SOW - B661 Carpet Replacement.pdf
PDF 18 MB Posted
- Attached to
- TRADOC Bldg 661 Carpet Replacement (Fort Eustis)
- Solicitation number
- FA4800-24-Q-A083
About this file
This document is a Statement of Work (SOW) for a carpet replacement project at TRADOC Building 661 at Fort Eustis. The related federal contract opportunity is Solicitation FA4800-24-Q-A083, which is a requirement for a carpet replacement to be awarded to the vendor offering the lowest price technically acceptable. The solicitation is for NAICS 238330, and vendors do not need to have this NAICS listed in their SAM profile when responding, but must provide a statement on their small business status under the $19 million size standard. A site visit will not be offered unless needed due to the detailed drawings provided. Interested vendors should contact Mr. Corey Powell at corey.powell.1@us.af.mil or 757-225-4010 for any questions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BASE ACCESS REQUEST.pdf | ||
| BLDG 661 COMBINED SYNOPSIS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Project Title:
Fort Eustis - Building 661, Carpet Replacement Project
Project Overview:
This project entails the replacement of carpet tiles for Building 661, covering a total area of approximately 64,764 square feet. The areas to be addressed are identified on the left side of the floor plans with total square footage in Attachment 1 “B661 Floor Plans”.
Scope of Work:
1. Preparation:
- Coordination: Prior to commencing work in any section, coordinate with the Government Building Manager to allow adequate time for the government to relocate file cabinets, personnel, and belongings.
- Furniture and Cubicle Lifting: Lift furniture and cubicles as necessary to facilitate carpet installation. The contractor is responsible for any damages incurred during installation.
- Carpet Removal and Disposal: Remove and dispose of approximately 64,764 square feet of existing carpet tiles.
- Vinyl Cove Base: The existing vinyl cove base will remain on the walls. The contractor will be responsible for replacing any damaged vinyl cove base during installation.
2. Carpet Installation:
- Material: Install Shaw Contract Kasuri Tile (Style Number: 5T046, Color Name: Glint, Color Number: 92496) in the specified areas, as detailed in Attachment 2, 'Carpet Tile Specifications.'
- Installation Method: Follow the manufacturer’s recommended installation method, utilizing the monolithic pattern.
- Adherence to Guidelines: Ensure that carpet tiles are installed smoothly and securely, adhering to the Shaw Soil Protection (SSP) guidelines.
3. Project Phasing/Timeline:
- Sectional Installation: Complete the installation in sections as specified by the Government Building Manager, ensuring minimal disruption to the building’s operations.
- Notification: Provide the Government Building Manager with a 15-day notice before beginning work on each section.
- Planning Factor: A planning factor of 1,500 square feet per 8-hour period is recommended.
The Building Manager is open to adjustments if a more efficient phase plan is proposed and coordinated.
Deliverables:
- Installation Schedule: Coordinate with the Government Building Manager to develop a detailed installation schedule with specified completion dates.
- Completed Installation: Properly installed carpet tiles in the designated areas.
- Issue Documentation: Provide documentation of any issues encountered and the resolutions implemented.
Working Hours of Operation:
Monday – Friday: 4:30 PM – 12:30 AM (Staging may begin as early as 3:30PM) Saturday: 8:00 AM – 4:00 PM Sunday: No work permitted per building management.
**Escorts will be provided by the government**
Roles and Responsibilities:
1. Contractor:
- Responsible for lifting cubicles and furniture for carpet installation.
- Installing carpet tiles according to the specified pattern and guidelines.
- Maintaining clear communication with the Government Building Manager.
2. Government Building Management:
- Provide contractor access and required escorts to the areas needing carpet replacement.
- Allocate space for storing materials, equipment, and a refuse dumpster.
- Ensure all personnel and belongings are moved, and electrical equipment is unplugged within the designated work areas before carpet replacement.
Acceptance Criteria:
- The carpet tiles must be installed correctly, with no visible defects.
- The installation must follow the monolithic pattern as specified.
- All areas must be clean and free of debris after installation.
Terms and Conditions:
- The contractor must adhere to all safety regulations and building codes.
- Any required changes to the scope of work must be communicated to the contract specialist/officer.
- The contractor will provide a warranty for the installation work as specified by the manufacturer.
Attachments:
1. Atch 1 – B661 Floor Plans
2. Atch 2 – Carpet Tile Specifications
Fort_Eustis AFB Facility: 661 Floor: 1
Space Type Sq Ft
BREAK 240
CONFERENCE 1,830
ELECTRICAL 84
ELEVATOR 57
ENTRY 277
HALLWAY 260
JANITORS_CLOSET 23
OFFICE_HOT_DESK 371
OFFICE_PRIVATE 4,031
OFFICE_SHARED 15,183
OFFICE_SUPPORT 603
RECEPTION 1,332
RESTROOM 379
STAIRWAY 332
STORAGE_WARE 81
VAULT 728
Attachment 5 (Bldg 661-1st Floor) to FY24 TRADOC Carpet Replacement Project
Space Type SqFt
Conference 1,830
Hallway 260
Hot Desk 371
Private 4,031
Shared 15,183
Office Support
Reception 1,332
Vault 728
24,338
Floor: 2
Space Type Sq Ft
BREAK 310
CLASSROOM 786
CONFERENCE 1,428
ELECTRICAL 63
ELEVATOR 57
HALLWAY 366
JANITORS_CLOSET 23
OFFICE_HOT_DESK 462
OFFICE_PRIVATE 3,243
OFFICE_SHARED 12,923
OFFICE_SUPPORT 450
RECEPTION 771
RESTROOM 321
STAIRWAY 310
STORAGE_ADMIN 65
Attachment 6 (Bldg 661-2nd Floor) to FY24 TRADOC Carpet Replacement Project
Space Type SqFt
Classroom 786
Conference 1,428
Hallway 366
Hot Desk 462
Private 3,243
Shared 12,923
Office Support
Reception 771
20,429
Floor: 3
Space Type Sq Ft
BREAK 254
CONFERENCE 1,880
ELECTRICAL 65
ELEVATOR 57
HALLWAY 908
JANITORS_CLOSET 26
OFFICE_HOT_DESK 413
OFFICE_PRIVATE 4,178
OFFICE_SHARED 11,315
OFFICE_SUPPORT 637
RECEPTION 666
RESTROOM 321
STAIRWAY 310
STORAGE_ADMIN 135
Attachment 7 (Bldg 661-3rd Floor) to FY24 TRADOC Carpet Replacement Project
Space Type SqFt
Conference 1,880
Hallway 908
Hot Desk 413
Private 4,178
Shared 11,315
Office Support
Reception 666
19,997
| SOW - B661 Carpet Replacement |
| Project Title: |
| Project Overview: |
| Scope of Work: |
| 1. Preparation: |
| 2. Carpet Installation: |
| 3. Project Phasing/Timeline: |
| Deliverables: |
| Working Hours of Operation: |
| Roles and Responsibilities: |
| 1. Contractor: |
| 2. Government Building Management: |
| Acceptance Criteria: |
| Terms and Conditions: |
| Attachments: |
| Atch 1 - B661 Floor Plans |
| Att 5_661-1 to FY24 Carpet Replacement Project |
| Slide Number 1 |
| Att 6_661-2 to FY24 Carpet Replacement Project |
| Slide Number 1 |
| Att 7_661-3 to FY24 Carpet Replacement Project |
| Slide Number 1 |
| Atch 2 - Carpet Tile Specifications |
| Atch 2 - B950 Carpet Model |
| Atch 3 - B950 Carpet Image |
File details come from the government source that posted it. Updated .