Lugs 1.5 No more than 0 missing lugs and 0 painted on lugs. 2 lugs per pod
SS-6 Door Hinges 1.1 No more than 0 cracks in door hinge and hinge must be operational
SS-7 Body work 1.1 No more than 2 “less than ½’’ in diameter dent, creases, ding in sheet metal work.
2.1. QUALITY CONTROL. The Contractor shall establish, operate and maintain a highly effective Quality Control Program (QCP) to ensure all services are performed in accordance with this Performance Work Statement (PWS). The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum, the contractor shall develop quality control procedures that address the areas identified in paragraph 2.0, Services Summary. The Contractor’s QCP shall be provided to the contracting officer for acceptance not later than the post award conference, and shall remain in effect during the term of this contract
(including any option periods if exercised). A copy of the QCP shall be maintained on-site and be available to all members of the on-site staff as well as the Contracting Officer and COR. The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall assign work effort and maintain proper and accurate time keeping records of personnel assigned to work on the requirement.
2.2. QUALITY ASSURANCE. The Government shall monitor and evaluate the Contractor’s performance to ensure services are received IAW requirements set forth in this PWS. The method of surveillance will be spelled out in the Governments’ Quality Assurance Surveillance Plan. The COR will periodically inspect by watching actual task performance, physically checking an attribute of the completed task, checking a management information report, investigating customer complaints, or otherwise inspecting the task or its result to determine whether or not the performance meets the standards contained in this PWS. The COR may also inspect tasks not specifically mentioned in the Services Summary (Para 2.0 above). The COR will document the results of the surveillance and this documentation will become the official Air Force (AF) record of the Contractor’s performance. When a performance threshold has not been met or Contractor performance has not been accomplished, the COR will initiate and provide a report to the CO for action concerning the Contractor. The Contractor shall respond to the CO within ten (10) calendar days of receipt. The surveillance results shall be maintained as past performance information of the Contractor’s overall compliance with contract terms and conditions.
The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer immediately.
2.3. PERIODIC PROGRESS MEETINGS. The CO, COR, and other Government personnel, as appropriate, will meet periodically with the Contractor to review the Contractor's performance. The initial meeting will be scheduled within thirty days after the contract start date or after the contractor assumes full performance responsibility if a transition plan was required. At these meetings the CO will apprise the Contractor of how the Government views the Contractor's performance and the Contractor will apprise the Government of problems, if any, being experienced.
Other topics may include (as applicable): opportunities to improve the contract, any modifications required of the contract, unsatisfactory performance inspections results, and valid customer complaints against each performance objective observed, and the results of corrective and preventive action measures. The Contractor will also notify the CO in writing, of work being requested or performed, if any, that the Contractor considers over and above the requirements of the contract. Appropriate action shall be taken to resolve outstanding issues.
The minutes of these meetings will be documented in writing, signed by the CO and any other signatures as deemed appropriate, and distributed to the COR functional area and the Contractor. Should the Contractor not concur with the minutes, the Contractor will set out in writing to the CO any areas of non-concurrence. These meetings shall be held as needed, but not less than monthly.
3.0 GOVERNMENT PROPERTY AND SERVICES. The Government will provide property for contract performance. These supplies and/or facilities shall only be used for performance of this contract. The property will be accountable to the Government. The Contractor shall be responsible and accountable for all Government Property provided under this contract in accordance with the FAR clause 52.237-2, Protection of Government Buildings, Equipment, and Vegetation.
4.0 SPECIFIC REQUIREMENTS
4.1 INSTALLATION OPERATIONS
Normal Hours of Operation: Base hours of operation are 7:30 a.m. to 4:30 p.m., Monday through Friday. The Contractor may find it necessary to deviate from the normal base hours of operation to ensure timely completion of work under this PWS, at no additional cost to the Government. If work is performed outside normal base hours of operation such schedule shall be coordinated and approved by the COR at least 24 hours in advance.
