DRAFT MQT PWS 2.pdf
PDF 251 KB Posted
- Solicitation number
- FA480126MQTP001
About this file
This Performance Work Statement (PWS) details a Maintenance Qualification Training Program (MQTP) for F-16 aircraft maintenance personnel at Holloman Air Force Base, New Mexico. The contract requires a contractor to provide five total trainers: three F-16 Crew Chief trainers and two F-16 Avionics trainers, all with minimum 7-skill level qualifications and three years of F-16 experience. The training is divided into two phases for each specialty:
For F-16 Crew Chiefs, Phase I is conducted at Field Training Detachments during Right Time Training, with Phase II consisting of 18 days of academic instruction covering tasks like aircraft lubrication, towing, landing gear servicing, and component removal/installation. For F-16 Avionics technicians, Phase I is a five-day academic course, and Phase II involves 17 days of instruction covering wire maintenance, troubleshooting procedures, component removal/installation, test equipment usage, and comprehensive avionics systems training. The contract emphasizes maintaining a professional trainer-student relationship and requires detailed documentation of training progress and outcomes.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MQTP Sources Sought - FINAL.docx | DOCX document | |
| DRAFT MQTP PWS.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
MAINTENANCE QUALIFICATION TRAINING PROGRAM
(MQTP)
TRAINER SUPPORT
Holloman Air Force Base, NM
3 DECEMBER 2025
DRAFT
REVIEWED BY:
BRANDON M. SEPRINSKI, TSgt, USAF Date Contracting Officer Representative
49 MXG
CHRISTOPHER DUNSTON, Col, USAF Date Delegated Functional Commander
49th MXG
ANGEL CRAWFORD, Civ, DAF Date Quality Assurance Program Coordinator
49th CONS
ACCEPTED BY:
SALLY D. ROBERTS, Civ, DAF Date Contracting Officer 49th CONS
TABLE OF CONTENTS
Paragraph Page
1.0. DESCRIPTION OF SERVICES
2.0 SERVICES SUMMARY
3.0 GOVERNMENT FURNISHED PROPERTY/SERVICES/EQUIPMENT
4.0 GENERAL INFORMATION
5.0 APPENDICES
A. PHASE I CFETP TASKS/F-16 AVIONICS (2A3X4C) ................................ 2 pages
B. PHASE II CFETP TASKS/F-16 CREW CHIEFS (2A3X3M) ....................... 2 pages
C. PHASE II CFETP TASKS/F-16 AVIONICS (2A3X4C) ............................... 3 pages
1.0. DESCRIPTION OF SERVICES. The Contractor shall provide qualified maintenance personnel who can provide subject matter expertise, aircraft maintenance support, and upgrade (5-level) training to inexperienced F-16 aircraft maintenance technicians at Holloman Air Force Base (HAFB) in accordance with (IAW) all Department of Defense (DOD), Department of the Air Force (DAF), Air Education and Training Command (AETC), local, state of New Mexico, and Federal laws, instructions and regulations.
1.0.1. QUALIFICATIONS.
1.0.1.1. Trainers shall have the maintenance experience and communication skills necessary to provide a thorough understanding of the training objectives as set forth in the Performance Work Statement (PWS).
1.0.1.2. Trainers must complete the Air Force Trainer Course (AFTC) or comparable trainer course. The host unit will conduct the AFTC for Contracting company’s trainers if required.
1.0.1.3. Contractor shall provide evidence of trainer qualification to the Contracting Officer Representative (COR) (USAF or government training records (i.e. Career Field Education and Training Plan (CFETP), certification or other credible documentation).
1.0.1.4. Special Certification. Contractor personnel shall meet the requirements of and be maintained on the applicable unit Special Certification Roster (SCR) to clear Air Force Red-X discrepancies, In-Process Inspections (IPI), and all other tasks commensurate with an Air Force 7-skill level technician. Contractor Special Certification Roster requirements will mirror the corresponding Maintenance Group’s requirements. Contractor Site/Team Lead will review employee’s qualifications prior to recommending addition/removal to/from the SCR and initiate AETC Form 64 Request for Placement on Special Certification Roster for special certification items IAW DAFI 21-101_AETCSUP, Aircraft and Equipment Maintenance Management.
1.0.1.5. Unauthorized Employees. Contractor shall not employ a person for work on this contract if such employee is identified to Contractor by the Contracting Officer (CO) or COR as a potential threat to the health, safety, or general well-being of any personnel and/or the operational mission.
