SOW.docx

DOCX document 15 KB Posted

Attached to
ECP Arm Drop Holloman AFB
Solicitation number
FA480124Q0479
Issued by

About this file

This document is a Statement of Work (SOW) for the purchase and installation of a vehicle control device at Holloman Air Force Base. The key requirements are:

The device must span a 24-foot distance, be self-powered by solar energy, have multiple remote capabilities with a range of over 1,000 feet, and be non-permanent. The barrier must meet ASTM standard F-2656-07 at the M50-P3 level. The contractor is responsible for freight delivery, a white glove delivery and installation, and cleanup. The contractor will work independently with minimal government assistance. The contract period is for the standard one-year manufacturer's warranty. The solicitation number is FA480124Q0479, issued by the Department of the Air Force Air Combat Command.

View the file

Other files

File Type Posted
Combined Synopsis_Solicitation ECP drop Arm.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

ECP Drop Arm

29 JULY 2024

General Requirements:

1. This requirement is for a Vehicle control device that must span a 24' distance, be self-powered (solar), have multiple remote capabilities with reach of over 1000' and be non-permanent. Barrier must meet the ASTM standard F-2656-07 of M50-P3. Only standard manufacturing 1 year warranty. Or equal.

2. The contractor is responsible for Freight to Holloman AFB, NM. Contractor must provide two week notice prior to shipping to include tracking number and point of contact (POC) telephone number.

3. The Contractor is responsible for a white glove delivery and installation.

4. Call POC at least 30 days prior to installation to obtain visitor pass information.

5. The Contractor is expected to work independently with minimal assistance from the Government.

6. The Contractor shall repair any damage caused by his operations.

7. The Contractor shall furnish all labor, tools transportation and equipment necessary to accomplish the work.

8. The Contractor will also be responsible for all equipment and trash removal that is needed to complete the task.

9. The Contractor shall perform a complete cleanup of the work area after the work is complete.

10. The hours of operation to perform this project will be 0700-1600 Monday thru Friday. Closed on all Federal Holidays.

File details come from the government source that posted it. Updated .