Recognized Holidays: The Government shall not provide base support or facility access for the days below, except when services are required by the Customer and with prior approval in writing from the CO. Any of the below holidays falling on a Saturday will be observed on the preceding Friday; holidays falling on a Sunday will be observed on the following Monday:
New Year’s Day 1 January Martin Luther King's Birthday Third Monday in January President's Day Third Monday in February Memorial Day Last Monday in May ACC Family Day 26 May ACC Family Day 3 July Independence Day 4 July Labor Day First Monday in September ACC Family Day 5 September Columbus Day Second Monday in October Veterans Day 11 November Thanksgiving Day Fourth Thursday in November ACC Family Day 24 November Christmas Day 25 December ACC Family Day 26 December
4.2 SECURITY REQUIREMENTS:
4.2.1. Listing Of Employees: The Contractor shall maintain a current listing of employees. The list shall include the employee's name, social security number and type of investigation if contract work involves unescorted entry to Air Force restricted areas or other sensitive areas designated by the installation commander. The list shall be provided to the Program Manager/COR and sponsoring agency's Security Manager. An updated listing shall be provided when an employee's status or information changes.
4.2.2. Security Training: The Contractor ensures all Contractor employees receive initial and recurring security education training from the sponsoring agency's security manager. The security manager shall provide employees with training required by DODM 5200.01, DoD Information Security Program, Volume 3, and AFI 16-1404, "Air Force Information Security Program". The Contractor will also provide initial and follow-on training to contractor personnel who work in Air Force controlled/restricted areas. Air Force restricted areas and controlled areas are explained in AFI 31-101, Integrated Defense.
4.2.3. Pass And Identification Items: The Contractor shall ensure the pass and identification items required for contract performance are obtained for employees. All contractor employees shall undergo a background check conducted by 20th Security Forces Squadron prior to issuance of base access credentials. Only identification cards or driver's licenses from REAL ID compliant states or territories will be accepted. For a full list of REAL ID Act and compliant and non-complaint states, please visit https://www.dhs.gov/current-status-states-territories. Contact 20th Security Forces Squadron for alternative forms of acceptable identification to conduct background checks.
4.2.4. Background Checks: All Contractor employees shall submit to a criminal background check accomplished by Shaw Air Force Base Security Forces prior to the employee being issued base access credentials. Each Contractor personnel must submit their Social Security Number, Date of Birth, and Driver's License state and number (if applicable). Failure to submit required information can result in denial or delay of issuance of credentials.
Background checks are only good for the company that requested them. Processing background checks takes, at a minimum, 7-10 days from time of submission.
4.2.5. Retrieving Identification Media: The Contractor shall retrieve all identification media from employees who depart for any reason before the contract expires; e.g. terminated for cause, retirement, etc.
4.2.6. Traffic Laws: The Contractor and its employees shall comply with base traffic regulations.
4.2.7. Weapons, Firearms, and Ammunition: Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their contractor-owned vehicle or privately-owned vehicle while on Shaw AFB SC.
4.2.8. For Official Use Only (FOUO): The Contractor shall comply with DoD 5400.7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program, requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
4.2.9. Reporting Requirements: Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DoD personnel, Contractor personnel, resources, and classified or unclassified defense information. Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.
4.2.10. Physical Security: The Contractor shall be responsible for safeguarding all Government property and controlled forms provided for Contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.
4.2.11. Controlled/Restricted Areas: (If Applicable) The Contractor shall implement local base procedures for entry to Air Force controlled/restricted areas where Contractor personnel will work. An AF Form 2586, Unescorted Entry Authorization Certificate, must be completed and signed by the sponsoring agencies Security Manager before a Restricted Area Badge will be issued. Contractor employees must have a completed Tier 1 investigation before receiving a Restricted Area Badge. Interim access can be granted IAW AFI 31-501, Personnel Security Program Management.
4.2.12. Photography Restrictions: No one is authorized to take any pictures or video recordings of Air Force operational aircraft or restricted areas without the approval of 20 FW/CVN regardless of location while on Shaw AFB.
This includes, but is not limited to, photographs taken from personal electronic devices such as blackberries, iPADs, iPODs, cell phones, or any other devices with digital recording capabilities.
4.2.14.1. Any Contractor requiring pictures or videotape of Shaw's airfield to support their contract must request and possess written authorization prior entering the airfield area.