1.1. F-16 CREW CHIEF INSTRUCTORS. The Contractor shall provide three (3) F-16 Crew Chief trainers with skills equivalent to the Air Force Craftsman (7-skill level) (Reference DAFMAN 36-2689) in a like position/system on the F-16 and a minimum of three (3) years’ experience in the respective specialty on the F-16, to provide training as follows:
1.1.1. Phase I Training F-16 Crew Chief (2A3X3M): Phase I training for F-16 Crew Chiefs is conducted at Field Training Detachments during Right Time Training. Trainees will be scheduled to attend Phase II upon graduation of Right Time Training, by the Unit Training Manager or Maintenance Qualification Training Program Scheduler.
1.1.2. Phase II Training F-16 Crew Chief (2A3X3M): Training consists of 18 days of academic instruction, with an instructor-to-student ratio of 1 instructor for up to 4 students. Training includes Aircraft Lubrication, Tripod Jacking, Aircraft Towing, Landing Gear Component
Removal/Installation/Servicing, Flight Control Component Removal/Installation, Aircraft Servicing (Hydraulic/Oil/Fuel/ Nitrogen/Liquid Oxygen), External Tanks Removal/Installation/Operational Checkout, and other miscellaneous component removal/installation. Training includes: 5-level core tasks in CFETP (See Appendix B for the corresponding CFETP tasks. Approved plans of instruction (POIs) are primary source documents for course instruction).
1.1.2.1. Contracted company will teach the following areas during the first week of the training:
• Hazardous Materials Usage and Handling
• Technical Order Usage
• Flightline Safety Precautions
• Tool Accountability
• Introduction to Aircraft/Airframe
• Safe for Maintenance
• Forms Documentation
• IMDS
• Launch/Recover B-Man and Marshalling
• Wing/Tail Walker Duties
• Removal/Installation of Panels and Radome
• External Electrical / External Hydraulic Power Application
1.1.3. Team Lead: One member of the Crew Chief Instruction Team will serve as Site/Team Lead. This position will provide oversight for the rest of the contracted instructors, ensuring that they remain current with all applicable training requirements (i.e. special certifications, Air Force Trainer Course, Security Phase 2 training) and any other initial and recurring training listed in DAFI 21-101 that are required for operating on the flightline.
1.2. F-16 AVIONICS INSTRUCTORS. The Contractor shall provide two (2) F-16 Avionics trainers with skills equivalent to the Air Force Craftsman (7-skill level) (Reference DAFMAN 36-2689) in a like position/system on the F-16 and a minimum of three (3) years’ experience in the respective specialty on the F-16 to provide training as follows:
1.2.1. Phase I Training F-16 Avionics (2A3X4C): Training consists of five days of academic instruction for F-16 Avionics personnel, with an instructor-to-student ratio of 1 instructor for up to 4 students. (See Appendix A for the corresponding CFETP tasks. Approved POIs are primary source document for course instruction).
1.2.2. Phase II Training F-16 Avionics (2A3X4C): Training consists of 17 days of academic instruction, with an instructor-to-student ratio of 1 instructor for up to 4 students. Training includes: 5-level core tasks in CFETP (See Appendix C for the corresponding CFETP tasks.
Approved POIs are primary source documents for course instruction).
1.3. TRAINER AND STUDENT RELATIONSHIP. The Contractor shall require trainers to present themselves as positive role models for students. Trainers shall develop and always maintain a positive, professional trainer-student relationship. Unacceptable techniques may include, but are not limited to fear, sarcasm, ridicule, use of inappropriate or offensive language, or any other verbal or nonverbal communication intended to demean or harass the student or any demographic group.
1.4. DOCUMENTATION. The Contractor shall prepare all related correspondence and operating reports. All documentation, records, schedules, etc., as described in this PWS that are the responsibility of the Contractor are the property of the Government and shall remain so even upon termination of the contract. The Contractor shall keep these items current at all times.
Documentation and records shall be turned over to the Government upon completion of the contract or when requested by the COR. The Contractor shall maintain on site records of all quality control inspections conducted by Contractor personnel. Records shall include the name of the inspector, date of inspection, what was inspected, discrepancies found, corrective action taken, and date of corrective action. This documentation shall be made available to the Government during the term of the contract and at regular COR visits to the site. The Contractor shall maintain copies of all records on site throughout the contract performance period and for the period after contract completion until final settlement of any claims under this contract.
1.4.1. REQUIRED DOCUMENTATION. The Contractor shall prepare, as a minimum, the following documentation and/or reports:
1.4.1.1. Weekly class report. The Contractor shall prepare a summary of progress following each week of training. This summary shall include any attendance, discipline or other issues which could require address, as well as information on any delays in learning which could preclude a successful completion of the course.
1.4.1.2. Final class report. The Contractor shall prepare a summary of the final outcome of each class, indicating pass and fail.
