Salient Characteristics.docx
DOCX document 30 KB Posted
- Attached to
- 250 KVA Transformer Holloman AFB, NM
- Solicitation number
- FA480124Q0449
About this file
This document is a Requirements Document for a 250 kVA pad mount transformer to support the 635 Materiel Maintenance Squadron at Holloman Air Force Base. The transformer is required to charge 14 airfield lighting assets valued at $21M in Building 931. Key requirements include a 3-phase, 60 Hz, mineral oil-cooled transformer with a primary voltage of 13.2 kV and a secondary voltage of 208Y/120 V. The contractor shall deliver the transformer no later than 61 weeks after the order is placed. The delivery location is 1273 Bear Path Rd, B901, Holloman AFB 88330. This requirement is associated with Solicitation Number FA480124Q0449 for a 250 kVA Transformer at Holloman AFB, NM, issued by the Department of the Air Force Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combined Synopsis_Solicitation.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BEAR BASE TRANSFORMER
Requirements Document for 635 Materiel Maintenance Squadron 5 June 2024
1.0 PURPOSE
635 Materiel Maintenance Squadron mission is to provide flexible and responsive resources and expertise to support the Nation’s priorities. This new transformer is required to support the charging requirements for 14 airfield lighting assets valued at $21M in Building 931 and will need to have preventive maintenance done periodically.
2.0 SCOPE
The Contractor shall deliver one (1) pad mount transformer to meet the following requirements:
TRANSFORMER
Designation: Step-Down Operation (Not Approved for Step-Up) Product type: New DOE Complaint: No
ELECTRICAL PARAMETERS
kVA: 250 Phase: 3 Frequency: 60 Hz Insulating Fluid: Mineral Oil Cooling Class: ONAN
Pri. Voltage: 13200 Taps: Two 2.5% A&B Nominal Connection: Delta BIL: 95 kV Conductor: Copper Sec. Voltage: 208Y/120 Taps: None Connection: Wye BIL: 30 kV Conductor: Copper
Ambient Temp: 30 C Temp Rise: 65 C Sound Level: NEMA Std. or Below Altitude: 3300 Ft. or Below
CONSTRUCTION
Transformer Type: Pad Mounted Tank Material: Mild Steel Terminal Cabinets: Full Height Quantity: 1 Material: Mild Steel
Pri. Bushings: Dead Front, Radial Feed Quantity: 3 Location: Left Side of ATC kV Class: 15 kV
AMPS: 200
Sec. Bushings: Spade Quantity: 4 Location: Right Side of ATC kV Class: 1.2 kV Material: Porcelain
| Base: | C-Channel |
| Cover: | Bolted |
Radiators: Corrugated Material: Mild Steel
3.0 MILESTONES
The contractor shall deliver one (1) pad mount transformer no later than 61 Weeks ARO.
4.0 DELIVERABLES
Before delivery, the contractor shall contact MSgt Chaz Lineberger at 575-572-0813 to schedule a delivery date and time. 1273 Bear Path Rd, B901, Holloman AFB 88330.
-0-
File details come from the government source that posted it. Updated .