4.2.14.2. Written authorization letters to photograph or video of the flightline must be signed by one of the following:
20 Maintenance Group Commander or Deputy; Aircraft Maintenance Squadron Commander; a Fighter Squadron Top 3, Director of Operations, or Commander; 20 Operations Group Commander or Deputy; 20 Operations Support Squadron Commander or Director of Operations; or 20 FW/CVN.
4.3 ENVIRONMENTAL CONTROLS.
4.3.1 Compliance with Laws and Regulations: The Contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State, and Local laws, regulations, and requirements regarding environmental protection.
In the event environmental laws/regulations change during the term of this contract, the Contractor is required to comply as such laws come into effect. If there is an increase or decrease in cost as a result of the change, the Contractor shall inform the CO pursuant to notice requirements and negotiate a modification to the contract. The Contractor shall not use products that are or contain Toxic 17 chemicals, Extremely Hazardous Substances (EHS), Ozone Depleting Substances (ODS), and/or Persistent Bio-accumulative and Toxic (PBT) chemicals. Any hazardous material containing one of these banned substances will not be allowed on base. The Government will provide local information on Shaw AFB Environmental Protection and Environmental Management System (EMS).
4.3.2 Environmental Spills: If the Contractor spills or releases any substance contained in 40 CFR 302 into the environment, the Contractor or its agent, shall immediately report the incident to Security Forces Emergency Response Center at 911. The liability for the spill or release of such substances rests solely with the Contractor and its agent.
The Contractor is responsible to promptly cleanup all spills in a manner consistent with current environmental regulations. In the event that it is necessary to utilize Government material, equipment or personnel to clean up a Contractor caused spill, the Contractor shall be required to reimburse the Government for all associated costs.
4.3.3 Material Storage and Use: The Contractor shall follow manufacturer’s guidelines and professional recommendations for control of humidity, temperature, cleanliness, and materials handling. This includes hazardous materials.
4.3.4 Hazardous Material Handling: The Contractor shall have approval from the base Hazardous Material Pharmacy (HAZMART) section prior to purchasing, handling, using, and storing any chemicals, solvents, lubricants, and other products that require Material Safety Data Sheets (MSDS). The Contractor shall identify these materials and products on Air Force Form 3952 Chemical/Hazardous Material Authorization Request, Process Identification Form, and Shop Disposal Form. The Contractor shall provide one copy of the MSDSs for each item to HAZMART section for review prior to any chemicals being brought onto Shaw AFB (to include its annexes such as Poinsett or Wateree).
The Contractor shall maintain one copy of the MSDSs for each hazardous material line item used within the work center.
4.3.5 HAZMART: Ensure that this is not a repeat from what is in the base HAZMAT contract. If the contractor is required to handle their own chemicals keep this verbiage. If not, remove and confer with current HAZMAT contract.
The Government (HAZMART personnel) will inventory all chemicals that the Contractor brings on to Shaw AFB (to include annexes such as Poinsett or Wateree). Any products that meet the criteria of “Hazardous Waste” must be bar coded and tracked until permanently removed from Government property. The inventory will be performed prior to commencement of work. Criteria for identifying hazardous waste, is contained in Subpart C of 40 CFR, Part 261.
4.3.6 Training: The Contractor shall ensure all employees complete the local Air Force Hazardous Communication, HAZMART, and hazardous waste training. The Contractor shall appoint a primary and alternate HAZMART and Hazardous Waste monitor. Monitors are responsible for training all Contractor personnel regarding hazardous material containers maintained within Shaw AFB (and all annexes such as Poinsett or Wateree) and complete MSDSs immediately upon receipt of new chemicals, products, or materials. The Contractor shall submit MSDSs to HAZMART as required.
4.3.7 Contractor-Furnished Hazardous Material: The Contractor shall develop a record to document bringing or using hazardous material on Government facilities. The Contractor shall develop the record not later than thirty (30) calendar days after contract start and develop and maintain electronic updates to the records quarterly thereafter. If no hazardous material is used in performance of the contract during the quarterly period, the Contractor shall indicate “none” on the applicable quarterly record. The record shall consist of the following:
Section 1 - General Information. This section shall contain: Contract number; contract performance period;
Contractor's name; date of record; name and phone number of on-base Contractor point of contact; emergency phone number; and address or physical location of the Contractor’s on-base field office.