2.0. SERVICES SUMMARY.
2.1. Contractor shall be responsible for conducting upgrade training IAW the performance standards identified in Department of Air Force Manual 36-2689, Training Program, Air Force Enlisted Classification Directory (AFECD) and the applicable Air Force Specialty Code (AFSC), CFETPs, Specialty Training Standard (STS) and Mission Design Series (MDS) attachments.
Knowledge objectives shall be measured, documented, and demonstrated by students to the level of skill required by the POI. Contractor shall provide supplemental academic training lectures, discussions, and hands-on training in order to satisfy course objectives. Task progression will be documented in AF Form 623 (or electronic equivalent). Written examinations and progress checks shall be administered to verify the student has gained knowledge as instructed. Examination and progress checks will be documented on AF Form 623a (or electronic equivalent). Contractor shall assist the students with their Career Development Course (CDC) Volumes (if applicable). If CDC assistance is provided, document progress on AF Form 623a (or electronic equivalent).
Performance Objective (PO) PWS Para Performance Threshold PO-1 5-Level Certification of F-16 Crew Chiefs. 1.1. No more than 1 failure per class period.
Provide all necessary upgrade training, through classroom and hands-on training to achieve 5-level certification.
PO-2 5-Level Certification of F-16 Avionics Technicians.
Provide all necessary upgrade training, through classroom and hands-on training to achieve 5-level certification.
1.2. No more than 1 failure per class
period.
3.0. GOVERNMENT FURNISHED PROPERTY/SERVICES/EQUIPMENT.
3.1. Classroom/Office: The Government shall provide desks, workspace, classrooms, utilities, electrical power hookups, computers, telephone access, administrative supplies for on-site personnel, and all audiovisual projection equipment. Contractor personnel must follow the standard facility rules and regulations required of government personnel.
3.2. Information Technology Assets (ITA). The Government will furnish all computers and computer related equipment to access Government related information systems. Contractor shall not modify or delete any Government files/programs without the approval of the COR. All Government provided computer/equipment shall only be used for performance of this contract.
3.2.1. Local Area Network (LAN) Access. IAW Air Force Instruction 33-119, Contractor personnel using unclassified automated information systems that have access to sensitive information must possess, at a minimum, a National Agency Check (NAC) or Entrance National Agency Check IAW Department of Defense 5200.2-R, Personnel Security Program, or screening IAW Air Force Instruction 31-501, paragraph 3.27. Through Local Area Network access, the Government will provide “Unclassified” intranet and internet access for accomplishment of work in support of this PWS.
3.2.2. Computer Security. Contractor shall maintain computer systems security integrity IAW the Air Force Computer Security (COMPUSEC) program [Air Force Systems Security Instruction (AFSSI 5102) The Computer Security (COMPUSEC) for Operational Systems].
Contractor personnel will be required to successfully complete testing IAW Air Force Instruction 33-200 Information Assurance (IA) Management prior to being allowed access to government computers.
3.2.3. Telephone Services. The Government shall provide official telephone service, including telephone equipment and lines for Defense Switching Network, (DSN) local and long-distance calls. They will provide maintenance service on all telephone lines. Government provided lines shall be used for official calls only.
3.3. Training Materials. Materials, equipment and data for training will be provided by the Government. The Government will be responsible for the compilation, content, quality and accuracy/reliability of all training course materials and documents used to conduct all training.
Host unit will train contracted trainers on the purpose and use of the maintenance information system (MIS). Contracted trainers will use the MIS to document training and to annotate any and all training deficiencies/interruptions, etc.
3.4. Tools/Hands-On Training. The Government will provide all required tools and support equipment required to perform maintenance training tasks on the F-16 aircraft via the unit support section. Contractor/personal tools are prohibited, unless specifically requested and controlled IAW applicable Air Force Instructions and local procedures. Contractor personnel must follow the standard tool management and facility rules and regulations required of government personnel.
3.5. Vehicles. General and special purpose vehicles authorized and assigned to Air Force unit(s) involved will be made available for Contractor use as necessary to accomplish this PWS.
Contractor shall ensure all use guidelines are followed pertaining to government vehicles including but not limited to Air Force Instruction 23-302, Section 7B Operator's Inspection Guide and Trouble Report Forms and Air Force Manual 24-306(I) Manual For The Wheeled Vehicle Operator. Any vehicle requirements deemed solely for Contractor use will be at Contractor expense to acquire, maintain, fuel, replace and dispose of.
3.6. Government Furnished Information. The Government will furnish or make available to Contractor any document deemed necessary by the Government to comply with this contract.
