This Statement of Requirement (SOR) details the procurement and installation of window blinds for Building 661 at Joint Base Langley-Eustis, VA. The contractor must provide and install Norman Window Fashions PureVu Honeycomb Shade or equivalent cellular-style blinds for 24 windows: 18 units at 17'x9'8", 5 units at 4'2"x9'8", and 1 unit at 12'x9". All blinds must be white with medium light filtering.
The work includes removal and disposal of existing blinds and hardware, with the contractor responsible for cleanup and off-base disposal. Work hours are 0700-1700 on weekdays, excluding federal holidays. Questions are due February 4, 2025, and quotes are due February 5, 2025, to be submitted to Annmarie Shields via email. The opportunity is being managed by the 633d Contracting Squadron at Langley AFB for the Air Combat Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Combo Solicitation FA480025QA027 ACC Bldg 661 Window Blinds.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF REQUIREMENT
Procurement and Installation of Window Blinds
(BRAND NAME OR EQUALIVALENT)
Bldg. 661, Joint Base Langley-Eustis, VA (JBLE)
1.0 OBJECTIVE. Procurement and installation of window blinds to fit multiple size windows within bldg. 661 located on JBLE.
2.0 SCOPE.
2.1 The contractor shall furnish all materials, equipment, tools, labor and incidentals as required for the procurement and installation of new cellular-style window blinds in bldg. 661. The contractor will remove and dispose of existing blinds and associated hardware. Upon completion of new window blinds installation, the contractor shall ensure the Facility Manager has all warranty and manufacturer documents.
2.2 Execution of work shall be IAW the applicable contract documents, clauses, and any installation requirements.
2.3 Any individual performing technician services shall have up-to-date certifications or training on the installed system(s). The contractor shall provide a list of the personnel performing the work and documentation of their certifications to the On-Site Representative.
2.4 Work Area Requirements. The contractor shall clean up all debris and discarded materials resulting from their operations at the end of each workday. All waste materials shall be disposed of off Langley unless otherwise approved.
2.5 There shall be no deviations or substitutions without prior approval from the Contracting Officer. The contractor shall not comply with any order, direction, or request of any government personnel unless it is issued in writing and signed by the Contracting Officer.
3.0 SECURITY.
3.1 All work shall be performed during hours as coordinated with an on-site representative. The on-site representative will ensure the contractor’s employees and subcontractors have access to the site five days a week, 0700 to 1700, as a minimum, excluding US Federal holidays.
3.2 The contractor shall be responsible for safeguarding all government equipment, information, and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
4.0 MATERIALS.
4.1 Requested: NORMAN WINDOW FASHIONS PUREVU HONEYCOMB SHADE (BRAND NAME OR EQUALIVALENT WILL BE ACCEPTED)
The contractor shall provide blinds for the twenty-four windows, here divided by size quantities:
| Qty 18 | 17’wide x 9’8” long |
| Qty 5 | 4’2”wide x 9’8” long |
| Qty 1 | 12’wide x 9” long |
Color – WHITE.