Section 2 - Product Information. This section shall contain: product nomenclature; product trade name; product part number; manufacturer’s name and address; physical location(s) of on-base usage and storage; description of how product is used; justification for use.
Section 3 - Usage/Storage Amount. This section shall contain: unit of measure (e.g., gallons, quarts, pints, fluid ounces, pounds, or other); amount brought on installation; amount used during reporting period; amount stored;
amount removed; and signature of responsible Contractor.
4.4 SAFETY REQUIREMENTS.
4.4.1 Safety Requirements and Reports: The Contractor shall perform work in a safe manner as required by OSHA Safety and Health Requirements and applicable Department of Labor, Department of Defense and Air Force safety standards. The Contractor shall provide a verbal report to the CO as soon as possible following an occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of the required Accident Investigation Report to the CO within five
(5) calendar days of each occurrence. The Accident Investigation Report shall be prepared and submitted IAW AFI 91-204.
4.4.2 Mishaps: In the event of an accident/mishap, the Contractor shall take reasonable and prudent action to establish control of the accident/mishap scene, prevent further damage to persons or property, and preserve evidence until released by the accident/mishap investigative authority through the CO.
4.4.3 Investigations: If the Government elects to conduct an investigation of the accident/mishap, the Contractor shall cooperate fully and assist Government personnel in the conduct of investigation until the investigation is completed.
4.4.4 Confined Space Program: IAW AFI 91-203 paragraph 23.8, the Air Force is required to inform Contractors of Confined Spaces and known hazards associated with them. This includes the following:
Notify the Contractor that work will be performed in a permit-required confined space and ensure the information is included in the Performance Work Statement (PWS) or equivalent contracting tool.
Ensure the Fire Chief coordinates on the confined space entry contract and either approves or disapproves the use of the rescue team supplied by the installation Fire Emergency Services Flight.
Brief the Contractor on the contents of the space and known hazards that make the space permit-required and any precautions and procedures that have been implemented by the organization to protect Air Force workers.
The Contractor shall provide the CO an after-action brief providing information regarding hazards encountered or created in the space(s) and report any unsafe act or procedure performed.
APPENDIX 1 – APPLICABLE REGULATIONS, INSTRUCTIONS AND GUIDANCE
The Government will make all publications, forms, references and report formats listed available. Supplements or amendments to listed publication from any organizational level may be issued during the life of the contract. The Contractor shall immediately implement those changes in publications, which result in a decrease or no change to the contract price. Prior to implementing any such revision, supplement, or amendment that will result in an increase in contract price, the Contractor shall submit to the CO a price proposal and obtain prior approval. Price proposals shall be submitted within fifteen (15) calendar days from the date the Contractor receives notice of the revision, supplement, or amendment giving rise to the increase in price of performance. Changes in the contract price due to supplements and amendments shall be considered under the FAR 52.212-4, Contract Terms and Conditions - Commercial Items clause. Failure of the Contractor to submit a price proposal within fifteen (15) calendar days from the date of receipt of any change, shall entitle the Government to performance in accordance with such change, at no increase in contract price.
INCLUDE/TAILOR AS APPLICABLE
1. DEPARTMENT OF DEFENSE DOCUMENTS.
DOCUMENT DATE TITLE PWS Ref DoD 5200.1-M 24 Feb 12, Incorporating
Change 1, 21 Mar 12 DoD Information Security Program
DoD 5200-2-R Jan 87, Incorporating Change 3, 23 Feb 96
Personnel Security Program
DoD 5220.22-R Dec 85, Industrial Security Regulation DoD 5400.7-R Sept 98, Incorporating
Change 1, 11 Apr 06 DoD Freedom of Information Act Program
5500.7-R Aug 93, Incorporating Change 3, 12 Dec 97
Joint Ethics Regulation
DD Form 254 Dec 99 DoD Contract Security Classification Specification
Copies of the above documents may be obtained from http://www.dtic.mil.