4.0. GENERAL INFORMATION.
4.1. QUALITY ASSURANCE. The Government will conduct surveillance on the Contractor’s performance under this contract by way of a COR. The Government will record all surveillance observations. When an observation indicates defective performance, the COR will require the Site/Team Lead to initial the observation indicating acknowledgment of deficiency. The initialing of the observation does not necessarily constitute Contractor concurrence with the observation, only acknowledgment that the Contractor has been made aware of the defective performance. Government surveillance of tasks not listed in the Services Summary (SS) or by methods other than those listed in the SS may occur during the performance period of this contract. Such surveillance will be done according to standard inspection procedures of other contract provisions. Any action taken by the Contracting Officer (CO) as a result of surveillance will be in accordance to the terms of this contract.
4.2. CONTRACTOR FULL-TIME EQUIVALENT REPORTING
The Contractor shall report ALL Contractor labor hours (including sub-contractor labor hours) required for performance of services provided under this contract for HAFB, NM via a secure data collection site. The Contractor is required to completely fill in all required data fields at http://www.ecmra.mil. This site is the electronic Contractor Manpower Reporting Application
(CMRA).
Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be http://www.ecmra.mil/ reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the CMRA help desk.
*Reporting Period: Contractors are required to input data by 31 October of each year.
Uses and Safeguarding of Information: Information from the secure web site is considered to be proprietary in nature when the contract number and Contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the Contractor name and contract number associated with the data.
User Manuals: Data for Air Force service requirements must be input at the Air Force CMRA link. However, user manuals for government personnel and Contractors are available at the Army CMRA link at http://www.ecmra.mil.
4.3. PERFORMANCE EVALUATION MEETINGS. The Site/Team Lead may be required to meet at least weekly with the COR and the CO during the first month of the contract.
Subsequent meetings will be on a quarterly basis and/or as needed. The written minutes of all performance evaluation meetings shall be prepared by the Government. Should the Contractor non-concur with the minutes; the Contractor shall so state any areas of non-concurrence in writing to the CO within 3 working days of receipt of the signed minutes. The minutes will be included in the contract file.
4.4. GOVERNMENT REMEDIES. The CO shall follow FAR 52.212-4, Contract Terms and Conditions-Commercial Items, for Contractor’s failure to perform satisfactory services or failure to correct non-conforming services.
4.5. SECURITY REQUIREMENTS. HAFB is a closed military installation. The Air Force reserves the right to establish criteria for entry of all personnel, vehicles, and equipment on to HAFB. Access to the base may be further restricted as deemed necessary by the 49th Wing Commander (49 WG/CC) or his/her designee. Delays resulting from restricted access to HAFB will not be the basis for a claim by the Contractor when the 49 WG/CC or his/her designee deems that such changes are necessary to protect the security of HAFB.
4.6. CONTRACTOR EMPLOYEES. Contractor shall not employ any person who is an employee of the U.S. Government if employing that person would create a conflict of interest.
Additionally, Contractor shall not employ any person who is an employee of the Department of the Air Force, either military or civilian, unless such person seeks and receives approval according to Department of Defense Directive 5500.7-R, Standards of Conduct, subsection
3601.107. Contractor shall not employ any person who is an employee of the Department of the Air Force if such employment would be contrary to the policies in Air Force Instruction 64-106, Air Force Industrial Labor Relations Activities. Contractor personnel shall readily identify themselves as contractors in correspondence, telephone conversations, and in meetings they attend IAW Air Force Instruction 33-119, Air Force Messaging.
4.6.1. Appearance. Employees are expected to comply with reasonable dress and grooming standards based on comfort, productivity, health, and type of positions occupied. Contractor http://www.ecmra.mil/ shall furnish a work uniform, (shirt and designated color slacks and footwear) which will facilitate its employees being easily recognized as Contractor employees. These uniforms will be free of patches, emblems or writing except they shall incorporate a corporate name or logo.
They shall fit properly, be kept serviceable at all times, and not present a Foreign Object Damage hazard. They shall be neat, clean, free of stains or discoloration, and without holes or tears. If a utility uniform is desired, they shall incorporate a corporate name or logo. Contractor employees shall not attach, affix or display objects, articles, jewelry or ornamentation through the ear, nose, tongue, or any other body part when performing work on the flight line or industrial areas, as such objects, jewelry or ornamentation could pose a safety problem or present a Foreign Object Damage hazard.
4.6.2. Employees shall be issued identification badges, which include, as a minimum, the person’s name, picture, and the Contractor name or logo. Contractor employees shall wear these badges whenever on duty at any government installation. In a case where badges may be a hazard, instead of wearing them, the employee will have them on their person at all times.
4.6.3. Language. All Contractor personnel working on this PWS must be able to read, write, speak, and understand English fluently.
4.6.4. Drug Testing. Contractor employees shall be subject to substance abuse testing as a result of an Air Force Instruction 91-204, Safety Investigations and Reports investigation when an individual’s actions or inactions are suspected as factors in a mishap sequence. Contractor shall accomplish the specified testing using a certified (i.e., a certified lab that meets Department of Health and Human Services (DHHS)/ Substance Abuse and Mental Health Services Administration (SAMHSA) certification) medical substance abuse testing facility. Results of the test(s) shall be provided to the Government solely for the purpose of completing an investigation IAW Air Force Instruction 91-204.
4.6.5. Environmental Protection. Contractor shall comply with all Federal, State, and local laws pertaining to environmental protection. Any violation of laws or Department of Defense Guidance, or of Contracting company’s own Environmental Protection Plan, will be identified to the COR immediately.
4.6.6. Illegal Aliens. The Contractor shall not hire an illegal alien to work or perform any service on Holloman AFB (HAFB). Employees who are not U.S. citizens can only be persons possessing a current resident alien immigrant status (Green Card) or if a non-resident immigrant must possess a current Employment Authorization Document. While on HAFB, non-U.S. citizen employees must be able to produce for inspection the appropriate credential: Green Card or Employment Authorization Document. Any illegal alien found on the installation shall be immediately detained by the base security forces and barred from the installation.
4.7. LISTING OF EMPLOYEES. The Contractor shall maintain a current listing of employees that require access to HAFB. The list shall include the employee's name, social security number and type of investigation if contract work involves unescorted entry to Air Force restricted areas or other sensitive areas designated by the installation commander. The list shall be provided to the COR, sponsoring agency unit security manager, and CO. An updated listing shall be provided when an employee's status or information changes (i.e. terminated for cause, reassignment, retirement, etc.) or when a new employee is added.
4.7.1. Pass and Identification Items. The Contractor shall ensure the pass and identification items required for contract performance are obtained for employees and non-Government owned vehicles. Contractor employees shall only be granted access to the installation to perform functions directly related to their respective contract.
4.7.1.1. The Contractor shall ensure all employees are identified on a HAFB Visit Access Request (VAR). The Contractor shall submit VARs through the CO to the 49th Security Forces Squadron (49 SFS) Pass and Registration Office; VARs must be submitted no later than 7-duty/business days, and for foreign nationals, 14-duty/business days, prior to requiring access to HAFB. Recommend putting foreign nationals on a separate VAR.
4.7.1.2. Retrieving Identification Media. The Contractor shall retrieve all identification media and/or visitor passes from employees who depart for any reason before the contract expires (i.e.
terminated for cause, reassignment, retirement). The Contractor will notify the Government within 24 hours when unable to retrieve identification media from contract employees.
4.8. TRAFFIC LAWS. The Contractor and its employees shall comply with base traffic regulations. Traffic regulations include, but are not limited to:
4.8.1. Contractor employees shall wear a seatbelt when operating or riding in any military, company, or privately-owned vehicle while on the installation.
4.8.2. Speed limits on HAFB are 30 MPH unless otherwise posted. Be aware of reduced speed limits when driving in the housing and school zones.
4.8.3. All vehicle operators shall not use cell phones unless the vehicle is safely parked or unless they are using a hands-free device. The wearing of any other portable headphones, earphones, or other listening devices (except for hands-free cellular phones) while operating a motor vehicle is prohibited. Penalty: Privileges to operate a motor vehicle while on the installation may be suspended for 5 days, effective the first day after receipt of notice.
4.9. WEAPONS, FIREARMS AND AMMUNITION. Contractor employees are prohibited from possessing weapons, firearms, or ammunition on themselves or within their government, company, or private-owned vehicle while on HAFB.
4.10. RECORDS.
4.10.1. For Official Use Only (FOUO). The Contractor shall comply with DoDM 5200.01- V4/E3, DoD Information Security Program: Controlled Unclassified Information (CUI), requirements. This manual sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
4.10.2. Records Management (RM) (2017). Records Management (RM) (June 2017). The Contractor shall provide accountability and ensure all records and documents generated during the period of this contract are made available to the government at all times. All information may be maintained electronically. All publications and forms will be available for Contractor's use through the Holloman Publications Web Site. Any publications or forms that are required for the performance of this contract and are not available electronically are required to be maintained manually.
4.10.3..Freedom of Information Act (FOIA) and Privacy Act (PA) (2017). The Contractor shall comply with DoDM 5400.7, DOD Freedom of Information Act (FOIA) Program, DoD5400- R_AFMAN 33-302 and AFI 33-332, Air Force Privacy and Civil Liberties Program. These regulations set policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding Personally Identifiable Information (PII) material.
4.10.4. Contractor Records (June 2017). The Contractor shall maintain all government records IAW AFMAN 33-363, Management of Records, paragraph 6.4., Contractor Support, in order to support the COR who is responsible for all lifecycle record management and all duties assigned to the organization's Record Professional (RP) (Tier-1 (T-1)). [AFI 33-360, Publications and Forms Management, Table 1.1 outlines description of the authorities for T-1.]
