SOW - B661 Carpet Replacement.pdf

PDF 18 MB Posted

Attached to
TRADOC Bldg 661 Carpet Replacement (Fort Eustis)
Solicitation number
FA4800-24-Q-A083
Issued by

About this file

This document is a Statement of Work (SOW) for a carpet replacement project at TRADOC Building 661 at Fort Eustis. The related federal contract opportunity is Solicitation FA4800-24-Q-A083, which is a requirement for a carpet replacement to be awarded to the vendor offering the lowest price technically acceptable. The solicitation is for NAICS 238330, and vendors do not need to have this NAICS listed in their SAM profile when responding, but must provide a statement on their small business status under the $19 million size standard. A site visit will not be offered unless needed due to the detailed drawings provided. Interested vendors should contact Mr. Corey Powell at corey.powell.1@us.af.mil or 757-225-4010 for any questions.

View the file

Other files

File Type Posted
BASE ACCESS REQUEST.pdf PDF
BLDG 661 COMBINED SYNOPSIS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Project Title:

Fort Eustis - Building 661, Carpet Replacement Project

Project Overview:

This project entails the replacement of carpet tiles for Building 661, covering a total area of approximately 64,764 square feet. The areas to be addressed are identified on the left side of the floor plans with total square footage in Attachment 1 “B661 Floor Plans”.

Scope of Work:

1. Preparation:

- Coordination: Prior to commencing work in any section, coordinate with the Government Building Manager to allow adequate time for the government to relocate file cabinets, personnel, and belongings.

- Furniture and Cubicle Lifting: Lift furniture and cubicles as necessary to facilitate carpet installation. The contractor is responsible for any damages incurred during installation.

- Carpet Removal and Disposal: Remove and dispose of approximately 64,764 square feet of existing carpet tiles.

- Vinyl Cove Base: The existing vinyl cove base will remain on the walls. The contractor will be responsible for replacing any damaged vinyl cove base during installation.

2. Carpet Installation:

- Material: Install Shaw Contract Kasuri Tile (Style Number: 5T046, Color Name: Glint, Color Number: 92496) in the specified areas, as detailed in Attachment 2, 'Carpet Tile Specifications.'

- Installation Method: Follow the manufacturer’s recommended installation method, utilizing the monolithic pattern.

- Adherence to Guidelines: Ensure that carpet tiles are installed smoothly and securely, adhering to the Shaw Soil Protection (SSP) guidelines.

3. Project Phasing/Timeline:

- Sectional Installation: Complete the installation in sections as specified by the Government Building Manager, ensuring minimal disruption to the building’s operations.

- Notification: Provide the Government Building Manager with a 15-day notice before beginning work on each section.

- Planning Factor: A planning factor of 1,500 square feet per 8-hour period is recommended.

The Building Manager is open to adjustments if a more efficient phase plan is proposed and coordinated.

Deliverables:

- Installation Schedule: Coordinate with the Government Building Manager to develop a detailed installation schedule with specified completion dates.

- Completed Installation: Properly installed carpet tiles in the designated areas.

- Issue Documentation: Provide documentation of any issues encountered and the resolutions implemented.

Working Hours of Operation:

Monday – Friday: 4:30 PM – 12:30 AM (Staging may begin as early as 3:30PM) Saturday: 8:00 AM – 4:00 PM Sunday: No work permitted per building management.

**Escorts will be provided by the government**

Roles and Responsibilities:

1. Contractor:

- Responsible for lifting cubicles and furniture for carpet installation.

- Installing carpet tiles according to the specified pattern and guidelines.

- Maintaining clear communication with the Government Building Manager.

2. Government Building Management:

- Provide contractor access and required escorts to the areas needing carpet replacement.

- Allocate space for storing materials, equipment, and a refuse dumpster.

- Ensure all personnel and belongings are moved, and electrical equipment is unplugged within the designated work areas before carpet replacement.

Acceptance Criteria:

- The carpet tiles must be installed correctly, with no visible defects.

- The installation must follow the monolithic pattern as specified.

- All areas must be clean and free of debris after installation.

Terms and Conditions:

- The contractor must adhere to all safety regulations and building codes.

- Any required changes to the scope of work must be communicated to the contract specialist/officer.

- The contractor will provide a warranty for the installation work as specified by the manufacturer.

Attachments:

1. Atch 1 – B661 Floor Plans

2. Atch 2 – Carpet Tile Specifications

Fort_Eustis AFB Facility: 661 Floor: 1

Space Type Sq Ft

BREAK 240

CONFERENCE 1,830

ELECTRICAL 84

ELEVATOR 57

ENTRY 277

HALLWAY 260

JANITORS_CLOSET 23

OFFICE_HOT_DESK 371

OFFICE_PRIVATE 4,031

OFFICE_SHARED 15,183

OFFICE_SUPPORT 603

RECEPTION 1,332

RESTROOM 379

STAIRWAY 332

STORAGE_WARE 81

VAULT 728

Attachment 5 (Bldg 661-1st Floor) to FY24 TRADOC Carpet Replacement Project

Space Type SqFt

Conference 1,830

Hallway 260

Hot Desk 371

Private 4,031

Shared 15,183

Office Support

Reception 1,332

Vault 728

24,338

Floor: 2

Space Type Sq Ft

BREAK 310

CLASSROOM 786

CONFERENCE 1,428

ELECTRICAL 63

ELEVATOR 57

HALLWAY 366

JANITORS_CLOSET 23

OFFICE_HOT_DESK 462

OFFICE_PRIVATE 3,243

OFFICE_SHARED 12,923

OFFICE_SUPPORT 450

RECEPTION 771

RESTROOM 321

STAIRWAY 310

STORAGE_ADMIN 65

Attachment 6 (Bldg 661-2nd Floor) to FY24 TRADOC Carpet Replacement Project

Space Type SqFt

Classroom 786

Conference 1,428

Hallway 366

Hot Desk 462

Private 3,243

Shared 12,923

Office Support

Reception 771

20,429

Floor: 3

Space Type Sq Ft

BREAK 254

CONFERENCE 1,880

ELECTRICAL 65

ELEVATOR 57

HALLWAY 908

JANITORS_CLOSET 26

OFFICE_HOT_DESK 413

OFFICE_PRIVATE 4,178

OFFICE_SHARED 11,315

OFFICE_SUPPORT 637

RECEPTION 666

RESTROOM 321

STAIRWAY 310

STORAGE_ADMIN 135

Attachment 7 (Bldg 661-3rd Floor) to FY24 TRADOC Carpet Replacement Project

Space Type SqFt

Conference 1,880

Hallway 908

Hot Desk 413

Private 4,178

Shared 11,315

Office Support

Reception 666

19,997

SOW - B661 Carpet Replacement
Project Title:
Project Overview:
Scope of Work:
1. Preparation:
2. Carpet Installation:
3. Project Phasing/Timeline:
Deliverables:
Working Hours of Operation:
Roles and Responsibilities:
1. Contractor:
2. Government Building Management:
Acceptance Criteria:
Terms and Conditions:
Attachments:
Atch 1 - B661 Floor Plans
Att 5_661-1 to FY24 Carpet Replacement Project
Slide Number 1
Att 6_661-2 to FY24 Carpet Replacement Project
Slide Number 1
Att 7_661-3 to FY24 Carpet Replacement Project
Slide Number 1
Atch 2 - Carpet Tile Specifications
Atch 2 - B950 Carpet Model
Atch 3 - B950 Carpet Image

File details come from the government source that posted it. Updated .