Attach_1_-_Statement_of_Work.pdf
PDF 82 KB Posted
- Attached to
- Remove and Replace Lockers
- Solicitation number
- FA4801-15-R-0035
About this file
Statement of Work
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Lockers_Layout.xlsx | XLSX spreadsheet | |
| Questions_and_Answers_25SEP15.pdf | ||
| FA4801-15-R-0035.pdf | ||
| Attach_2_-_WD_05-2511_Rev-20.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
September 9, 2015
1. PROJECT DATA:
TITLE: Remove/Replace With New Lockers, LOCKER ROOMS, FITNESS CENTER, B588
LOCATION: Holloman AFB, NM
2. SCOPE OF WORK (SOW) BASE BID:
The Contractor shall provide all labor, material, and equipment necessary for the following tasks IAW 2013
HAFB Design Compatibility Standards and any other applicable Federal, State and Local standards.
2.1 Remove 194 existing double tier metal lockers (12”D x 12”W x 30”H) and replace with 194 single tier Metal Lockers (12”D x 12”W x 60”H) lockers in the Men’s Locker Room (R158) and remove 84 double tier metal lockers (12”D x 12”W x 30”H) and replace with 84 single tier (12”D x 12”W x
60”H) locker in Women’s Locker Room (R142).
Provide vented single tier metal lockers with slope hoods, top shelf’s (5”Opening Down from
Top of Door Opening), 3 hooks below shelf 1 per each side to hanger clothing, consecutive number plates for each locker room, end panels, padlock compatible latches tan in color or equal.
2.1.1 Seal lockers outside seems to prevent water infiltration behind lockers.
2.1.2 Repair drywall, trim work and match existing paint color around and behind the lockers in both locker rooms resulting from removal of existing lockers.
2.2 Turn-in removed lockers to Defense Reutilization Management Office (DRMO). P.O.C. for Force Support
Squadron (FSS) for coordination of delivery is Mr. Bradley George 575-572-2533.
3. SUBMITTAL REQUIREMENTS:
The Contractor shall provide manufacturer’s literature and color charts with proposal.
a. Replacement Lockers
4. PEFORMANCE PERIOD:
4.1 Performance period will be 120 calendar days from award of contract.
General Notes: Contractor is highly encouraged to conduct site visit(s) in order to become familiar with the existing conditions, analyze the electrical distribution system, its components, take the necessary equipment readings, and run any necessary sizing calculations. Contractor shall follow all applicable building, plumbing, and electrical codes, federal and state regulations. Note: All work shall be performed IAW HAFB Design
Compatibility Standards, applicable Unified Facility Criteria (UFC), federal, state, and local regulations and standards governing this type of work. In the event of conflicts between standards, UFCs will take precedence over any other code or standard. Contractor shall record where the “as needed” work was performed and immediately furnish this information to the government Contracting Officer Representative (COR) and/or
Project Engineer.