4.11. REPORTING REQUIREMENTS. Contractor personnel shall report the appropriate authority any information or circumstances of which they are aware which may pose a threat to the security of DoD personnel, Contractor personnel, resources, and classified or unclassified defense information. Employees shall be briefed by their immediate supervisor upon initial on-base assignment.
4.11.1. Physical Security. The Contractor shall be responsible for safeguarding all Government property and controlled forms provided for Contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.
4.11.2. Anti-Terrorism (AT) Awareness Level I Training. Antiterrorism (AT) Awareness Level I Training. This is for Contractor employees with an area of performance within a Government controlled installation, facility or area. All Contractor employees, including subcontractor employees, requiring access to Government Installations, Facilities and Controlled Access areas shall complete AT Level I awareness training within ten (10) calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Certificates of completion for each affected Contractor employee and subcontractor employee will be maintained by the COR or sponsoring Antiterrorism Representative. AT level I Awareness Training is available at the following website: http://jki.jten.mil or if have received ID/CAC, training can be taken at Advanced Distributed Learning Service (ADLS) at https://golearn.adls.af.mil/kc/main/kc_frame.asp?bInWhatsNew=Ture [At ADLS: go to Course List, Total Force Awareness Training (TFAT), select *Force Protection (ZZ133079)
4.12. ESSENTIAL SERVICES. The services under this task order are essential for performance during crisis according to Department of Defense Instruction 3020.37.
https://golearn.adls.af.mil/kc/main/kc_frame.asp?bInWhatsNew=Ture
5.0. APPENDICES.
APPENDIX A: PHASE I CFETP TASKS/F-16 AVIONICS (2A3X4C)
COURSE CONTENT: F-16 AVIONICS PHASE I
1. WELCOME/ORIENTATION
2. Flightline Safety Precautions High Intensity Sound Inspection and Use of Fire Extinguishers Hazards and AFOSH standards of AFSC 2A3X4 Hazardous Materials Usage and Handling
3. PERSONNEL DUTIES/RESPONSIBILITIES TR: DAFI 21-101
Expediter Production Superintendent Flight Chief Debrief Supervise Maintenance Actions Maintain Training Records OJT Trainer Requirements
4. INTRODUCTION TO AIRCRAFT/AIRFRAME
F-16 General Overview/Characteristics Aircraft Safe For Maintenance Danger Areas Avionics Bay (Panel Chart)
5. TECHNICAL ORDERS / TOOLS / EQUIPMENT USAGE
Navigate electronic T.O. to locate MX tasks Follow Technical Orders Use Wiring Diagrams (T.O.s) Composite Tool Kit Inventory (Tool Accountability) Proper Use of Digital Multimeter (Megohm meter)
6. AIRCRAFT/EQUIPMENT FORMS DOCUMENTATION
00-20-1 Overview AFTO Form 781A Warning Tags AFTO Form 781B AFTO Form 781C AFTO Form 781F AFTO Form 781H AFTO Form 781J AFTO Form 781K AFTO Form 244/245 AFTO Form 350
7. SUPPLY DISCIPLINE
Repair Cycle Asset Program (e.g. Condition Tags, DIFM, PQDR) Purpose of Joint Deficiency Reporting System Complete Deficiency Reports
Report Software Deficiencies Property Accountability and Responsibility Priority System Issue/Turn-In Requests
8. IMDS
00-20-2 Overview Job Data Documentation Identify Historical Records (Form 95) Configuration Management (Aircraft/Equipment Records) Supply Transactions Maintenance Transactions Purpose of Joint Deficiency Reporting System
9. GENERAL AIRCRAFT MAINTENANCE TASKS
Wing/Tail Walker Duties Removal/Installation of Panels and Radome External Electrical/Hydraulic Power Application Launch/Recovery (B-man) and Aircraft Marshalling
APPENDIX B: PHASE II CFETP TASKS/F-16 CREW CHIEFS (2A3X3M)
COURSE CONTENT: F-16 CREW CHIEF PHASE II
2. AIRCRAFT GENERAL
Lubricate Aircraft (-12JG) Tow Member Tripod Jacking Remove/Install Panels and Stress Panels
3. INSPECTIONS
Engine Bay Throttle Inspection
4. LANDING GEAR SYSTEM
Remove/Install Spin stop pad Remove/Install MLG Brake Assembly Remove/Install Arresting Hook Shank Bumper Service Shock Strut Alternate Servicing landing gear/arresting hook pneumatic reservoir Landing Gear Operational Checkout
5. UTILITIES
Service Liquid Oxygen (LOX) Remove/install LOX converter
6. FLIGHT CONTROL SYSTEM
