QA Modular Office Trailer with Site Pictures.pdf
PDF 5 MB Posted
- Attached to
- Modular Office Trailer Federal contract opportunity
- Solicitation number
- FA480124Q0011
About this file
This document is a solicitation (Solicitation #FA480124Q0011) for a Modular Office Trailer requirement for the Department of the Air Force Air Combat Command.
The key details are:
- The government is seeking a contractor to provide a modular office trailer, including utility hookups to water, sewer, and electrical, with one male and one female latrine, and furnishings (35 desks and 35 chairs). The trailer must accommodate 35 workstations.
- This is a new requirement, not a follow-on.
- The period of performance is 12 months base period with two 12-month option periods.
- The trailer must be move-in ready by 30 September 2024.
- This is a competitive Women-Owned Small Business (WOSB) set-aside under NAICS code 321992.
- Questions are due by 14 August 2024 and offers are due by 19 August 2024 at 4:30pm MST.
- Award is expected on or about 30 August 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Atch 2 WD 2015-5229 Rev 24_22Jul2024.pdf | ||
| Atch 3 Installation Access Memo_09Jan24.docx | DOCX document | |
| Atch 1 SOW Office Trailer_31Jul2024.pdf | ||
| Solicitation - FA480124Q0011.pdf | ||
| Atch 1.1 Site Map_22May2024.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #FA480124Q0011
Modular Office Trailer Solicitation - FA480124Q0011
Important Notices:
Instructions to submit quotes are provided in the addendum to 52.212-1 within the Solicitation FA480124Q0011 (on Page 24). Nonresponsive quotes will not be evaluated or considered.
Site map has been updated. Please see page 2 of this document.
Questions and Answers:
Q1: Is this a new requirement or a follow on?
A1: This is a new requirement, not a follow-on.
Q2: Is there a preferred floor plan for this project?
A2: There is no preferred floorplan, but it must comfortably accommodate 35 workstations as well as one male and one female latrine.
Q3: How far are the connections from the building?
A3: The connections are within 25-50 feet of where the trailer will be placed. See Site Plan.
Q4: When do you want the building up and running?
A4: 1 October 2024
Q5: What size and or floor plan are you looking for?
A5: There is no preferred size and floor plan but must comfortably accommodate 35 workstations as well as one male and one female latrine.
Q6: Please confirm the available capacity and phasing of the existing electrical on-site.
A6: 3 Phase, as far as available capacity we do not have the expertise to say, contractor will have to evaluate onsite. See Data Plate.
Q7: Please confirm the size of the existing water and sewer lines that the modular building is to be connected to.
A7: Water line has a 4” connection and sewer line has a 4” connection.
Q8: Will a 24x60 office trailer suffice for this project?
A8: No, we do not believe that will be enough square feet to reasonably accommodate 35 workstations to include one male and one female latrine.
Q9: Are ADA ramps and steps needed?
A9: Not required but acceptable if included.
Updated Site Map:
Site Pictures:
Water and Sewer Hookups:
Breaker Box:
Breaker Box Data Plate:
Electrical Hookups: