This document is a Questions and Answers (Q&A) file for Solicitation KWRD 23-0052, dated 05 August 2025, related to an A-E Design Repair project for a Corrosion Control Facility B898. The Q&A addresses a specific inquiry about cost estimation methods for the Air Force project. The government response clarifies that PACES (Parametric Cost Estimating System) is required to meet AFCEC certification requirements, particularly when detailed design information is limited. While some Air Force statements of work offer MII (Military Installation Infrastructure) as an option, this solicitation mandates PACES as the default cost estimator. The document provides a template for potential additional questions, though in this instance only one question is documented.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions for KWRD 23-0052 A-E Design Repair Corrosion Control Facility B898
05 August 2025
Section Para.
Many of the SOWs that we see for Air Force work give us the option of MII or PACES. Can use MII instead?
Unfortunately, the cost estimate is required to be prepared using PACES to meet AFCEC certification requirements. But, Parametric Cost Estimating: PACES is used for preparing parametric construction cost estimates, especially when there's limited or no detailed design information available. MCASES 2nd
Generation is used for more detailed cost estimates. Therefore, PACES is the default estimator, particularly when details are not established.
SOO/SOW Reference (Optional) QUESTION GOVERNMENT RESPONSE