2. AIR FORCE INSTRUCTIONS (AFIs).
DOCUMENT DATE TITLE PWS Ref AFI 10-701 and
ACC SUP-I
08 Jun 11 Operations Security
AFI 31-101 8 Oct 09 Integrated Defense AFI 31-401 01 Nov 05 Information Security Program Management
AFI 31-501 27 Jan 05 Personnel Security Program Management
AFI 31-601 29 Jun 05 Industrial Security Program Management AFI 32-7086 1 Nov 04 Hazardous Material Management AFI 33-322 04 Jun 12 Records Management Program AFI 33-364 22 Dec 06 Records Disposition – Procedures and Responsibilities AFI 64-106 25 Mar 94 Air Force Industrial Labor Relations Activities AFI 63-138 21 May 13 Acquisition of Services AFI 91-203 15 Jun 12 Air Force Consolidated Occupational Safety Instruction AFI 91-204 24 Sep 08 Safety Investigations and Reports
Copies of AFIs can be obtained at: http://www.e-publishing.af.mil
3. OTHER AIR FORCE DOCUMENTS.
DOCUMENT DATE TITLE PWS Ref AFMAN 33-363 1 Mar 08 Management of Records AF Form 2586 01 Oct 98 Unescorted Entry Authorization Certificate
AF Form 3952 01 Mar 05 Chemical Hazardous Material Request Authorization Form
SF 312 Jan 00 Classified Information Nondisclosure Agreement Copies of above documents can be obtained at: http://www.e-publishing.af.mil
4. FEDERAL STANDARDS AND SPECIFICATIONS.
The following Safety references (Code of Federal Regulations (CFR)) are not intended to exclude any other references, but are intended to identify those Safety references which are most common to the efforts required by this PWS. The Contractor is required to abide by any and all applicable Federal, State, and local codes and safety requirements.
DOCUMENT DATE TITLE
OSHA CFR Title 29, Volume 6 Part 1910
Revised as of July 1, Occupational Safety and Health Standards
OSHA CFR Title 29, Volume 5 Part 1910.268
Revised as of July 1, Telecommunications
OSHA CFR Title 29, Volume 6 Part 1910.1001/1926.1101
Revised as of July 1, Asbestos
OSHA CFR Title 29, Volume 5 Part 1910.120
Revised as of July 1, Hazardous Waste Operation and Emergency Response
OSHA CFR Title 29 Volume 5 1910.146
Revised as of July 1, Permit-required Confined Spaces
OSHA CFR Title 29 Volume 5 Part 1910.147
Revised as of July 1, The Control of Hazardous energy (Lockout/Tagout)
OSHA CFR Title 29 Volume 6 Part 1910.1200
Revised as of July 1, Hazard Communications
OSHA CFR Title 29, Volume 8 Parts 1926.650, 651, and 652
Revised as of July 1, Excavation
Environmental Protection Agency (EPA) CFR Title 40, Volume 32, Parts 1500-1508
Revised as of July 1, Protection of Environment, Council on Environment Quality
EPA CFR Title 40, Volume 25, Parts 260, 261, 262, 263, 264, Revised as of July 1, Hazardous Waste Management System
CFR Title 47 Part 68 Revised as of October 1, 2009
Federal Communications Commission—Connection of Terminal Equipment to the Telephone Network
CFR Title 32, Part 989, Volume 6
Revised as of July 1, Air Force Environmental Impact Analysis Process
(EIAP)
Copies of the above documents may be obtained from www.gpoaccess.gov or http://www.access.gpo.gov/nara/cfr/cfr-table-search.html
5. PERTINENT WEB LINKS.
SITE WEB LINK PWS Ref Air Force Publications, Instructions & Forms http://www.e-publishing.af.mil Contractor Manpower Reporting Application http://www.ecmra.mil Contractor Performance Assessment Reporting System http://www.cpars.gov Federal Acquisition Regulation (FAR) http://farsite.hill.af.mil Occupational Safety & Health Administration (OSHA) https://www.osha.gov
1099244379C Typewritten Text List of Attachments:
Attachment 1 - Travel Pod Picture w/Part Number
| 2017-04-04T08:46:26-0400 | |
| TORMA.KRISTEN.M.1277535153 |
| 2017-05-08T14:08:25-0400 | |
| KANE.DANIEL.P.1012916732 |
File details come from the government source that posted it. Updated .