Remove/install torque shaft Service Flight control accumulator
7. HYDRAULIC POWER SYSTEM
Remove/Install filter/assembly Remove/Install Differential Pressure indicators (Delta P) Service Reservoir Accumulator Service Engine Operating Perform General Bleed and Leak Check
8. ENGINE SYSTEM
Inspect Magnetic Chip Detectors
9. FUEL SYSTEM
Remove/Install Wing Tank Assembly Remove/Install Centerline Tank Defuel Aircraft Over-the-Wing Refuel External Transfer Operational Checkout
10. ELECTRICAL SYSTEM
Connect/Apply/Disconnect External Power Remove/Install Aircraft Battery Remove/Install Exterior Light Lenses/Lamps Operate Exterior Lighting
Service Constant Speed Drive (CSD)
11. ACCESSORY DRIVE AND ENGINE START SYSTEM
Remove/Install Jet Fuel Starter (JFS) Remove/Install Power Take-Off (PTO) Shaft Service JFS Emergency Brake Accumulator Service ADG Oil
12. EMERGENCY POWER UNIT (EPU) SYSTEM
Remove/Install Leak Detector Pellet Service EPU Nitrogen Service EPU Oil
13. SUPPORT EQUIPMENT
Perform Pre-Use Inspection and Operate Aircraft Tow Bar Perform Pre-Use Inspection and Operate Fuel Tank Installation and Removal Dollies Perform Pre-Use Inspection and Operate Fuel Tank Removal and Installation Stores Loader Perform Pre-Use Inspection and Operate Hydraulic Test Stand Perform Pre-Use Inspection and Operate Hydraulic Servicing Carts Perform Pre-Use Inspection and Operate LOX Servicing Equipment Perform Pre-Use Inspection and Operate Diesel Air Compressor Perform Pre-Use Inspection and Operate Fuselage Jacks
APPENDIX C: PHASE II CFETP TASKS/F-16 AVIONICS (2A3X4C)
COURSE CONTENT: F-16 AVIONICS PHASE II
2. WIRE MAINTENANCE TR: Applicable Training Directives Bundling (Routing, Clamps) Continuity Checks Video Splicing Clean Fiber Optics (As Applicable) Use Wire Repair Kit(s) Repair/Replace/Inspect Aircraft Wiring Connectors Wire Lacing
3. FUNDAMENTAL TROUBLESHOOTING PROCEDURES TR: Applicable Aircraft Technical Orders/General System (GS)/General Vehicle (GV) Manuals Purpose and Use of Technical Date Types (e.g. E., SD, WD, FI, TS, GS) Interpreting Bit/Malfunction Codes Isolate System Malfunction Codes Using Fault Trees Trace System Diagrams Isolate Wire Open/Wire Short/Voltage Fault On Multipin Connector Harness Isolate Wire Short Isolate Voltage Fault On Multipin Connector Harness Isolate Crossed Connection on Multipin Connector Harness Isolate Data Bus Malfunctions (e.g. MLD-STD-1553, High Speed Data Bus) Perform OFP Load/Verify Procedures Configure OFP Loading Equipment (e.g. CAPRE/VIPER) Protect Exposed Electrical Connectors and Open Pressure Lines
4. REMOVE AND INSTALL COMPONENTS
Shock Mounted Components Equipment Mounted Minor Parts and Hardware (e.g. Relays, Switches, Bulbs, Circuit Breakers, Batteries, Desiccants) Chassis Mounted Instrument Panel Mounted Tray Mounted Components Rack Mounted Components Console Mounted Components Aircraft Surface Mounted Components Clamp Mounted Components Bezel Mounted Components Latch Mounted Components Bulkhead Mounted Line Replaceable Modules (LRMS)/Circuit Cards
5. USE TEST EQUIPMENT TR: Applicable Aircraft Technical Orders/General System (GS)/General Vehicle (GV) Manuals Air Data Tester (TTU-205/ADTS-415) Joint Service Electronic Combat Systems Test Set (JSECST) Or Equivalent Aeroflex Radio Test Set/IFR-4000 IFF Tester 4530/4530A
6. PODs (SNIPER/REECE/HTS/EIIRST): Applicable Aircraft Technical Orders/General System (GS)/General Vehicle (GV) Manuals
Theory of Operation Operational Checkout Upload OFP/Download Faults Remove/Install 100-Series LRU(S) Upload/Download Pod and/or Pylon
7. F-16 TEST/SUPPORT EQUIPMENT
Reprogramming Equipment (I.E. VIPER/CAPRE) Upload Mission Data File (MDF)/Download Flight Data Fuel System Tester Chaff/Flare 288 Tester
PLM-4
8. BORESIGHT
Angle of Attach (AOA) Transmitter Mount
9. APG-68 FIRE CONTROL RADAR
Theory of Operation Perform Operational Checkout Remove/Install Dual Mode Transmitter (DMT) Remove/Install FCR Antenna Perform Waveguide Pressure Check
10. F-16 THROTTLE GRIP ASSEMBLY TR: Applicable Airframe Technical Orders Perform Operational Checkout Remove/Install Throttle Grip
11. F-16 AVIONICS SYSTEMS
F-16 Situational Awareness Data Link (SADL) Theory of Operation SADL Operational Checkout F-16 Multifunction Information Distribution System (MIDS/JTRS) LINK 16/Tactical Air Navigation System (TACAN) Theory of Operation LINK 16 Operational Checkout TACAN Operational Checkout Instrument Landing System (ILS) Theory of Operation (optional if completed during FTD course) ILS Operational Checkout (optional if completed during FTD course) Identification Friend or Foe (IFF)Theory of Operation (optional if completed during FTD course) IFF Operational Checkout (optional if completed during FTD course)
F-16 Multiplex Bus Theory of Operation F-16 Digital Video Recorder (DVR) Theory of Operation DVR Operational Checkout
12. F-16 FLIGHT CONTROL SYSTEM (FLCS)/DIGITAL FLIGHT CONTROL SYSTEM
(DFLCS)
Analog/Digital System Theory of Operation Operational Checkout/Bit Remove/Install Side Stick FLCS Power (Primary/Alternate) F-16 FLCS Seat Data Recorder (SDR) Theory of Operation SDR Operational Checkout
13. F-16 PRIMARY/ALTERNATE ATTITUDE AND DIRECTION INDICATION
F-16 Attitude Director Indicator Theory of Operation (optional if completed during FTD course) F-16 Electronic Horizontal Situation Indicator Theory of Operation (optional if completed during FTD course) F-16 Electronic Horizontal Situation Indicator Operational Checkout (optional if completed during FTD course) F-16 Standby Attitude Indicator (SAI) Theory of Operation F-16 Direct Reading (STANDBY) Compass Theory of Operation
14. F-16 PENETRATION AIDS
JSECST RWR Test and Line Sweeps (Group A/B) F-16 Countermeasures Set (CMS) (ALQ-213) Theory of Operation F-16 Advanced Interference Blanker System Theory of Operation
15. F-16 COMMUNICATION SYSTEMS (optional if completed during FTD course) F-16 Very-High Frequency (VHF) Theory of Operation VHF Operational Checkout F-16 AN/ARC-210 Multiband Radio System Theory of Operation F-16 AN/ARC-210 Multiband Radio System Operational Checkout
| PERFORMANCE WORK STATEMENT |
| 3.0. GOVERNMENT FURNISHED PROPERTY/SERVICES/EQUIPMENT. |
| 3.1. Classroom/Office: The Government shall provide desks, workspace, classrooms, utilities, electrical power hookups, computers, telephone access, administrative supplies for on-site personnel, and all audiovisual projection equipment. Contractor ... |
| 3.2. Information Technology Assets (ITA). The Government will furnish all computers and computer related equipment to access Government related information systems. Contractor shall not modify or delete any Government files/programs without the app... |
| 3.2.1. Local Area Network (LAN) Access. IAW Air Force Instruction 33-119, Contractor personnel using unclassified automated information systems that have access to sensitive information must possess, at a minimum, a National Agency Check (NAC) or En... |
| 3.2.2. Computer Security. Contractor shall maintain computer systems security integrity IAW the Air Force Computer Security (COMPUSEC) program [Air Force Systems Security Instruction (AFSSI 5102) The Computer Security (COMPUSEC) for Operational Syst... |
| 3.2.3. Telephone Services. The Government shall provide official telephone service, including telephone equipment and lines for Defense Switching Network, (DSN) local and long-distance calls. They will provide maintenance service on all telephone l... |
| 3.3. Training Materials. Materials, equipment and data for training will be provided by the Government. The Government will be responsible for the compilation, content, quality and accuracy/reliability of all training course materials and documents... |
| 3.4. Tools/Hands-On Training. The Government will provide all required tools and support equipment required to perform maintenance training tasks on the F-16 aircraft via the unit support section. Contractor/personal tools are prohibited, unless sp... |
| 3.5. Vehicles. General and special purpose vehicles authorized and assigned to Air Force unit(s) involved will be made available for Contractor use as necessary to accomplish this PWS. Contractor shall ensure all use guidelines are followed pertain... |
| 3.6. Government Furnished Information. The Government will furnish or make available to Contractor any document deemed necessary by the Government to comply with this contract. |
File details come from the government source that posted it. Updated .